Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Lake Murray of Richland, South Carolina (SC)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 384ft / 117mTotal length
  • $4,908,000Total costs
  • 179,650Total average daily traffic
  • 22,994Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Lake Murray of Richland
  • No street view available for this location

New bridges in Lake Murray of Richland, SC - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11940-1949
  • 61950-1959
  • 11960-1969
  • 31970-1979
  • 12000-2009
Average Bridge Daily Traffic in Lake Murray of Richland, SC
Average Bridge Truck Traffic in Lake Murray of Richland, SC
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 40.0%Good
  • 20.0%Satisfactory
  • 40.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 50.0%Good
  • 10.0%Satisfactory
  • 20.0%Fair
  • 20.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.0%Good
  • 30.0%Satisfactory
  • 40.0%Fair
  • 10.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 62.5%Very good
  • 12.5%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 969,  Location: 4 MI NW OF IRMO (Lat: 34.125531,  Lng: -81.231344),  Route carried "on" structure: US 76,  Year Built: 1939,  Status: Posted for load,  Structure Length: 12.07m (39.60ft),  Average Daily Traffic: 21,200 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 28,620 (year 2041),  Design Load: H 15,  Features Intersected: RR CSXT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.164,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 21.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 12.07m (39.60ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Critical Feature Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1646,  Location: 6 MI E OF CHAPIN (Lat: 34.158656,  Lng: -81.253628),  Route carried "on" structure: US 176,  Year Built: 1949,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 10,700 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 14,445 (year 2041),  Design Load: H 15,  Features Intersected: BOYD BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.113,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 22.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021
Find on map >>   Show street view

Structure Number: 2245,  Location: 2 MI NW OF WHITE ROCK (Lat: 34.156136,  Lng: -81.299097),  Route carried "on" structure: State highway 405,  Year Built: 1955,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 1,900 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,686 (year 2040),  Design Load: H 10,  Features Intersected: WATEREE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.501,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 20.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 15.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2298,  Location: 10MI SW OF BEAUFORT (Lat: 32.374275,  Lng: -80.834586),  Route carried "on" structure: State highway 170,  Year Built: 2004,  Status: Open,  Structure Length: 56.51m (185.40ft),  Average Daily Traffic: 24,900 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 61,503 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CHECHESSEE RIVER
Minimum Vertical Clearance: 3.63m (11.91ft),  Kilometerpoint: 25.989,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 20 degrees,  Navigation Control: Yes ( Vertical Clearance: 6.1m (20.0ft), Horizontal Clearance: 20.1m (65.9ft)),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 44.8m (147.0ft),  Curb-To-Curb Width: 23.8m (78.1ft),  Out-to-Out Width: 24.7m (81.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 56.51m (185.40ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2020,  Underwater Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2523,  Location: 13.5MI NW WINNSBORO (Lat: 34.551411,  Lng: -81.192439),  Route carried "on" structure: State highway 214,  Year Built: 1957,  Status: Posted for load,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 125 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: H 15,  Features Intersected: BIG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.713,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 7.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.57m (11.71ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $284,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $426,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2829,  Location: 1 MI N OF WHITE ROCK (Lat: 34.159642,  Lng: -81.273097),  Route carried "on" structure: State highway 234,  Year Built: 1958,  Status: Open,  Structure Length: 6.55m (21.49ft),  Average Daily Traffic: 5,200 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 10,088 (year 2040),  Design Load: HS 15,  Features Intersected: I-26
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.725,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 25.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.55m (24.77ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $955,000,  Roadway Improvement Cost: $239,000,  Total Project Cost: $1,433,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3085,  Location: 2 MI NW OF WHITE ROCK (Lat: 34.166561,  Lng: -81.291672),  Route carried "on" structure: State highway 405,  Year Built: 1959,  Status: Open,  Structure Length: 6.64m (21.78ft),  Average Daily Traffic: 1,900 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,686 (year 2040),  Design Load: HS 15,  Features Intersected: I-26
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 1.004,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 23.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 7.64m (25.07ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $771,000,  Roadway Improvement Cost: $193,000,  Total Project Cost: $1,157,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3963,  Location: 2.0 MI SE CENTRAL (Lat: 34.704897,  Lng: -82.756983),  Route carried "on" structure: State highway 18,  Year Built: 1962,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 8,400 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 17,304 (year 2040),  Design Load: HS 15,  Features Intersected: EIGHTEEN MILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.735,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Poor,  Channel: Fair,  Operating Rating: 30.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.49m (18.01ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $694,000,  Roadway Improvement Cost: $174,000,  Total Project Cost: $1,041,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6147,  Location: 4 MI SE OF BISHOPVILLE (Lat: 34.187794,  Lng: -80.193319),  Route carried "on" structure: Interstate 20,  Year Built: 1972,  Status: Open,  Structure Length: 18.29m (60.01ft),  Average Daily Traffic: 12,300 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 19,680 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: LYNCHES RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 194.552,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 20,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.29m (60.01ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Underwater Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7163,  Location: 6 MI NE OF CHAPIN (Lat: 34.196408,  Lng: -81.259264),  Route carried "on" structure: State highway 698,  Year Built: 1978,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 275 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 352 (year 2040),  Design Load: H 15,  Features Intersected: WATEREE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.353,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Very good,  Operating Rating: 13.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 6.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: High priority of replacement,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 6.44m (21.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $567,000,  Roadway Improvement Cost: $142,000,  Total Project Cost: $851,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7293,  Location: 4 MI NW OF BALLENTINE (Lat: 34.184311,  Lng: -81.270447),  Route carried "on" structure: State highway 2480,  Year Built: 1979,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 750 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 960 (year 2040),  Design Load: H 10,  Features Intersected: BR OF WATEREE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.979,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Very good,  Operating Rating: 21.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2829,  Location: 1 MI N OF WHITE ROCK (Lat: 34.159642,  Lng: -81.273097),  Route carried "under" structure: Interstate 26,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 46,000 (year 2020),  Truck Traffic: 19%,  Features Intersected: I-26,  Facility Carried by Structure: S-40-234
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 151.793,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 3085,  Location: 2 MI NW OF WHITE ROCK (Lat: 34.166561,  Lng: -81.291672),  Route carried "under" structure: Interstate 26,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 46,000 (year 2020),  Truck Traffic: 19%,  Features Intersected: I-26,  Facility Carried by Structure: S-40-405
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 149.926,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 17.1m (56.1ft)

Discuss Lake Murray of Richland, South Carolina (SC) on our hugely popular South Carolina forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.