Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Lakeland, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 203ft / 62.3mTotal length
  • $11,979,000Total costs
  • 29,300Total average daily traffic
  • 2,598Total average daily truck traffic
  • 43,950Total future (year 2032) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Lakeland
  • No street view available for this location

New bridges in Lakeland, GA - historical statistics
  • New bridges - historical statistics
  • 41930-1939
  • 21940-1949
  • 21950-1959
  • 41990-1999
Average Bridge Daily Traffic in Lakeland, GA
Average Bridge Truck Traffic in Lakeland, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 40.0%Very good
  • 60.0%Good
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.0%Very good
  • 80.0%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 80.0%Good
  • 20.0%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 41.7%Very good
  • 8.3%Good
  • 50.0%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 42.9%Good
  • 57.1%Satisfactory
Find on map >>   Show street view

Structure Number: 1730005,  Location: 2.5 MI W OF LAKELAND (Lat: 31.046628,  Lng: -83.112428),  Route carried "on" structure: US 129,  Year Built: 1932,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,980 (year 2012),  Truck Traffic: 14%,  Average Future Daily Traffic: 2,970 (year 2032),  Design Load: H 15,  Features Intersected: ALLIGATOR RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.968,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 1730007,  Location: APP 4 MI S OF LAKELAND (Lat: 30.984828,  Lng: -83.097119),  Route carried "on" structure: US 221,  Year Built: 1935,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 3,090 (year 2012),  Truck Traffic: 11%,  Average Future Daily Traffic: 4,635 (year 2032),  Design Load: H 15,  Features Intersected: COPELAND BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 1730008,  Location: 3.5 MI NE OF LAKELAND (Lat: 31.056169,  Lng: -83.030369),  Route carried "on" structure: US 221,  Year Built: 1934,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 2,410 (year 2012),  Truck Traffic: 20%,  Average Future Daily Traffic: 3,615 (year 2032),  Design Load: H 15,  Features Intersected: ALAPAHA RIVER TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.22m (23.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 1730009,  Location: APP 3 MI N OF LAKELAND (Lat: 31.081858,  Lng: -83.022419),  Route carried "on" structure: US 221,  Year Built: 1934,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 1,530 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,295 (year 2032),  Design Load: H 15,  Features Intersected: BEN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 29.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 1730017,  Location: APP 4 MI W OF LAKELAND (Lat: 31.038419,  Lng: -83.134678),  Route carried "on" structure: State highway 122,  Year Built: 1945,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,900 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,850 (year 2032),  Design Load: H 15,  Features Intersected: BANKS LAKE TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2021,  Underwater Inspection Date: March 2021,  Bridge Improvement Cost: $90,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $135,000
Find on map >>   Show street view

Structure Number: 1730018,  Location: 2.6 MI W OF LAKELAND (Lat: 31.031489,  Lng: -83.115558),  Route carried "on" structure: State highway 122,  Year Built: 1945,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,900 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,850 (year 2032),  Design Load: H 15,  Features Intersected: BANKS LAKE TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2021,  Underwater Inspection Date: March 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 1730021,  Location: IN LAKELAND (Lat: 31.042439,  Lng: -83.079028),  Route carried "on" structure: County highway 1314,  Year Built: 1954,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 820 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,230 (year 2032),  Design Load: H 15,  Features Intersected: BANKS LAKE TRIB,  Facility Carried by Structure: NORTH PECAN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 42.52m (139.50ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: March 2021,  Bridge Improvement Cost: $293,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $440,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1730022,  Location: 2.4 MI E OF LAKELAND (Lat: 31.046319,  Lng: -83.042439),  Route carried "on" structure: US 129,  Year Built: 1990,  Status: Open,  Structure Length: 26.21m (85.99ft),  Average Daily Traffic: 4,390 (year 2012),  Truck Traffic: 14%,  Average Future Daily Traffic: 6,585 (year 2032),  Design Load: HS 20,  Features Intersected: ALAPAHA RIVER,  Facility Carried by Structure: SR 31 - SR37 - SR1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 16,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $3,360,000,  Roadway Improvement Cost: $336,000,  Total Project Cost: $5,040,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1730023,  Location: 1.8 MI E OF LAKELAND (Lat: 31.044919,  Lng: -83.051128),  Route carried "on" structure: US 129,  Year Built: 1990,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 4,390 (year 2012),  Truck Traffic: 14%,  Average Future Daily Traffic: 6,585 (year 2032),  Design Load: HS 20,  Features Intersected: ALAPAHA RIVER OVERFLOW,  Facility Carried by Structure: SR 31 - SR37 -SR12
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.140,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $781,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $1,172,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1730024,  Location: IN EAST LAKELAND (Lat: 31.043108,  Lng: -83.062378),  Route carried "on" structure: US 129,  Year Built: 1990,  Status: Open,  Structure Length: 12.19m (39.99ft),  Average Daily Traffic: 5,290 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,935 (year 2032),  Design Load: HS 20,  Features Intersected: BIG CREEK,  Facility Carried by Structure: SR 31 -SR 37 -SR 1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.140,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,563,000,  Roadway Improvement Cost: $156,000,  Total Project Cost: $2,344,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1730027,  Location: IN NE LAKELAND (Lat: 31.048389,  Lng: -83.069819),  Route carried "on" structure: State highway 135,  Year Built: 1993,  Status: Open,  Structure Length: 9.75m (31.99ft),  Average Daily Traffic: 1,110 (year 2012),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,665 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BIG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,250,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,875,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1735009,  Location: 2.3 MI E OF LAKELAND (Lat: 31.054078,  Lng: -83.038408),  Route carried "on" structure: County highway 96,  Year Built: 1950,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: ALAPAHA RIVER TRIB,  Facility Carried by Structure: RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Discuss Lakeland, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.