Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Leeds, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 33Number of bridges
  • 443ft / 135mTotal length
  • $51,173,000Total costs
  • 533,521Total average daily traffic
  • 110,136Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Leeds
  • No street view available for this location

New bridges in Leeds, AL - historical statistics
  • New bridges - historical statistics
  • 31920-1929
  • 41930-1939
  • 31950-1959
  • 71960-1969
  • 31970-1979
  • 91980-1989
  • 21990-1999
  • 12000-2009
  • 12020-2022
Reconstructed bridges in Leeds, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 11990-1999
Average Bridge Daily Traffic in Leeds, AL
Average Bridge Truck Traffic in Leeds, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 4.5%Very good
  • 9.1%Good
  • 59.1%Satisfactory
  • 13.6%Fair
  • 4.5%Poor
  • 9.1%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.3%Excellent
  • 4.3%Very good
  • 17.4%Good
  • 47.8%Satisfactory
  • 17.4%Fair
  • 8.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.3%Excellent
  • 13.0%Good
  • 69.6%Satisfactory
  • 8.7%Fair
  • 4.3%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 28.6%Good
  • 23.8%Satisfactory
  • 47.6%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 33.3%Satisfactory
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 164,  Location: 0.9 M N CO RD 520 (Lat: 32.959811,  Lng: -85.677206),  Route carried "on" structure: County highway 531,  Year Built: 1920,  Status: Posted for load,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 105 (year 2008),  Average Future Daily Traffic: 130 (year 2030),  Features Intersected: SOAPSTONE CREEK,  Facility Carried by Structure: BUTTSTON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 4.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 3.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.42m (11.22ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Critical Feature Inspection Date: November 2021,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $398,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $438,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 471,  Location: .9 MI. E. AL 25 (Lat: 33.544383,  Lng: -86.521900),  Route carried "on" structure: US 78,  Year Built: 1928,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 4,260 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,494 (year 2040),  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 187.299,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 71.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $304,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $334,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 884,  Location: DOWNTOWN LEEDS (Lat: 33.546683,  Lng: -86.548817),  Route carried "on" structure: US 78,  Year Built: 1931,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 13,250 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 17,088 (year 2040),  Design Load: H 15,  Features Intersected: LITTLE CAHABA RV
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 184.609,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 4.0m (13.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.88m (12.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $852,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $937,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1204,  Location: .5 MI NW CO 15 CO 11 JCT (Lat: 34.559367,  Lng: -88.117975),  Route carried "on" structure: County highway 11,  Year Built: 1935,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 170 (year 2000),  Truck Traffic: 2%,  Average Future Daily Traffic: 337 (year 2031),  Features Intersected: RAMSEY MILL BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Serious,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $259,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $285,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1638,  Location: COGBIL ST * ASHVILLE RD (Lat: 33.548000,  Lng: -86.546400),  Route carried "on" structure: City street ,  Year Built: 1937,  Status: Closed,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 75 (year 2015),  Average Future Daily Traffic: 105 (year 2035),  Design Load: H 10,  Features Intersected: LIL CAHABA RV,  Facility Carried by Structure: COGBIL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.799,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 3.3m (10.8ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.08m (6.82ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: July 2014,  Critical Feature Inspection Date: January 2015,  Other Special Inspection Date: January 2015,  Bridge Improvement Cost: $171,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $188,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 164,  Location: LANE DR * ASHVILLE RD (Lat: 33.549700,  Lng: -86.543000),  Route carried "on" structure: City street ,  Year Built: 1937,  Status: Posted for load,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 1,060 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,500 (year 2041),  Design Load: H 15,  Features Intersected: LIL CAHABA RV,  Facility Carried by Structure: LANE DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.899,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.8m (25.6ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 26.