Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Lawson Heights, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 112ft / 34.2mTotal length
  • $2,494,000Total costs
  • 126,704Total average daily traffic
  • 10,531Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Lawson Heights
  • No street view available for this location

New bridges in Lawson Heights, PA - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11920-1929
  • 41930-1939
  • 11940-1949
  • 31950-1959
  • 11960-1969
  • 11970-1979
  • 11980-1989
  • 11990-1999
  • 22000-2009
  • 32010-2019
Reconstructed bridges in Lawson Heights, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 01980-1989
  • 31990-1999
  • 12000-2009
  • 32010-2019
Average Bridge Daily Traffic in Lawson Heights, PA
Average Bridge Truck Traffic in Lawson Heights, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Very good
  • 16.7%Good
  • 41.7%Satisfactory
  • 8.3%Critical
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 50.0%Very good
  • 14.3%Satisfactory
  • 28.6%Fair
  • 7.1%Critical
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.3%Very good
  • 21.4%Good
  • 35.7%Satisfactory
  • 21.4%Fair
  • 7.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.3%Very good
  • 12.5%Good
  • 62.5%Satisfactory
  • 12.5%Fair
  • 6.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 33.3%Satisfactory
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 495,  Location: 450'S.OF SR 1013 (Lat: 40.510067,  Lng: -79.946106),  Route carried "on" structure: State highway 8,  Year Built: 1925,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 32,865 (year 2022),  Truck Traffic: 10%,  Average Future Daily Traffic: 25,224 (year 2032),  Design Load: HS 20,  Features Intersected: PINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.061,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 24 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 15.3m (50.2ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2019,  Bridge Improvement Cost: $19,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $253,000
Find on map >>   Show street view

Structure Number: 2162,  Location: IW01 IRWIN RUN NO. 1 (Lat: 40.597589,  Lng: -79.997853),  Route carried "on" structure: County highway ,  Year Built: 1936,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 3,569 (year 2005),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,569 (year 2023),  Features Intersected: IRWIN RUN,  Facility Carried by Structure: PEARCE MILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 3.2m (10.5ft),  Curb-To-Curb Width: 14.1m (46.3ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: December 2020
Find on map >>   Show street view

Structure Number: 2163,  Location: PN03 PINE CREEK,N BR,#3 (Lat: 40.608561,  Lng: -80.015967),  Route carried "on" structure: County highway ,  Year Built: 1939,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 2,227 (year 2005),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,227 (year 2024),  Features Intersected: PINE CREEK NORTH BRANCH,  Facility Carried by Structure: WALTER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 2.9m (9.5ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 18.4m (60.4ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: 5855,  Location: VILLAGE OF GREENWOOD (Lat: 40.532408,  Lng: -78.371494),  Route carried "on" structure: State highway ,  Year Built: 1952,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 6,685 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 9,763 (year 2032),  Design Load: HL 93,  Features Intersected: KETTLE CREEK,  Facility Carried by Structure: SR 4016
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 66.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.80m (28.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5885,  Location: 0.1 MILE NORTH OF TYRONE (Lat: 40.692167,  Lng: -78.240586),  Route carried "on" structure: State highway ,  Year Built: 1937,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 235 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 266 (year 2032),  Design Load: HL 93,  Features Intersected: DECKER RUN,  Facility Carried by Structure: T527 DECKER HOLLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.280,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $48,000,  Roadway Improvement Cost: $264,000,  Total Project Cost: $646,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20112,  Location: 0.7 MI W OAKLAND MILLS (Lat: 40.614736,  Lng: -77.329739),  Route carried "on" structure: State highway ,  Year Built: 1940,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 461 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 552 (year 2041),  Features Intersected: LAUREL RUN,  Facility Carried by Structure: SR 1002
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.230,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $25,000,  Roadway Improvement Cost: $237,000,  Total Project Cost: $333,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20115,  Location: 2 MI NW MCALISTERVILLE (Lat: 40.648064,  Lng: -77.293458),  Route carried "on" structure: State highway ,  Year Built: 1958,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 312 (year 2022),  Truck Traffic: 32%,  Average Future Daily Traffic: 307 (year 2041),  Design Load: HS 20,  Features Intersected: LOST CREEK,  Facility Carried by Structure: SR 1003
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.646,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $28,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $377,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 31569,  Location: RUMMEL (Lat: 40.216467,  Lng: -78.805083),  Route carried "on" structure: State highway 60,  Year Built: 1991,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,538 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,677 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: TRIB SEESE RUN,  Facility Carried by Structure: SR 1033
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.718,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 33852,  Location: CHERRY TREE TOWNSHIP (Lat: 41.583889,  Lng: -79.743400),  Route carried "on" structure: State highway ,  Year Built: 1982,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 58 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 118 (year 2032),  Design Load: HS 20,  Features Intersected: OVER PRATHER CREEK,  Facility Carried by Structure: SR 4011,GRESHAM RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.60m (8.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $24,000,  Deck Structure Type: Closed Grating
Find on map >>   Show street view

