Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Kanorado, Kansas (KS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 148ft / 44.9mTotal length
  • 36,690Total average daily traffic
  • 7,300Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Kanorado
  • No street view available for this location

New bridges in Kanorado, KS - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 81960-1969
  • 11970-1979
  • 12000-2009
Average Bridge Daily Traffic in Kanorado, KS
Average Bridge Truck Traffic in Kanorado, KS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 87.5%Good
  • 12.5%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 87.5%Good
  • 12.5%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Very good
  • 87.5%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Very good
  • 33.3%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 91006,  Location: 4.0S 17.0W OF GOODLAND (Lat: 39.284622,  Lng: -102.023772),  Route carried "on" structure: County highway 288,  Year Built: 1954,  Status: Open,  Structure Length: 1.30m (4.27ft),  Average Daily Traffic: 140 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 150 (year 2040),  Design Load: H 15,  Features Intersected: TRIB SOUTH BEAVER CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 91007,  Location: 1.5S 17.0W OF GOODLAND (Lat: 39.319786,  Lng: -102.023436),  Route carried "on" structure: County highway 288,  Year Built: 1970,  Status: Posted for load,  Structure Length: 4.83m (15.85ft),  Average Daily Traffic: 140 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 150 (year 2040),  Design Load: H 15,  Features Intersected: MIDDLE BEAVER CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 26.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Other Special Inspection Date: January 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9101,  Location: 15.5W OF GOODLAND (Lat: 39.336211,  Lng: -101.993083),  Route carried "on" structure: County highway 2000,  Year Built: 2004,  Status: Open,  Structure Length: 4.58m (15.03ft),  Average Daily Traffic: 600 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 650 (year 2040),  Design Load: HS 20,  Features Intersected: MIDDLE FORK BEAVER CREEK,  Facility Carried by Structure: 140 ROAD
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 78.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 91011,  Location: 15.0W OF GOODLAND (Lat: 39.337878,  Lng: -101.986122),  Route carried "on" structure: County highway 877,  Year Built: 1965,  Status: Posted for load,  Structure Length: 2.89m (9.48ft),  Average Daily Traffic: 245 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 300 (year 2040),  Design Load: H 15,  Features Intersected: MIDDLE FORK BEAVER CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.4m (37.4ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 24.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Other Special Inspection Date: January 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 999907000910011,  Location: COLORADO STATE LINE (Lat: 39.329444,  Lng: -102.048611),  Route carried "on" structure: County highway 6,  Year Built: 1969,  Status: Open,  Structure Length: 8.31m (27.26ft),  Truck Traffic: 1%,  Design Load: H 15,  Features Intersected: I-70 HIGHWAY,  Facility Carried by Structure: LOCAL ROAD
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.867,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.1m (79.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 27.25m (89.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 999907000910021,  Location: 1.35 MI E OF CO STLINE (Lat: 39.329444,  Lng: -102.023333),  Route carried "on" structure: Interstate 70,  Year Built: 1969,  Status: Open,  Structure Length: 3.73m (12.24ft),  Average Daily Traffic: 5,738 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 8,198 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: K-267
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 2.181,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.25m (40.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 999907000910031,  Location: 1.36 MI E OF CO STLINE (Lat: 39.329167,  Lng: -102.023333),  Route carried "on" structure: Interstate 70,  Year Built: 1968,  Status: Open,  Structure Length: 3.73m (12.24ft),  Average Daily Traffic: 5,738 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 8,198 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: K-267
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 2.179,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.25m (40.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 999907000910041,  Location: 1.67 MI E OF CO STLINE (Lat: 39.329167,  Lng: -102.017222),  Route carried "on" structure: Interstate 70,  Year Built: 1969,  Status: Open,  Structure Length: 7.33m (24.05ft),  Average Daily Traffic: 5,738 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 8,198 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: MIDDLE FORK BEAVER CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 2.694,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 66.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 24.05m (78.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 999907000910051,  Location: 1.68 MI E OF CO STLINE (Lat: 39.328889,  Lng: -102.017222),  Route carried "on" structure: Interstate 70,  Year Built: 1969,  Status: Open,  Structure Length: 7.33m (24.05ft),  Average Daily Traffic: 5,738 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 8,198 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: MIDDLE FORK BEAVER CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 2.694,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 66.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 24.05m (78.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 999907000910061,  Location: 3.36 MI E OF CO STLINE (Lat: 39.328889,  Lng: -101.986111),  Route carried "on" structure: Interstate 70,  Year Built: 1968,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 5,738 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 8,198 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: LOCAL ROAD
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 5.396,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 48.0m (157.5ft)

Condition: Culverts: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 999907000910011,  Location: COLORADO STATE LINE (Lat: 39.329444,  Lng: -102.048611),  Route carried "under" structure: Interstate 70,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 6,875 (year 2020),  Truck Traffic: 17%,  Features Intersected: I-70 HIGHWAY,  Facility Carried by Structure: LOCAL ROAD
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 24.1m (79.1ft)

Discuss Kanorado, Kansas (KS) on our hugely popular Kansas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.