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 2.08m (6.82ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $541,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $595,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3925,  Location: 0.4 MI MW AL 119 (Lat: 33.499989,  Lng: -86.614447),  Route carried "on" structure: County highway 309,  Year Built: 1950,  Status: Posted for load,  Structure Length: 1.42m (4.66ft),  Average Daily Traffic: 92 (year 2020),  Average Future Daily Traffic: 100 (year 2040),  Features Intersected: LITTLE CAHABA RIVER,  Facility Carried by Structure: BAILEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 14.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $253,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 477,  Location: AL - 4 CAHABA RIVER (Lat: 33.545972,  Lng: -86.613361),  Route carried "on" structure: US 78,  Year Built: 1955,  Status: Open,  Structure Length: 9.60m (31.50ft),  Average Daily Traffic: 2,825 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,643 (year 2041),  Design Load: HS 20,  Features Intersected: CAHABA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 178.026,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 37.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.55m (34.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,387,000,  Roadway Improvement Cost: $239,000,  Total Project Cost: $2,626,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 4771,  Location: US 78 * CAHABA RV (Lat: 33.545861,  Lng: -86.613361),  Route carried "on" structure: US 78,  Year Built: 1955,  Status: Open,  Structure Length: 9.61m (31.53ft),  Average Daily Traffic: 2,825 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,643 (year 2040),  Design Load: HS 20,  Features Intersected: CAHABA RV,  Facility Carried by Structure: AL - 4 EAST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 178.026,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 38.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.56m (34.65ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,389,000,  Roadway Improvement Cost: $239,000,  Total Project Cost: $2,628,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5383,  Location: AL 25 * US 78 (Lat: 33.540483,  Lng: -86.534350),  Route carried "on" structure: US 411,  Year Built: 1924,  Year Reconstructed: 1956,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 3,580 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,746 (year 2041),  Features Intersected: BRANCH,  Facility Carried by Structure: AL - 25
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 272.385,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $296,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $326,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7213,  Location: 0 . 6 MI E ST CLAIR CO LN (Lat: 33.563000,  Lng: -86.541000),  Route carried "on" structure: City street ,  Year Built: 1961,  Status: Open,  Structure Length: 6.98m (22.90ft),  Average Daily Traffic: 868 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,234 (year 2040),  Design Load: HS 20,  Features Intersected: I - 20,  Facility Carried by Structure: DAWSON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.01m (26.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,429,000,  Roadway Improvement Cost: $143,000,  Total Project Cost: $1,572,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7214,  Location: .1 MI.W.US 411 (Lat: 33.559722,  Lng: -86.525833),  Route carried "on" structure: Interstate 20,  Year Built: 1961,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 65,150 (year 2020),  Truck Traffic: 24%,  Average Future Daily Traffic: 78,712 (year 2040),  Design Load: HS 20,  Features Intersected: LITTLE CAHABA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 232.318,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 39.2m (128.6ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 43.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,004,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $2,204,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7429,  Location: PALMER AV * LIL CAHABA RV (Lat: 33.566667,  Lng: -86.533333),  Route carried "on" structure: City street ,  Year Built: 1961,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 510 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,000 (year 2040),  Design Load: H 15,  Features Intersected: LIL CAHABA RV,  Facility Carried by Structure: PALMER AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.300,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.6m (18.4ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $269,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $296,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 8393,  Location: 1500' E AL 119 (Lat: 33.524519,  Lng: -86.575411),  Route carried "on" structure: County highway 75,  Year Built: 1964,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 2,468 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,400 (year 2040),  Design Load: HS 20,  Features Intersected: LITTLE CAHABA RIVER,  Facility Carried by Structure: ELLIOT LANE(LEEDS)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 47.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $631,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $694,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10785,  Location: 0.5 MI N US 78 (LOVICK) (Lat: 33.553833,  Lng: -86.618117),  Route carried "on" structure: County highway 96,  Year Built: 1972,  Status: Open,  Structure Length: 5.04m (16.54ft),  Average Daily Traffic: 4,755 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,640 (year 2040),  Design Load: HS 20,  Features Intersected: NORFOLK SO RR,  Facility Carried by Structure: FLOYD BRADFORD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.4m (24.3ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 77.