Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Lauderdale, Mississippi (MS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 23Number of bridges
  • 276ft / 83.7mTotal length
  • $950,020,000Total costs
  • 35,360Total average daily traffic
  • 7,042Total average daily truck traffic
  • 46,345Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Lauderdale
  • No street view available for this location

New bridges in Lauderdale, MS - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 21960-1969
  • 91970-1979
  • 11980-1989
  • 51990-1999
  • 32000-2009
  • 22010-2019
Average Bridge Daily Traffic in Lauderdale, MS
Average Bridge Truck Traffic in Lauderdale, MS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.9%Excellent
  • 35.3%Very good
  • 47.1%Good
  • 11.8%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 70.6%Very good
  • 11.8%Good
  • 17.6%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 41.2%Very good
  • 35.3%Good
  • 17.6%Satisfactory
  • 5.9%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 22.2%Very good
  • 33.3%Good
  • 33.3%Satisfactory
  • 11.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 83.3%Good
  • 16.7%Satisfactory
Find on map >>   Show street view

Structure Number: 21000450380842A,  Location: 8.5 MI N I 59 (Lat: 32.490353,  Lng: -88.585283),  Route carried "on" structure: US 45,  Year Built: 1976,  Status: Open,  Structure Length: 7.86m (25.79ft),  Average Daily Traffic: 4,650 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 6,000 (year 2040),  Design Load: HS 20,  Features Intersected: KCS RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.945,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 4,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 61.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21000450380842B,  Location: 8.5 MI N I 59 (Lat: 32.489378,  Lng: -88.586075),  Route carried "on" structure: US 45,  Year Built: 1967,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 4,650 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 6,000 (year 2040),  Design Load: HS 20,  Features Intersected: KCS RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.155,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 4,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.71m (22.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $188,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $388,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21000450380865A,  Location: 6.4 MI S KEMPER CL (Lat: 32.509025,  Lng: -88.552728),  Route carried "on" structure: US 45,  Year Built: 1976,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 4,650 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 6,000 (year 2040),  Design Load: HS 20,  Features Intersected: KCS RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.250,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 4,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21000450380865B,  Location: 6.4 MI S KEMPER CL (Lat: 32.508456,  Lng: -88.552683),  Route carried "on" structure: US 45,  Year Built: 1967,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 4,650 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 6,000 (year 2040),  Design Load: HS 20,  Features Intersected: KCS RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.940,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 4,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 51.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.94m (16.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $263,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $555,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21000450380897A,  Location: 3.3 MI S KEMPER CL (Lat: 32.530089,  Lng: -88.512197),  Route carried "on" structure: US 45,  Year Built: 1977,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 2,750 (year 2020),  Truck Traffic: 27%,  Average Future Daily Traffic: 3,450 (year 2040),  Design Load: HS 20,  Features Intersected: PONTA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.415,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 4,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 57.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21000450380897B,  Location: 3.3 MI S KEMPER CL (Lat: 32.529525,  Lng: -88.512133),  Route carried "on" structure: US 45,  Year Built: 1977,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 2,750 (year 2020),  Truck Traffic: 27%,  Average Future Daily Traffic: 3,450 (year 2040),  Design Load: HS 20,  Features Intersected: PONTA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.768,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 4,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 58.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21000450380911A,  Location: 1.9 MI S KEMPER CL (Lat: 32.550508,  Lng: -88.506028),  Route carried "on" structure: US 45,  Year Built: 1992,  Status: Open,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 2,700 (year 2020),  Truck Traffic: 29%,  Average Future Daily Traffic: 3,350 (year 2040),  Design Load: HS 20,  Features Intersected: BIG REED CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.063,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 4,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 58.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21000450380911B,  Location: 1.9 MI S KEMPER CL (Lat: 32.549956,  Lng: -88.505808),  Route carried "on" structure: US 45,  Year Built: 1986,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 2,700 (year 2020),  Truck Traffic: 29%,  Average Future Daily Traffic: 3,350 (year 2040),  Design Load: HS 20,  Features Intersected: BIG REED CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.126,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 4,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 61.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: SA3800000000015,  Location: SEC 25 T 8N R17E B (Lat: 32.501500,  Lng: -88.516278),  Route carried "on" structure: County highway 474,  Year Built: 1999,  Status: Open,  Structure Length: 2.82m (9.25ft),  Average Daily Traffic: 2,350 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,525 (year 2040),  Design Load: HS 20,  Features Intersected: LITTLE REED CRK,  Facility Carried by Structure: LAUD - TOOMSUBA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.530,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $480,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $630,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA3800000000284,  Location: SEC 11 T 8N R17E (Lat: 32.557031,  Lng: -88.529144),  Route carried "on" structure: County highway 1044,  Year Built: 1977,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 70 (year 2017),  Truck Traffic: 12%,  Average Future Daily Traffic: 105 (year 2040),  Design Load: H 15,  Features Intersected: BIG REED CREEK,  Facility Carried by Structure: CLARKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.896,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $260,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $410,000 ( Estimate for 2017),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA3800000000288,  Location: SEC 22 T 8N R17E (Lat: 32.524208,  Lng: -88.549917),  Route carried "on" structure: County highway 1045,  Year Built: 1990,  Status: Open,  Structure Length: 5.21m (17.09ft),  Average Daily Traffic: 90 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 135 (year 2040),  Design Load: HS 15,  Features Intersected: PONTA CREEK,  Facility Carried by Structure: BEAVER POND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.49m (18.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $380,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $530,000 ( Estimate for 2017),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA3800000000289,  Location: SEC 24 T 8N R17E B (Lat: 32.519972,  Lng: -88.506361),  Route carried "on" structure: County highway 1521,  Year Built: 1971,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 710 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,065 (year 2041),  Design Load: H 15,  Features Intersected: CREEK,  Facility Carried by Structure: YORK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.624,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.4m (24.3ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 22.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 3.45m (11.32ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $320,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $470,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA380000000029,  Location: SEC 24 T 8N R17E (Lat: 32.525667,  Lng: -88.512306),  Route carried "on" structure: County highway 2001,  Year Built: 1938,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 290 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 435 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: OLD HWY 45
