Bridge Statistics for Johnston, Rhode Island (RI)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 30Number of bridges
  • 213ft / 64.5mTotal length
  • $27,092,000Total costs
  • 884,723Total average daily traffic
  • 93,946Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Johnston
  • No street view available for this location

New bridges in Johnston, RI - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11920-1929
  • 101960-1969
  • 41970-1979
  • 42010-2019
  • 102020-2022
Reconstructed bridges in Johnston, RI - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 21990-1999
  • 32000-2009
Average Bridge Daily Traffic in Johnston, RI
Average Bridge Truck Traffic in Johnston, RI
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 43.8%Very good
  • 18.8%Good
  • 25.0%Satisfactory
  • 12.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 47.1%Very good
  • 23.5%Satisfactory
  • 23.5%Fair
  • 5.9%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.8%Very good
  • 23.5%Good
  • 52.9%Satisfactory
  • 11.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Good
  • 50.0%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 146,  Location: 0.1 Mi E of JCT RI 128 (Lat: 41.859097,  Lng: -71.487389),  Route carried "on" structure: US 44,  Year Built: 1920,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 16,893 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 18,582 (year 2041),  Design Load: HS 20,  Features Intersected: WOONASQUATUCKET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.485,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 77.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $529,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $793,000
Find on map >>   Show street view

