  • National Bridge Inventory (NBI) Statistics
  • 30Number of bridges
  • 404ft / 123mTotal length
  • $119,522,000Total costs
  • 547,206Total average daily traffic
  • 38,956Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Johnson City
  • No street view available for this location

New bridges in Johnson City, NY - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11920-1929
  • 11940-1949
  • 21950-1959
  • 141970-1979
  • 61980-1989
  • 11990-1999
  • 42000-2009
Reconstructed bridges in Johnson City, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11990-1999
  • 22000-2009
  • 12010-2019
Average Bridge Daily Traffic in Johnson City, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.9%Excellent
  • 58.8%Good
  • 29.4%Satisfactory
  • 5.9%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.9%Excellent
  • 17.6%Very good
  • 47.1%Good
  • 23.5%Satisfactory
  • 5.9%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.8%Very good
  • 47.1%Good
  • 35.3%Satisfactory
  • 5.9%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 18.2%Excellent
  • 18.2%Very good
  • 18.2%Good
  • 36.4%Satisfactory
  • 9.1%Fair
Find on map >>   Show street view

Structure Number: 101432,  Location: 1.1 MI E JCT SH17C &SH201 (Lat: 42.112439,  Lng: -75.948256),  Route carried "on" structure: State highway 17C,  Year Built: 1980,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 9,644 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 11,715 (year 2040),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.060,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 24 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 98.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.95m (9.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,777,000,  Roadway Improvement Cost: $1,626,000,  Total Project Cost: $4,403,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1063179,  Location: 0.5 MI E JCT RTS 17 + 17C (Lat: 42.120158,  Lng: -75.977194),  Route carried "on" structure: State highway 17,  Year Built: 1971,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 46,428 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 53,800 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: OAKDALE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.518,  Lanes on structure: 7,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 36.3m (119.1ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.4m (99.7ft),  Curb-To-Curb Width: 35.3m (115.8ft),  Out-to-Out Width: 37.2m (122.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.16m (10.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,863,000,  Roadway Improvement Cost: $2,262,000,  Total Project Cost: $6,125,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1063189,  Location: JCT RTS 201 + 17 (Lat: 42.119922,  Lng: -75.969156),  Route carried "on" structure: State highway 201,  Year Built: 1971,  Status: Open,  Structure Length: 6.61m (21.69ft),  Average Daily Traffic: 39,491 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 45,762 (year 2040),  Design Load: HS 20,  Features Intersected: 17 17 91071082EB, RTE 1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.154,  Lanes on structure: 6,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.3m (96.1ft),  Skew: 23 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 28.3m (92.8ft),  Out-to-Out Width: 30.1m (98.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.61m (21.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $5,155,000,  Roadway Improvement Cost: $3,019,000,  Total Project Cost: $8,174,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 106319,  Location: .2 MI E JCT SH 17 & SH 20 (Lat: 42.119717,  Lng: -75.965389),  Route carried "on" structure: Ramp State highway 17,  Year Built: 1971,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 52,780 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 61,161 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: FINCH HOLLOW CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.500,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 46.6m (152.9ft),  Skew: 22 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,568,000,  Roadway Improvement Cost: $918,000,  Total Project Cost: $2,486,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1063209,  Location: 0.7 MI E JCT RTS 17 + 201 (Lat: 42.119333,  Lng: -75.956456),  Route carried "on" structure: State highway 17,  Year Built: 1971,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 52,780 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 61,161 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: NORTH BROAD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.240,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 32.6m (107.0ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 31.8m (104.3ft),  Out-to-Out Width: 33.7m (110.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 37.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.23m (10.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $3,371,000,  Roadway Improvement Cost: $1,974,000,  Total Project Cost: $5,345,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1063219,  Location: 1.0 MI E JCT RTS 17 + 201 (Lat: 42.119792,  Lng: -75.950458),  Route carried "on" structure: State highway 17,  Year Built: 1971,  Status: Open,  Structure Length: 8.02m (26.31ft),  Average Daily Traffic: 52,780 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 61,161 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: LESTER AVENUE, LITTLE CH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.722,  Lanes on structure: 8,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 39.6m (129.9ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.3m (96.1ft),  Curb-To-Curb Width: 35.7m (117.1ft),  Out-to-Out Width: 37.5m (123.