  • National Bridge Inventory (NBI) Statistics
  • 21Number of bridges
  • 167ft / 51.3mTotal length
  • $21,194,000Total costs
  • 210,101Total average daily traffic
  • 44,814Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Jemison
  • No street view available for this location

New bridges in Jemison, AL - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11940-1949
  • 51950-1959
  • 61960-1969
  • 11970-1979
  • 21980-1989
  • 32000-2009
  • 22010-2019
Reconstructed bridges in Jemison, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 11990-1999
Average Bridge Daily Traffic in Jemison, AL
Average Bridge Truck Traffic in Jemison, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 22.2%Excellent
  • 11.1%Very good
  • 33.3%Good
  • 22.2%Satisfactory
  • 11.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Excellent
  • 11.1%Very good
  • 22.2%Good
  • 22.2%Satisfactory
  • 11.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 22.2%Excellent
  • 11.1%Very good
  • 44.4%Good
  • 11.1%Satisfactory
  • 11.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.3%Very good
  • 57.1%Good
  • 28.6%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Very good
  • 22.2%Good
  • 33.3%Satisfactory
  • 11.1%Fair
Find on map >>   Show street view

Structure Number: 253,  Location: CR33 .5 E PROVIDENCE CHUR (Lat: 33.023753,  Lng: -86.791183),  Route carried "on" structure: County highway ,  Year Built: 1925,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 600 (year 1985),  Truck Traffic: 1%,  Average Future Daily Traffic: 650 (year 2029),  Design Load: HS 20,  Features Intersected: WATSON CREEK,  Facility Carried by Structure: CR33 OLD HWY 31
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 50.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $218,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $240,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 253,  Location: 2.3 MI N JCT SR 155 (Lat: 33.023067,  Lng: -86.764733),  Route carried "on" structure: US 31,  Year Built: 1941,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 3,770 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,843 (year 2041),  Design Load: H 15,  Features Intersected: CLEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 381.720,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.9m (16.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $818,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $900,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6456,  Location: 1.5 MI JCT CO RD 51 (Lat: 32.980000,  Lng: -86.688167),  Route carried "on" structure: County highway 42,  Year Built: 1959,  Status: Open,  Structure Length: 7.52m (24.67ft),  Average Daily Traffic: 300 (year 2008),  Truck Traffic: 1%,  Average Future Daily Traffic: 400 (year 2028),  Design Load: HS 20,  Features Intersected: I-65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.54m (28.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,933,000,  Roadway Improvement Cost: $193,000,  Total Project Cost: $2,126,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6457,  Location: 1.5 MI N JCT CO RD 42 (Lat: 32.998567,  Lng: -86.701083),  Route carried "on" structure: County highway 51,  Year Built: 1959,  Status: Open,  Structure Length: 8.63m (28.31ft),  Average Daily Traffic: 350 (year 2008),  Truck Traffic: 1%,  Average Future Daily Traffic: 500 (year 2028),  Design Load: H 20,  Features Intersected: I-65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 9.62m (31.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,912,000,  Roadway Improvement Cost: $191,000,  Total Project Cost: $2,103,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6795,  Location: 4.7 MI N JCT SR 145 (Lat: 32.944667,  Lng: -86.665933),  Route carried "on" structure: County highway 48,  Year Built: 1960,  Status: Open,  Structure Length: 11.80m (38.71ft),  Average Daily Traffic: 350 (year 2008),  Truck Traffic: 1%,  Average Future Daily Traffic: 500 (year 2028),  Design Load: H 20,  Features Intersected: I-65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 1,  Length of Maximum Span: 29.3m (96.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 50.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 12.66m (41.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,430,000,  Roadway Improvement Cost: $243,000,  Total Project Cost: $2,673,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6796,  Location: 2.2 MI S JCT CO RD 51 (Lat: 32.951533,  Lng: -86.669200),  Route carried "on" structure: Interstate 65,  Year Built: 1960,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 39,800 (year 2013),  Truck Traffic: 23%,  Average Future Daily Traffic: 59,700 (year 2041),  Design Load: HS 20,  Features Intersected: Turkey Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 349.212,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $4,168,000,  Roadway Improvement Cost: $417,000,  Total Project Cost: $4,585,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6797,  Location: 4.3 MI S SHELBY CO LINE (Lat: 33.009733,  Lng: -86.709883),  Route carried "on" structure: Interstate 65,  Year Built: 1960,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 19,495 (year 2013),  Truck Traffic: 22%,  Average Future Daily Traffic: 29,243 (year 2041),  Design Load: HS 20,  Features Intersected: COBB CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 356.724,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 77.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $779,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $857,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6798,  Location: 4.3 MI S SHELBY CO LINE (Lat: 33.010300,  Lng: -86.709417),  Route carried "on" structure: Interstate 65,  Year Built: 1960,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 19,495 (year 2013),  Truck Traffic: 22%,  Average Future Daily Traffic: 24,699 (year 2041),  Design Load: HS 20,  Features Intersected: COBB CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 356.724,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,089,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,198,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 787,  Location: CR38 .6 M NE CNTR HILL CH (Lat: 32.969567,  Lng: -86.766178),  Route carried "on" structure: County highway ,  Year Built: 1963,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 300 (year 1985),  Truck Traffic: 1%,  Average Future Daily Traffic: 350 (year 2033),  Design Load: H 15,  Features Intersected: MAHAN CREEK,  Facility Carried by Structure: CR38 MATTIE COBB R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $458,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $504,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13184,  Location: CR25 1MI S CENTER HILLCH (Lat: 32.964675,  Lng: -86.775472),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 450 (year 1985),  Truck Traffic: 1%,  Average Future Daily Traffic: 475 (year 2030),  Design Load: H 15,  Features Intersected: MAHAN CREEK,  Facility Carried by Structure: CR25 CENTERHILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 77.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.02m (6.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $489,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $538,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13468,  Location: CR151 2MI N ROCKY MT CH (Lat: 33.020897,  Lng: -86.701617),  Route carried "on" structure: County highway ,  Year Built: 1950,  Year Reconstructed: 1985,  Status: Posted for load,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 100 (year 1985),  Average Future Daily Traffic: 125 (year 2033),  Design Load: H 10,  Features Intersected: CR151 THIRD BRANCH,  Facility Carried by Structure: CR 151 HARKINS RD