Structure Number: 3265,  Location: 0.9 Mi S of JCT RI 5 (Lat: 41.797836,  Lng: -71.505128),  Route carried "on" structure: City street ,  Year Built: 2018,  Status: Open,  Structure Length: 1.44m (4.72ft),  Average Daily Traffic: 5,588 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,147 (year 2041),  Design Load: HL 93,  Features Intersected: SIMMONS BROOK,  Facility Carried by Structure: SIMMONSVILLE AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.025,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.2m (33.5ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 64.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $9,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $14,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 608,  Location: 1 Mi E JCT RI 5 (Lat: 41.820331,  Lng: -71.478517),  Route carried "on" structure: US 6A,  Year Built: 1969,  Status: Open,  Structure Length: 5.58m (18.31ft),  Average Daily Traffic: 7,504 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 8,254 (year 2041),  Design Load: HS 20,  Features Intersected: US 6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.804,  Lanes on structure: 2,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 28.3m (92.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 42.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.58m (18.31ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $6,617,000,  Roadway Improvement Cost: $662,000,  Total Project Cost: $9,926,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 609,  Location: 1.0 Mi E of JCT RI 5 (Lat: 41.819356,  Lng: -71.480894),  Route carried "on" structure: US 6,  Year Built: 1969,  Status: Posted for load,  Structure Length: 3.99m (13.09ft),  Average Daily Traffic: 53,619 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 64,343 (year 2036),  Design Load: HS 20,  Features Intersected: US 6A HARTFORD AV RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.551,  Lanes on structure: 6,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.1m (111.9ft),  Skew: 34 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 30.5m (100.1ft),  Out-to-Out Width: 34.4m (112.9ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 16.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 12.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 3.99m (13.09ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2020,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $1,671,000,  Roadway Improvement Cost: $167,000,  Total Project Cost: $2,507,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 611,  Location: 1.0 Mi S of JCT RI 5 (Lat: 41.816967,  Lng: -71.496642),  Route carried "on" structure: US 6,  Year Built: 1971,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 300 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 330 (year 2041),  Design Load: HS 20,  Features Intersected: RI 5 ATWOOD AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.122,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.4m (112.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 32.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.54m (11.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $574,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $861,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 6112,  Location: 1.0 MI S JCT RI5 (Lat: 41.817197,  Lng: -71.496714),  Route carried "on" structure: US 6,  Year Built: 1971,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 59,500 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 65,450 (year 2041),  Design Load: HS 20,  Features Intersected: RI 5 ATWOOD AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.467,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.4m (112.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 39.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.54m (11.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $574,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $861,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 734,  Location: 1.0 Mi W of JCT RI 5 (Lat: 41.804511,  Lng: -71.510014),  Route carried "on" structure: Ramp City street ,  Year Built: 1969,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 4,536 (year 2021),  Truck Traffic: 30%,  Average Future Daily Traffic: 4,990 (year 2041),  Design Load: HS 20,  Features Intersected: I-295 NB,  Facility Carried by Structure: SCITUATE AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.039,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.8m (101.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 39.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.14m (10.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,099,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $1,649,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 7342,  Location: 1.0 Mi W of JCT RI 5 (Lat: 41.804567,  Lng: -71.510933),  Route carried "on" structure: Ramp City street ,  Year Built: 1969,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 4,536 (year 2021),  Truck Traffic: 30%,  Average Future Daily Traffic: 4,990 (year 2041),  Design Load: HS 20,  Features Intersected: I-295 SB,  Facility Carried by Structure: SCITUATE AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.688,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.8m (101.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 37.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.14m (10.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $778,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $1,167,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 735,  Location: 0.9 Mi S of JCT US 6 (Lat: 41.811394,  Lng: -71.509119),  Route carried "on" structure: Interstate 295,  Year Built: 1969,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 39,612 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 47,535 (year 2036),  Design Load: HS 20,  Features Intersected: CENTRAL PIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.218,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.77m (9.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $789,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $1,183,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 7352,  Location: 0.9 Mi S of JCT US 6 (Lat: 41.811519,  Lng: -71.509781),  Route carried "on" structure: Interstate 295,  Year Built: 1969,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 39,612 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 47,535 (year 2036),  Design Load: HS 20,  Features Intersected: CENTRAL PIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.051,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.87m (9.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $818,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $1,227,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 7375,  Location: 2.0 Mi W of JCT RI 5 (Lat: 41.820567,  Lng: -71.512456),  Route carried "on" structure: Interstate 295,  Year Built: 2020,  Status: Open,  Structure Length: 7.27m (23.85ft),  Average Daily Traffic: 45,140 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 48,152 (year 2036),  Design Load: HL 93,  Features Intersected: US 6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.281,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.9m (75.1ft),  Skew: 32 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 40.4m (132.5ft),  Curb-To-Curb Width: 22.9m (75.1ft),  Out-to-Out Width: 24.7m (81.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.13m (23.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $61,000,  Roadway Improvement Cost: $6,000,  Total Project Cost: $92,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 7377,  Location: 2.0 MI S of JCT US 6 (Lat: 41.820619,  Lng: -71.513056),  Route carried "on" structure: Interstate 295,  Year Built: 2019,  Status: Open,  Structure Length: 7.27m (23.85ft),  Average Daily Traffic: 45,140 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 48,152 (year 2036),  Design Load: HL 93,  Features Intersected: US 6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.997,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.0m (75.5ft),  Skew: 32 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 40.4m (132.5ft),  Curb-To-Curb Width: 23.0m (75.5ft),  Out-to-Out Width: 24.7m (81.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 55.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.25m (23.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $344,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $516,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 7405,  Location: 1.2 Mi S of JCT US 44 (Lat: 41.849433,  Lng: -71.510925),  Route carried "on" structure: Interstate 295,  Year Built: 2020,  Status: Open,  Structure Length: 2.94m (9.65ft),  Average Daily Traffic: 78,700 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 96,100 (year 2037),  Design Load: Greater than HL93,  Features Intersected: RI 5 GREENVILLE AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.595,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.5m (57.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 47.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,036,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $1,555,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 7407,  Location: 0.5Mi fm AtwoodGreen (Lat: 41.849578,  Lng: -71.511469),  Route carried "on" structure: Interstate 295,  Year Built: 2020,  Status: Open,  Structure Length: 2.98m (9.78ft),  Average Daily Traffic: 78,700 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 96,100 (year 2037),  Design Load: Greater than HL93,  Features Intersected: RI 5 GREENVILLE AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.559,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.1m (92.2ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.5m (57.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 59.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,036,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $1,555,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 7575,  Location: 2.6 Mi S of JCT US 44 (Lat: 41.828467,  Lng: -71.515939),  Route carried "on" structure: Interstate 295,  Year Built: 2020,  Status: Open,  Structure Length: 4.60m (15.09ft),  Average Daily Traffic: 93,250 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 102,575 (year 2041),  Design Load: Greater than HL93,  Features Intersected: US 6A HARTFORD PIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.223,  Lanes on structure: 5,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.7m (90.9ft),  Skew: 33 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 27.7m (90.9ft),  Out-to-Out Width: 29.6m (97.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.51m (14.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,105,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $1,658,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 7577,  Location: 2.6 Mi S of JCT US 44 (Lat: 41.828922,  Lng: -71.517417),  Route carried "on" structure: Interstate 295,  Year Built: 2020,  Status: Open,  Structure Length: 5.45m (17.88ft),  Average Daily Traffic: 180 (year 2021),  Truck Traffic: 19%,  Average Future Daily Traffic: 198 (year 2041),  Design Load: Greater than HL93,  Features Intersected: US 6A HARTFORD PIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.014,  Lanes on structure: 5,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 31.4m (103.0ft),  Skew: 34 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.3m (86.3ft),  Curb-To-Curb Width: 31.4m (103.0ft),  Out-to-Out Width: 33.2m (108.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 56.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.19m (23.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $934,000,  Roadway Improvement Cost: $93,000,  Total Project Cost: $1,401,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 1099,  Location: 500 ft east of RI 5 (Lat: 41.805144,  Lng: -71.488086),  Route carried "on" structure: Alternate City street ,  Year Built: 1900,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 2,630 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,893 (year 2041),  Design Load: HL 93,  Features Intersected: Pocasset River,  Facility Carried by Structure: Morgan Av
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.154,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 52.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.78m (2.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $85,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $127,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 1224,  Location: 1.1 mi W of I 295 SB (Lat: 41.803231,  Lng: -71.529464),  Route carried "on" structure: City street ,  Year Built: 2013,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 4,876 (year 2021),  Truck Traffic: 27%,  Average Future Daily Traffic: 5,364 (year 2041),  Design Load: HS 20,  Features Intersected: Ceder Swamp Brook,  Facility Carried by Structure: Shun Pike
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.040,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 96.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 74.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: 608,  Location: 1 Mi E JCT RI 5 (Lat: 41.820331,  Lng: -71.478517),  Route carried "under" structure: State highway 6,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 7,504 (year 2021),  Truck Traffic: 4%,  Features Intersected: US 6
Minimum Vertical Clearance: 4.24m (13.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.3m (92.8ft)