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.01m (26.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $7,037,000,  Roadway Improvement Cost: $4,121,000,  Total Project Cost: $11,158,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1063289,  Location: JCT RTS 201 & 17C (Lat: 42.115567,  Lng: -75.968264),  Route carried "on" structure: State highway 201,  Year Built: 1971,  Status: Open,  Structure Length: 29.81m (97.80ft),  Average Daily Traffic: 39,491 (year 2010),  Truck Traffic: 10%,  Average Future Daily Traffic: 45,762 (year 2040),  Design Load: HS 20,  Features Intersected: CROCKER PLACE, ENDWELL S
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 2.719,  Lanes on structure: 6,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 31.4m (103.0ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 40.2m (131.9ft),  Curb-To-Curb Width: 28.3m (92.8ft),  Out-to-Out Width: 30.2m (99.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Excellent,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 29.80m (97.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $18,996,000,  Roadway Improvement Cost: $11,124,000,  Total Project Cost: $30,120,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 106328A,  Location: JCT SH 201 & SH 17C (Lat: 42.117475,  Lng: -75.967956),  Route carried "on" structure: Ramp State highway 201,  Year Built: 1971,  Status: Open,  Structure Length: 7.62m (25.00ft),  Average Daily Traffic: 8,079 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 9,361 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: NORFOLK SOUTHERN RR, LIT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Excellent,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.62m (25.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,334,000,  Roadway Improvement Cost: $781,000,  Total Project Cost: $2,116,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1063309,  Location: .2 MI N JCT SH 201 & SH 1 (Lat: 42.123322,  Lng: -75.971281),  Route carried "on" structure: State highway 201,  Year Built: 1971,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 28,995 (year 2014),  Truck Traffic: 2%,  Average Future Daily Traffic: 35,223 (year 2040),  Design Load: H 20,  Features Intersected: FINCH HOLLOW CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.3m (92.8ft),  Skew: 36 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,290,000,  Roadway Improvement Cost: $1,341,000,  Total Project Cost: $3,631,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 107297,  Location: 0.2MI.S.JCT.RTES. 17 &201 (Lat: 42.109847,  Lng: -75.966994),  Route carried "on" structure: State highway 201,  Year Built: 1986,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 22.65m (74.31ft),  Average Daily Traffic: 39,303 (year 2010),  Truck Traffic: 10%,  Average Future Daily Traffic: 45,544 (year 2040),  Design Load: HS 20,  Features Intersected: GRAND AVENUE, CONRAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.027,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 22 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 36.5m (119.8ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 22.64m (74.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $10,710,000,  Roadway Improvement Cost: $6,272,000,  Total Project Cost: $16,982,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107848,  Location: Jcy Rte 201 & Ramp A (Lat: 42.107889,  Lng: -75.966561),  Route carried "on" structure: State highway 201,  Year Built: 2005,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 29,987 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 34,748 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: Ramp A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.786,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.4m (66.9ft),  Skew: 25 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.9m (111.2ft),  Curb-To-Curb Width: 20.4m (66.9ft),  Out-to-Out Width: 22.0m (72.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 96.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.68m (12.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,636,000,  Roadway Improvement Cost: $1,544,000,  Total Project Cost: $4,180,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107849,  Location: Jct Rte 201 & Ramp B (Lat: 42.106708,  Lng: -75.967317),  Route carried "on" structure: State highway 201,  Year Built: 2005,  Status: Open,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 29,987 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 34,748 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: Ramp B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.641,  Lanes on structure: 4,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.1m (69.2ft),  Skew: 25 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 20.4m (66.9ft),  Out-to-Out Width: 22.0m (72.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 45.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.44m (11.