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.05m (19.85ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,287,000,  Roadway Improvement Cost: $129,000,  Total Project Cost: $1,416,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11482,  Location: VIVIAN ST * LIL CAHABA RV (Lat: 33.550000,  Lng: -86.566667),  Route carried "on" structure: City street ,  Year Built: 1975,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 720 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,500 (year 2040),  Design Load: H 15,  Features Intersected: LIL CAHABA RV,  Facility Carried by Structure: VIVIAN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.698,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.11m (6.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $448,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $493,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1204,  Location: JONES ST * LIL CAHABA RV (Lat: 33.555383,  Lng: -86.534672),  Route carried "on" structure: City street ,  Year Built: 1978,  Status: Closed,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 10 (year 2022),  Average Future Daily Traffic: 17 (year 2042),  Design Load: H 10,  Features Intersected: LIL CAHABA RV,  Facility Carried by Structure: JONES ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.999,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.7m (15.4ft)

Condition: Deck: Serious,  Superstructure: Fair,  Substructure: Serious,  Channel: Fair,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.45m (4.76ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: March 2020,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $149,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $164,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 13173,  Location: RIVERVIEW RD * I20 (Lat: 33.545642,  Lng: -86.620342),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Open,  Structure Length: 10.79m (35.40ft),  Average Daily Traffic: 1,000 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,500 (year 2041),  Design Load: HS 20,  Features Intersected: I20,  Facility Carried by Structure: RIVERVIEW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 34.1m (111.9ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 11.69m (38.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $2,404,000,  Roadway Improvement Cost: $240,000,  Total Project Cost: $2,644,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13174,  Location: I20 * CAHABA RIVER (Lat: 33.544500,  Lng: -86.616600),  Route carried "on" structure: Interstate 20,  Year Built: 1984,  Status: Open,  Structure Length: 18.26m (59.91ft),  Average Daily Traffic: 35,000 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 42,286 (year 2040),  Design Load: HS 20,  Features Intersected: CAHABA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 222.781,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 57.9m (190.0ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 72.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.93m (62.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $7,657,000,  Roadway Improvement Cost: $766,000,  Total Project Cost: $8,423,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13175,  Location: I20 * CAHABA RIVER (Lat: 33.544800,  Lng: -86.618400),  Route carried "on" structure: Interstate 20,  Year Built: 1984,  Status: Open,  Structure Length: 22.56m (74.02ft),  Average Daily Traffic: 35,000 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 42,286 (year 2040),  Design Load: HS 20,  Features Intersected: CAHABA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 222.798,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 57.9m (190.0ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 36.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 22.56m (74.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $9,125,000,  Roadway Improvement Cost: $913,000,  Total Project Cost: $10,038,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13527,  Location: I20 * US 78 LEEDS (Lat: 33.544800,  Lng: -86.592600),  Route carried "on" structure: Interstate 20,  Year Built: 1985,  Status: Open,  Structure Length: 11.83m (38.81ft),  Average Daily Traffic: 35,000 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 42,286 (year 2040),  Design Load: HS 20,  Features Intersected: AL - 4 (US 78)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 225.326,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 58.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 12.69m (41.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $4,698,000,  Roadway Improvement Cost: $470,000,  Total Project Cost: $5,168,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13528,  Location: I20 * US 78 (Lat: 33.544700,  Lng: -86.592400),  Route carried "on" structure: Interstate 20,  Year Built: 1985,  Status: Open,  Structure Length: 11.83m (38.81ft),  Average Daily Traffic: 35,000 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 42,286 (year 2040),  Design Load: HS 20,  Features Intersected: AL - 4 ( US 78)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 225.326,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 61.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.69m (41.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $4,698,000,  Roadway Improvement Cost: $470,000,  Total Project Cost: $5,168,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16892,  Location: AL 119 * LITTLE CAHABA RI (Lat: 33.515000,  Lng: -86.586667),  Route carried "on" structure: State highway 119,  Year Built: 1999,  Status: Open,  Structure Length: 5.02m (16.47ft),  Average Daily Traffic: 6,200 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 8,139 (year 2041),  Design Load: HS 20,  Features Intersected: LITTLE CAHABA RIVER