Find on map >>   Show street view

Structure Number: 609,  Location: 1.0 Mi E of JCT RI 5 (Lat: 41.819356,  Lng: -71.480894),  Route carried "under" structure: Ramp US 6A,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 1 (year 2006),  Features Intersected: US 6A HARTFORD AV RAMP,  Facility Carried by Structure: US 6 EB & WB
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 611,  Location: 1.0 Mi S of JCT RI 5 (Lat: 41.816967,  Lng: -71.496642),  Route carried "under" structure: State highway 5,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 300 (year 2021),  Truck Traffic: 15%,  Features Intersected: RI 5 ATWOOD AV,  Facility Carried by Structure: US 6 EB
Minimum Vertical Clearance: 4.74m (15.55ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: 6112,  Location: 1.0 MI S JCT RI5 (Lat: 41.817197,  Lng: -71.496714),  Route carried "under" structure: State highway 5,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 59,500 (year 2021),  Truck Traffic: 11%,  Features Intersected: RI 5 ATWOOD AV,  Facility Carried by Structure: US 6 WB
Minimum Vertical Clearance: 4.63m (15.19ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: 734,  Location: 1.0 Mi W of JCT RI 5 (Lat: 41.804511,  Lng: -71.510014),  Route carried "under" structure: Interstate 295,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 4,536 (year 2021),  Truck Traffic: 30%,  Features Intersected: I-295 NB,  Facility Carried by Structure: SCITUATE AV
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 7342,  Location: 1.0 Mi W of JCT RI 5 (Lat: 41.804567,  Lng: -71.510933),  Route carried "under" structure: Interstate 295,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 4,536 (year 2021),  Truck Traffic: 30%,  Features Intersected: I-295 SB,  Facility Carried by Structure: SCITUATE AV
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 7375,  Location: 2.0 Mi W of JCT RI 5 (Lat: 41.820567,  Lng: -71.512456),  Route carried "under" structure: US 195,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 60,000 (year 2008),  Truck Traffic: 10%,  Features Intersected: US 6,  Facility Carried by Structure: I-295 NB
Minimum Vertical Clearance: 7.11m (23.33ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.4m (132.5ft)

Find on map >>   Show street view

Structure Number: 7377,  Location: 2.0 MI S of JCT US 6 (Lat: 41.820619,  Lng: -71.513056),  Route carried "under" structure: US 6,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 60,000 (year 2008),  Truck Traffic: 10%,  Features Intersected: US 6,  Facility Carried by Structure: I-295 SB
Minimum Vertical Clearance: 7.14m (23.43ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.4m (132.5ft)

Find on map >>   Show street view

Structure Number: 7405,  Location: 1.2 Mi S of JCT US 44 (Lat: 41.849433,  Lng: -71.510925),  Route carried "under" structure: State highway 5,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 7,300 (year 2017),  Truck Traffic: 10%,  Features Intersected: RI 5 GREENVILLE AV
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 7407,  Location: 0.5Mi fm AtwoodGreen (Lat: 41.849578,  Lng: -71.511469),  Route carried "under" structure: State highway 5,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 7,300 (year 2017),  Truck Traffic: 10%,  Features Intersected: RI 5 GREENVILLE AV
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.1m (92.2ft)

Find on map >>   Show street view

Structure Number: 7575,  Location: 2.6 Mi S of JCT US 44 (Lat: 41.828467,  Lng: -71.515939),  Route carried "under" structure: US 6,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 93,250 (year 2021),  Truck Traffic: 15%,  Features Intersected: US 6A HARTFORD PIKE,  Facility Carried by Structure: I-295 NB
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 7577,  Location: 2.6 Mi S of JCT US 44 (Lat: 41.828922,  Lng: -71.517417),  Route carried "under" structure: US 6,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 180 (year 2021),  Truck Traffic: 19%,  Features Intersected: US 6A HARTFORD PIKE,  Facility Carried by Structure: I-295 SB
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.3m (86.3ft)

Discuss Johnston, Rhode Island (RI) on our hugely popular Rhode Island forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.