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 25.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $179,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $197,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 14789,  Location: CR91 2M S PROVIDENCE CH (Lat: 32.984542,  Lng: -86.813378),  Route carried "on" structure: County highway ,  Year Built: 1989,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 400 (year 1989),  Truck Traffic: 1%,  Average Future Daily Traffic: 500 (year 2033),  Design Load: H 15,  Features Intersected: DRY CREEK,  Facility Carried by Structure: CO RD 91
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $486,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $535,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18795,  Location: CR48 1 M E COLLINS CHA CH (Lat: 32.944469,  Lng: -86.662958),  Route carried "on" structure: County highway 48,  Year Built: 2003,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 700 (year 1999),  Truck Traffic: 5%,  Average Future Daily Traffic: 790 (year 2029),  Features Intersected: TURKEY BRANCH
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 71.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $637,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $701,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18869,  Location: CR 107 1 M NE ED LEACH (Lat: 32.958075,  Lng: -86.835403),  Route carried "on" structure: County highway ,  Year Built: 1975,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 371 (year 2003),  Truck Traffic: 3%,  Average Future Daily Traffic: 555 (year 2030),  Features Intersected: POSSUM BRANCH,  Facility Carried by Structure: COUNTY ROAD 107
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Park, Forest, or Reservation Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 7.0m (23.0ft),  Right: 7.0m (23.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.39m (4.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $338,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $372,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19896,  Location: CR122 1.2 MNW MARS HILLCH (Lat: 32.971442,  Lng: -86.833361),  Route carried "on" structure: County highway 122,  Year Built: 2007,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 200 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 300 (year 2030),  Design Load: HS 20,  Features Intersected: DRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 75.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.31m (10.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $748,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $823,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 20165,  Location: CR120 1M N.W.MARS HILL CH (Lat: 32.963267,  Lng: -86.830297),  Route carried "on" structure: County highway 120,  Year Built: 2008,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 100 (year 2008),  Average Future Daily Traffic: 375 (year 2030),  Design Load: HS 20,  Features Intersected: MAHAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Very good,  Operating Rating: 75.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $385,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 20949,  Location: 1.3 MI N JCT US 31 (Lat: 32.993922,  Lng: -86.776633),  Route carried "on" structure: State highway 155,  Year Built: 2018,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 2,440 (year 2013),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,867 (year 2033),  Design Load: HL 93,  Features Intersected: CSX RR Active
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.059,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 0.0m,  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 86.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.91m (16.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,550,000,  Roadway Improvement Cost: $155,000,  Total Project Cost: $1,705,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21043,  Location: 0.1 mi. west CR 48 (Lat: 32.960028,  Lng: -86.723864),  Route carried "on" structure: City street 42,  Year Built: 2017,  Status: Open,  Structure Length: 1.23m (4.04ft),  Average Daily Traffic: 3,100 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,340 (year 2040),  Design Load: HS 20,  Features Intersected: Unnamed creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.922,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.91m (6.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $684,000,  Roadway Improvement Cost: $68,000,  Total Project Cost: $752,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6456,  Location: 1.5 MI JCT CO RD 51 (Lat: 32.980000,  Lng: -86.688167),  Route carried "under" structure: Interstate 65,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 38,990 (year 2013),  Truck Traffic: 22%,  Features Intersected: I-65,  Facility Carried by Structure: COUNTY ROAD 42
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 352.836,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 6457,  Location: 1.5 MI N JCT CO RD 42 (Lat: 32.998567,  Lng: -86.701083),  Route carried "under" structure: Interstate 65,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 38,990 (year 2013),  Truck Traffic: 22%,  Features Intersected: I-65,  Facility Carried by Structure: COUNTY ROAD 51
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 355.221,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 6795,  Location: 4.7 MI N JCT SR 145 (Lat: 32.944667,  Lng: -86.665933),  Route carried "under" structure: Interstate 65,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 39,800 (year 2013),  Truck Traffic: 23%,  Features Intersected: I-65,  Facility Carried by Structure: COUNTY ROAD 48
Minimum Vertical Clearance: 6.64m (21.78ft),  Kilometerpoint: 348.391,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 29.3m (96.1ft)

Discuss Jemison, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.