Bridge Statistics for Lake Waccamaw, North Carolina (NC)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 213ft / 65.2mTotal length
  • 38,470Total average daily traffic
  • 4,635Total average daily truck traffic
  • 76,940Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Lake Waccamaw
  • No street view available for this location

New bridges in Lake Waccamaw, NC - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 41980-1989
  • 12000-2009
  • 72010-2019
Average Bridge Daily Traffic in Lake Waccamaw, NC
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 41.7%Very good
  • 41.7%Good
  • 16.7%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 41.7%Very good
  • 41.7%Good
  • 8.3%Satisfactory
  • 8.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Very good
  • 41.7%Good
  • 8.3%Satisfactory
  • 25.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 15.4%Very good
  • 69.2%Good
  • 7.7%Satisfactory
  • 7.7%Fair
Find on map >>   Show street view

Structure Number: 470068,  Location: 0.7 MI. E. JCT. SR1757 (Lat: 34.321992,  Lng: -78.469261),  Route carried "on" structure: State highway 214,  Year Built: 2019,  Status: Open,  Structure Length: 21.33m (69.98ft),  Average Daily Traffic: 1,400 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,800 (year 2040),  Design Load: HL 93,  Features Intersected: BIG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.0m (32.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 17.6m (57.7ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 470082,  Location: 1.6 MI.E.JCT.SR1757 (Lat: 34.321944,  Lng: -78.454947),  Route carried "on" structure: State highway 214,  Year Built: 1922,  Year Reconstructed: 1941,  Status: Open,  Structure Length: 3.71m (12.17ft),  Average Daily Traffic: 1,300 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,600 (year 2040),  Design Load: H 15,  Features Intersected: GREEN SWAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 71.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 470243,  Location: 0.5 MI.W. OF JCT.SR1731 (Lat: 34.350158,  Lng: -78.489425),  Route carried "on" structure: State highway 1740,  Year Built: 2016,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 1,900 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,800 (year 2040),  Design Load: HL 93,  Features Intersected: BIG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 2,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Underwater Inspection Date: August 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 470245,  Location: 0.3MI.W.JCT.SR1731 (Lat: 34.351683,  Lng: -78.487258),  Route carried "on" structure: State highway 1740,  Year Built: 2016,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 1,900 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,800 (year 2040),  Design Load: HL 93,  Features Intersected: SLAP SWAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 470248,  Location: 0.3 MI.W.JCT.SR1737 (Lat: 34.368636,  Lng: -78.459669),  Route carried "on" structure: State highway 1740,  Year Built: 2002,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 1,400 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,800 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: FRIAR SWAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 470342,  Location: 0.6 MI.W. OF JCT. SR1757 (Lat: 34.316900,  Lng: -78.535286),  Route carried "on" structure: State highway 1900,  Year Built: 2016,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 820 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,640 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CAN. OFF LK.WACCAMAW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2020,  Underwater Inspection Date: June 2020
Find on map >>   Show street view

Structure Number: 470363,  Location: 1.3 MI.E. JCT.SR1757 (Lat: 34.295894,  Lng: -78.476092),  Route carried "on" structure: State highway 1947,  Year Built: 2010,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 450 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 900 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: BIG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.6m (34.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 83.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Underwater Inspection Date: March 2019,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 470364,  Location: 1.6MI.E. OF JCT.SR1757 (Lat: 34.292319,  Lng: -78.472042),  Route carried "on" structure: State highway 1947,  Year Built: 2010,  Status: Open,  Structure Length: 3.65m (11.98ft),  Average Daily Traffic: 450 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 900 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: BR. OF WACCAMAW RIV.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.3m (33.8ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 83.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Underwater Inspection Date: March 2019,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 470383,  Location: 1.8 MI.E. OF JCT.SR1740 (Lat: 34.322372,  Lng: -78.469317),  Route carried "on" structure: US 74,  Year Built: 1988,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 7,750 (year 2019),  Truck Traffic: 14%,  Average Future Daily Traffic: 15,500 (year 2040),  Design Load: HS 20,  Features Intersected: FRIAR SWAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 77.907,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 74),  Owner: State Highway Agency,  Approaching Roadway Width: 10.6m (34.8ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 86.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: May 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 470384,  Location: 1.8 MI.E. OF JCT.SR1740 (Lat: 34.322569,  Lng: -78.469325),  Route carried "on" structure: US 74,  Year Built: 1988,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 7,750 (year 2018),  Truck Traffic: 14%,  Average Future Daily Traffic: 15,500 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: FRIAR SWAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 77.907,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 74),  Owner: State Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 82.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: December 2018,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 470385,  Location: 1.9 MI.E. OF JCT.SR1740 (Lat: 34.322561,  Lng: -78.467564),  Route carried "on" structure: US 74,  Year Built: 1988,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 6,750 (year 2018),  Truck Traffic: 14%,  Average Future Daily Traffic: 13,500 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: FRIAR SWAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 77.938,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 74),  Owner: State Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 82.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: December 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 470386,  Location: 1.9 MI.E. OF JCT.SR1740 (Lat: 34.322367,  Lng: -78.467561),  Route carried "on" structure: US 74,  Year Built: 1988,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 6,500 (year 2013),  Truck Traffic: 14%,  Average Future Daily Traffic: 13,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: FRIAR SWAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 77.938,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 74),  Owner: State Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 82.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 470413,  Location: 1MI. W. JCT. SR1967 (Lat: 34.291222,  Lng: -78.472581),  Route carried "on" structure: City street ,  Year Built: 2019,  Status: Closed,  Structure Length: 1.67m (5.48ft),  Average Daily Traffic: 100 (year 2015),  Truck Traffic: 6%,  Average Future Daily Traffic: 200 (year 2040),  Features Intersected: BOAT ACCESS,  Facility Carried by Structure: NC PARK DR(CLOSED)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.0m (19.7ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.2m (13.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 4.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 0.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2022,  Deck Structure Type: Wood or Timber
Discuss Lake Waccamaw, North Carolina (NC) on our hugely popular North Carolina forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.