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,193,000,  Roadway Improvement Cost: $1,284,000,  Total Project Cost: $3,477,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22257,  Location: VILLAGE OF JOHNSON CITY (Lat: 42.121086,  Lng: -75.949014),  Route carried "on" structure: Other road ,  Year Built: 1957,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 210 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 294 (year 2038),  Design Load: HS 20,  Features Intersected: LITTLE CHOCONUT CK,  Facility Carried by Structure: OLD HARRY L DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $686,000,  Roadway Improvement Cost: $401,000,  Total Project Cost: $1,087,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 222571,  Location: VILLAGE OF JOHNSON CITY (Lat: 42.124603,  Lng: -75.975561),  Route carried "on" structure: Other road ,  Year Built: 1941,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 7,870 (year 2009),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,560 (year 2040),  Design Load: HS 20,  Features Intersected: FINCH HOLLOW CRK,  Facility Carried by Structure: HARRY L ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.595,  Lanes on structure: 6,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 0.0m,  Curb-To-Curb Width: 22.6m (74.1ft),  Out-to-Out Width: 26.1m (85.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,656,000,  Roadway Improvement Cost: $970,000,  Total Project Cost: $2,625,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 222581,  Location: VILLAGE OF JOHNSON CITY (Lat: 42.115703,  Lng: -75.950258),  Route carried "on" structure: Business Other road ,  Year Built: 1987,  Status: Open,  Structure Length: 6.64m (21.78ft),  Average Daily Traffic: 7,613 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 9,419 (year 2040),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN RR,  Facility Carried by Structure: LESTER AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.257,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.7m (77.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.64m (21.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,126,000,  Roadway Improvement Cost: $1,245,000,  Total Project Cost: $3,370,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 222583,  Location: VILLAGE OF JOHNSON CITY (Lat: 42.117511,  Lng: -75.957028),  Route carried "on" structure: Alternate Other road ,  Year Built: 1983,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 12.59m (41.31ft),  Average Daily Traffic: 3,653 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,519 (year 2040),  Design Load: HS 20,  Features Intersected: OLIVE STREET, LITTLE CHO,  Facility Carried by Structure: ARCH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.531,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 38.7m (127.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 12.58m (41.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $3,843,000,  Roadway Improvement Cost: $2,250,000,  Total Project Cost: $6,094,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 225765,  Location: VILLAGE OF JOHNSON CITY (Lat: 42.121878,  Lng: -75.948339),  Route carried "on" structure: Other road ,  Year Built: 1972,  Status: Open,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 8,408 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,214 (year 2040),  Features Intersected: LITTLE CHOCONUT CREEK,  Facility Carried by Structure: HARRY L.DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.977,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.1m (115.2ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.56m (11.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,700,000,  Roadway Improvement Cost: $1,581,000,  Total Project Cost: $4,282,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 226821,  Location: VILLAGE OF JOHNSON CITY (Lat: 42.124303,  Lng: -75.974856),  Route carried "on" structure: Other road ,  Year Built: 1990,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 13,701 (year 2013),  Truck Traffic: 7%,  Average Future Daily Traffic: 19,181 (year 2033),  Design Load: HS 20,  Features Intersected: FINCH HOLLOW CRK,  Facility Carried by Structure: WEGMANS-ENTRANCE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 5,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 0.0m,  Curb-To-Curb Width: 19.8m (65.0ft),  Out-to-Out Width: 24.5m (80.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,338,000,  Roadway Improvement Cost: $784,000,  Total Project Cost: $2,122,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334984,  Location: VILLAGE OF JOHNSON CITY (Lat: 42.117897,  Lng: -75.950561),  Route carried "on" structure: Other road ,  Year Built: 1956,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 2,954 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,654 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: LITT CHOCONUT CRK,  Facility Carried by Structure: LESTER AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.515,  Lanes on structure: 3,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Good,  Channel: Fair,  Operating Rating: 95.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.22m (7.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,100,000,  Roadway Improvement Cost: $644,000,  Total Project Cost: $1,745,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1063179,  Location: 0.5 MI E JCT RTS 17 + 17C (Lat: 42.120158,  Lng: -75.977194),  Route carried "under" structure: Business Other road ,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 4,647 (year 2018),  Truck Traffic: 5%,  Features Intersected: OAKDALE ROAD,  Facility Carried by Structure: RTE 17
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.4m (99.7ft)