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 58.580,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.7m (54.8ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.04m (19.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,904,000,  Roadway Improvement Cost: $190,000,  Total Project Cost: $2,094,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19298,  Location: .1 MILE FROM US 411 00 (Lat: 33.555133,  Lng: -86.534728),  Route carried "on" structure: City street ,  Year Built: 1992,  Status: Open,  Structure Length: 2.21m (7.25ft),  Average Daily Traffic: 500 (year 2020),  Average Future Daily Traffic: 700 (year 2040),  Design Load: HS 20,  Features Intersected: L LITTLE CAHABA RIVER,  Facility Carried by Structure: OLIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.4m (24.3ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.1m (72.5ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.01m (9.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $557,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $613,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20894,  Location: 0.6 MI E OF AL 119 (Lat: 33.541181,  Lng: -86.538003),  Route carried "on" structure: City street ,  Year Built: 1985,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 300 (year 2022),  Average Future Daily Traffic: 420 (year 2042),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: NO NAME ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 46.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $255,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $281,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21424,  Location: 1.8 miles NE US 78 Leeds (Lat: 33.568978,  Lng: -86.604044),  Route carried "on" structure: County highway 96,  Year Built: 2020,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 4,551 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,000 (year 2040),  Design Load: HS 20,  Features Intersected: Stinking Creek,  Facility Carried by Structure: Floyd Bradford Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.9m (22.6ft),  Material/Design: Prestressed concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 34.6m (113.5ft)

Condition: Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 82.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 62.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,177,000,  Roadway Improvement Cost: $118,000,  Total Project Cost: $1,295,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1184,  Location: LEEDS (Lat: 33.540858,  Lng: -86.535033),  Route carried "under" structure: Other road 4,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 6,280 (year 2013),  Truck Traffic: 5%,  Features Intersected: US 78,  Facility Carried by Structure: RR
Minimum Vertical Clearance: 7.68m (25.20ft),  Kilometerpoint: 185.718,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 11.0m (36.1ft)

Find on map >>   Show street view

Structure Number: 7211,  Location: I-20 * C OF GA RR (Lat: 33.555367,  Lng: -86.571447),  Route carried "under" structure: Other road 20,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 65,150 (year 2013),  Truck Traffic: 24%,  Features Intersected: I-20,  Facility Carried by Structure: NS RR
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 229.090,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 7212,  Location: I-20*SOU RR (Lat: 33.555000,  Lng: -86.571944),  Route carried "under" structure: Other road 20,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 65,150 (year 2013),  Truck Traffic: 24%,  Features Intersected: I-20,  Facility Carried by Structure: SOUTHERN RR
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 228.575,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 7213,  Location: 0 . 6 MI E ST CLAIR CO LN (Lat: 33.563000,  Lng: -86.541000),  Route carried "under" structure: Interstate 20,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 65,150 (year 2020),  Truck Traffic: 24%,  Features Intersected: I - 20,  Facility Carried by Structure: DAWSON STREET
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 230.777,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 13173,  Location: RIVERVIEW RD * I20 (Lat: 33.545642,  Lng: -86.620342),  Route carried "under" structure: Interstate 20,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 70,937 (year 2021),  Truck Traffic: 21%,  Features Intersected: I20,  Facility Carried by Structure: RIVERVIEW ROAD
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 223.427,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 13527,  Location: I20 * US 78 LEEDS (Lat: 33.544800,  Lng: -86.592600),  Route carried "under" structure: US 78,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 2,790 (year 2020),  Truck Traffic: 7%,  Features Intersected: AL - 4 (US 78),  Facility Carried by Structure: I - 20 WEST
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 179.925,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 13528,  Location: I20 * US 78 (Lat: 33.544700,  Lng: -86.592400),  Route carried "under" structure: US 78,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 2,790 (year 2020),  Truck Traffic: 7%,  Features Intersected: AL - 4 ( US 78),  Facility Carried by Structure: I - 20 EAST
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 179.925,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Discuss Leeds, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.