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.321,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 31.8m (104.3ft),  Out-to-Out Width: 32.3m (106.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $145,000,  Total Project Cost: $445,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: SA3800000000291,  Location: SEC 24 T 8N R17E (Lat: 32.529669,  Lng: -88.511692),  Route carried "on" structure: County highway 2001,  Year Built: 2002,  Status: Open,  Structure Length: 6.70m (21.98ft),  Average Daily Traffic: 270 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 405 (year 2040),  Design Load: HS 20,  Features Intersected: PONTA CREEK,  Facility Carried by Structure: OLD HWY 45
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 67.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.24m (23.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $650,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA3800000000294,  Location: SEC 32 T 8N R17E B (Lat: 32.493697,  Lng: -88.583419),  Route carried "on" structure: County highway 1055,  Year Built: 1992,  Status: Posted for load,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 80 (year 2021),  Average Future Daily Traffic: 120 (year 2041),  Design Load: H 15,  Features Intersected: ICG RR,  Facility Carried by Structure: CAMPGROUND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.276,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.4m (24.3ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 25.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 13.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 4.21m (13.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $440,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $590,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA3800000000297,  Location: SEC 5 T 8N R18E B (Lat: 32.563750,  Lng: -88.481831),  Route carried "on" structure: County highway 1405,  Year Built: 1977,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 430 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 645 (year 2041),  Design Load: HS 15,  Features Intersected: MCELROY CREEK,  Facility Carried by Structure: OLD HWY 45 N
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.701,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 27.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $650,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $800,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA3800000000298,  Location: SEC 5 T 8N R18E B (Lat: 32.570222,  Lng: -88.477525),  Route carried "on" structure: County highway 1405,  Year Built: 1979,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 250 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 375 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: SETH COBB RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.988,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 56.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $330,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: SA38000000003,  Location: SEC 5 T 8N R18E (Lat: 32.561206,  Lng: -88.477669),  Route carried "on" structure: County highway 1037,  Year Built: 2009,  Status: Open,  Structure Length: 1.17m (3.84ft),  Average Daily Traffic: 60 (year 2017),  Average Future Daily Traffic: 90 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: HENRY WEDGEWORTHRD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.612,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $330,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: SA3800000000301,  Location: SEC 7 T 8N R18E B (Lat: 32.549531,  Lng: -88.497056),  Route carried "on" structure: County highway 1405,  Year Built: 1977,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 670 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,005 (year 2040),  Design Load: HS 15,  Features Intersected: BIG REED CREEK,  Facility Carried by Structure: OLD HWY 45-LAUD CO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $340,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $490,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA3800000000302,  Location: SEC 9 T 8N R18E B (Lat: 32.545056,  Lng: -88.458778),  Route carried "on" structure: County highway 1531,  Year Built: 1992,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 260 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 390 (year 2040),  Design Load: H 15,  Features Intersected: CREEK,  Facility Carried by Structure: YORK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.793,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.09m (10.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $220,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $370,000 ( Estimate for 2017),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA3800000000317,  Location: SEC 22 T 8N R17E (Lat: 32.519647,  Lng: -88.549900),  Route carried "on" structure: County highway 1045,  Year Built: 2003,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 90 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 135 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: BEAVER POND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 991.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $275,000 ( Estimate for 2017)
Find on map >>   Show street view

Structure Number: SA380000000A014,  Location: SEC 22 T 8N R17E (Lat: 32.528194,  Lng: -88.549886),  Route carried "on" structure: County highway 45,  Year Built: 2017,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 90 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 135 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CREEK,  Facility Carried by Structure: BEAVER POND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.931,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.2m (23.6ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 3.1m (10.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 56.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $300,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: SA380000000A292,  Location: SEC 28 T 8N R17E (Lat: 32.503964,  Lng: -88.559061),  Route carried "on" structure: County highway 1049,  Year Built: 2016,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 150 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 180 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: PUMPING STATION RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2574.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 69.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.53m (5.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $400,000 ( Estimate for 2021)
Discuss Lauderdale, Mississippi (MS) on our hugely popular Mississippi forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.