Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Kimball, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 52ft / 16.0mTotal length
  • $3,685,000Total costs
  • 5,120Total average daily traffic
  • 454Total average daily truck traffic
  • 5,313Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Kimball
  • No street view available for this location

New bridges in Kimball, WV - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 31970-1979
  • 21980-1989
  • 21990-1999
  • 32000-2009
Reconstructed bridges in Kimball, WV - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11990-1999
  • 12000-2009
Average Bridge Daily Traffic in Kimball, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.1%Good
  • 27.3%Satisfactory
  • 36.4%Fair
  • 27.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 27.3%Satisfactory
  • 54.5%Fair
  • 18.2%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 9.1%Good
  • 36.4%Satisfactory
  • 54.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.1%Very good
  • 27.3%Good
  • 27.3%Satisfactory
  • 27.3%Fair
  • 9.1%Poor
Find on map >>   Show street view

Structure Number: 24A131,  Location: 0.01 MI. W.OF CR 52/6 (Lat: 37.429739,  Lng: -81.508239),  Route carried "on" structure: US 5200,  Year Built: 1932,  Status: Open,  Structure Length: 0.80m (2.62ft),  Average Daily Traffic: 3,500 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,675 (year 2039),  Features Intersected: LAUREL BRANCH,  Facility Carried by Structure: US 52
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.514,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.5m (24.6ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $450,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $500,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 24A143,  Location: 0.83 MI N OF CO 52/35 (Lat: 37.451389,  Lng: -81.512331),  Route carried "on" structure: County highway 5206,  Year Built: 1988,  Status: Open,  Structure Length: 1.15m (3.77ft),  Average Daily Traffic: 350 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 350 (year 2038),  Design Load: HS 20,  Features Intersected: LAUREL BRANCH,  Facility Carried by Structure: CR 52/6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.009,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $450,000 ( Estimate for 2019),  Deck Structure Type: Other,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 24A145,  Location: 0.65 MI N OF CO 52/41 (Lat: 37.463069,  Lng: -81.496769),  Route carried "on" structure: County highway 5206,  Year Built: 1978,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 0.83m (2.72ft),  Average Daily Traffic: 100 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 100 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: LAUREL BRANCH,  Facility Carried by Structure: CR 52/6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.472,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 24A185,  Location: 0.01 MI. E. OF CR 102/71 (Lat: 37.428031,  Lng: -81.510169),  Route carried "on" structure: County highway 10271,  Year Built: 1974,  Status: Posted for load,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 50 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 50 (year 2038),  Features Intersected: ELKHORN CREEK,  Facility Carried by Structure: CR 102/71
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.531,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.8m (68.2ft),  Curb-To-Curb Width: 5.0m (16.4ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Critical Feature Inspection Date: January 2021,  Other Special Inspection Date: January 2021,  Bridge Improvement Cost: $650,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $700,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 24A205,  Location: 0.28 MI N OF CO 52/41 (Lat: 37.458181,  Lng: -81.500850),  Route carried "on" structure: County highway 5206,  Year Built: 1978,  Status: Open,  Structure Length: 0.83m (2.72ft),  Average Daily Traffic: 200 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 200 (year 2038),  Design Load: HS 20,  Features Intersected: LAUREL BRANCH,  Facility Carried by Structure: CR 52/6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.667,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $225,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $260,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 24A221,  Location: 0.05 MI.S. OF CR. 52/6 (Lat: 37.439089,  Lng: -81.510050),  Route carried "on" structure: County highway 5204,  Year Built: 1981,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 1.24m (4.07ft),  Average Daily Traffic: 100 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 100 (year 2038),  Design Load: H 20,  Features Intersected: LAUREL BRANCH,  Facility Carried by Structure: COUNTY ROUTE 52/4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.207,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.1m (36.4ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 24A226,  Location: 0.01 MI. E. OF US. 52 (Lat: 37.429089,  Lng: -81.505719),  Route carried "on" structure: County highway 10271,  Year Built: 1993,  Status: Open,  Structure Length: 1.66m (5.45ft),  Average Daily Traffic: 50 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 50 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: ELKHORN CREEK,  Facility Carried by Structure: COUNTY RTE. 102/71
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 68.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.66m (5.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $600,000 ( Estimate for 2020),  Deck Structure Type: Other,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 24A264,  Location: 0.01 MI. SOUTH OF US 52 (Lat: 37.413869,  Lng: -81.522219),  Route carried "on" structure: County highway 5237,  Year Built: 1994,  Status: Open,  Structure Length: 3.97m (13.02ft),  Average Daily Traffic: 30 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 30 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: ELKHORN CREEK,  Facility Carried by Structure: COUNTY ROUTE 52/37
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.6m (41.3ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 24A279,  Location: 0.70 MI NORTH OF CO 52/4 (Lat: 37.445719,  Lng: -81.513161),  Route carried "on" structure: County highway 5206,  Year Built: 2000,  Status: Open,  Structure Length: 1.18m (3.87ft),  Average Daily Traffic: 350 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 350 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: LAUREL BRANCH,  Facility Carried by Structure: COUNTY ROUTE 52/6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.317,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.19m (3.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $450,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 24A32,  Location: 0.59 MI NORTH OF CO 52/35 (Lat: 37.448469,  Lng: -81.513800),  Route carried "on" structure: County highway 5206,  Year Built: 2009,  Status: Open,  Structure Length: 0.86m (2.82ft),  Average Daily Traffic: 350 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 368 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: LAUREL BRANCH,  Facility Carried by Structure: CO 52/6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.623,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $350,000 ( Estimate for 2019),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 24A346,  Location: 0.01 Mile E. of CR. 52/4 (Lat: 37.433681,  Lng: -81.512050),  Route carried "on" structure: Other road 90159,  Year Built: 2002,  Status: Open,  Structure Length: 1.26m (4.13ft),  Average Daily Traffic: 40 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 40 (year 2038),  Features Intersected: Laurel Branch,  Facility Carried by Structure: HARP 901/59
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $325,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $375,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber
Discuss Kimball, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.