Structure Number: 3391,  Location: PINE GROVE TOWNSHIP (Lat: 41.336347,  Lng: -79.541033),  Route carried "on" structure: City street 7213,  Year Built: 1905,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 50 (year 2016),  Average Future Daily Traffic: 70 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: EAST SANDY CREEK,  Facility Carried by Structure: HALE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 3.4m (11.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.4m (14.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $29,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $389,000,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 34261,  Location: PINE GROVE TOWNSHIP (Lat: 41.941042,  Lng: -79.068494),  Route carried "on" structure: City street 7215,  Year Built: 1960,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 65 (year 2021),  Average Future Daily Traffic: 91 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: OVER REYNOLDS RUN,  Facility Carried by Structure: T-621,REYNOLDS RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Poor,  Channel: Poor,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 35948,  Location: UNITY TOWNSHIP (Lat: 40.287511,  Lng: -79.371300),  Route carried "on" structure: US 30,  Year Built: 1931,  Year Reconstructed: 1960,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 20,929 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 24,254 (year 2032),  Design Load: HS 20,  Features Intersected: NINE MILE RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.928,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 33 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Inventory Rating: 70.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 36311,  Location: UNITY TOWNSHIP (Lat: 40.304681,  Lng: -79.393847),  Route carried "on" structure: State highway 981,  Year Built: 1953,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 8,368 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 14,512 (year 2032),  Design Load: H 20,  Features Intersected: MONASTERY RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.180,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $30,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $403,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3697,  Location: BTW T600 & SR981 (Lat: 40.304961,  Lng: -79.393178),  Route carried "on" structure: City street T827,  Year Built: 1979,  Status: Posted for load,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 4,000 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,000 (year 2036),  Design Load: HS 20,  Features Intersected: MONASTERY RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Critical,  Superstructure: Critical,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 6.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: Febuary 2020,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $5,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $69,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4095,  Location: 2.3 MI.E.OF COLONIAL PARK (Lat: 40.304006,  Lng: -76.765519),  Route carried "on" structure: State highway ,  Year Built: 2000,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 7,281 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 15,012 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: TRIB TO BEAVER CREEK,  Facility Carried by Structure: SR 2019
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.827,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020
Find on map >>   Show street view

Structure Number: 45647,  Location: N of Youngstown (Lat: 40.291961,  Lng: -79.371486),  Route carried "on" structure: State highway 982,  Year Built: 2009,  Status: Open,  Structure Length: 8.66m (28.41ft),  Average Daily Traffic: 9,263 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,096 (year 2032),  Design Load: HL 93,  Features Intersected: Loyalhanna Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.908,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 43.0m (141.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 52571,  Location: 0.1 mi N from SR 0030 (Lat: 40.287589,  Lng: -79.370081),  Route carried "on" structure: State highway 982,  Year Built: 2015,  Status: Open,  Structure Length: 5.21m (17.09ft),  Average Daily Traffic: 9,264 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 15,740 (year 2036),  Design Load: HL 93,  Features Intersected: SR 0030
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.368,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 21 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 19.3m (63.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 51.2 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 52571,  Location: 0.1 mi N from SR 0030 (Lat: 40.287589,  Lng: -79.370081),  Route carried "under" structure: US 30,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 8,525 (year 2020),  Truck Traffic: 14%,  Features Intersected: SR 0030,  Facility Carried by Structure: SR 0982
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 39.881,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: 52571,  Location: 0.1 mi N from SR 0030 (Lat: 40.287589,  Lng: -79.370081),  Route carried "under" structure: US 30,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 11,009 (year 2020),  Truck Traffic: 11%,  Features Intersected: SR 0030,  Facility Carried by Structure: SR 0982
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 39.928,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 25.3m (83.0ft)

Discuss Lawson Heights, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.