Find on map >>   Show street view

Structure Number: 1063189,  Location: JCT RTS 201 + 17 (Lat: 42.119922,  Lng: -75.969156),  Route carried "under" structure: State highway 17,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 46,927 (year 1999),  Features Intersected: 17 17 91071082EB, RTE 1,  Facility Carried by Structure: RTE 201
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 13.178,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 1063209,  Location: 0.7 MI E JCT RTS 17 + 201 (Lat: 42.119333,  Lng: -75.956456),  Route carried "under" structure: Bypass Other road ,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 2,792 (year 2019),  Truck Traffic: 5%,  Features Intersected: NORTH BROAD ST,  Facility Carried by Structure: RTE 17
Minimum Vertical Clearance: 4.69m (15.39ft),  Kilometerpoint: 0.225,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 1063219,  Location: 1.0 MI E JCT RTS 17 + 201 (Lat: 42.119792,  Lng: -75.950458),  Route carried "under" structure: Bypass Other road ,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 2,954 (year 2020),  Truck Traffic: 2%,  Features Intersected: LESTER AVENUE, LITTLE CH,  Facility Carried by Structure: RTE 17
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.628,  Lanes on structure: 8,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>   Show street view

Structure Number: 1063289,  Location: JCT RTS 201 & 17C (Lat: 42.115567,  Lng: -75.968264),  Route carried "under" structure: State highway 17C,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 4,842 (year 1999),  Features Intersected: CROCKER PLACE, ENDWELL S,  Facility Carried by Structure: RTE 201
Minimum Vertical Clearance: 5.63m (18.47ft),  Kilometerpoint: 0.772,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 107297,  Location: 0.2MI.S.JCT.RTES. 17 &201 (Lat: 42.109847,  Lng: -75.966994),  Route carried "under" structure: Business City street ,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 1,785 (year 2014),  Truck Traffic: 5%,  Features Intersected: GRAND AVENUE, CONRAIL,  Facility Carried by Structure: RTE 201
Minimum Vertical Clearance: 8.99m (29.49ft),  Kilometerpoint: 0.290,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.5m (119.8ft)

Find on map >>   Show street view

Structure Number: 107848,  Location: Jcy Rte 201 & Ramp A (Lat: 42.107889,  Lng: -75.966561),  Route carried "under" structure: Other road ,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 7,000 (year 2004),  Features Intersected: Ramp A,  Facility Carried by Structure: RTE 201
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.9m (111.2ft)

Find on map >>   Show street view

Structure Number: 107849,  Location: Jct Rte 201 & Ramp B (Lat: 42.106708,  Lng: -75.967317),  Route carried "under" structure: Ramp State highway ,  Year Built: 2005,  Structure Length: 0. m,  Features Intersected: Ramp B,  Facility Carried by Structure: RTE 201
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 222583,  Location: VILLAGE OF JOHNSON CITY (Lat: 42.117511,  Lng: -75.957028),  Route carried "under" structure: Alternate Other road ,  Year Built: 1983,  Structure Length: 0. m,  Features Intersected: OLIVE STREET, LITTLE CHO,  Facility Carried by Structure: ARCH STREET
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.7m (127.0ft)

Find on map >>   Show street view

Structure Number: 701436,  Location: 1.2 MI.N.JCT.RTS.201+ 434 (Lat: 42.110817,  Lng: -75.967875),  Route carried "under" structure: State highway ,  Year Built: 1921,  Structure Length: 0. m,  Average Daily Traffic: 1,105 (year 2020),  Truck Traffic: 4%,  Features Intersected: RIVERSIDE DRIVE,  Facility Carried by Structure: NORFOLK SOUTHERN
Minimum Vertical Clearance: 3.68m (12.07ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 7.6m (24.9ft)

Find on map >>   Show street view

Structure Number: 770223,  Location: VILLAGE OF JOHNSON CITY (Lat: 42.118131,  Lng: -75.977011),  Route carried "under" structure: Other road ,  Year Built: 1910,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2021),  Features Intersected: OAKDALE ROAD,  Facility Carried by Structure: NORFOLK SOUTHERN
Minimum Vertical Clearance: 3.35m (10.99ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 11.2m (36.7ft)