Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Leighton, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 31Number of bridges
  • 354ft / 108mTotal length
  • $30,448,000Total costs
  • 99,785Total average daily traffic
  • 7,634Total average daily truck traffic
  • 137,471Total future (year 2033) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Leighton
  • No street view available for this location

New bridges in Leighton, AL - historical statistics
  • New bridges - historical statistics
  • 31920-1929
  • 11930-1939
  • 211950-1959
  • 21970-1979
  • 31980-1989
  • 11990-1999
Reconstructed bridges in Leighton, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Leighton, AL
Average Bridge Truck Traffic in Leighton, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.9%Very good
  • 29.4%Good
  • 47.1%Satisfactory
  • 17.6%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.9%Very good
  • 47.1%Good
  • 17.6%Satisfactory
  • 29.4%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.8%Very good
  • 29.4%Good
  • 29.4%Satisfactory
  • 29.4%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.2%Excellent
  • 6.5%Very good
  • 35.5%Good
  • 35.5%Satisfactory
  • 12.9%Fair
  • 6.5%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 7.1%Excellent
  • 28.6%Good
  • 64.3%Satisfactory
Find on map >>   Show street view

Structure Number: 462,  Location: 3.8 MI E JCT SR 2 & I 65 (Lat: 34.765000,  Lng: -86.878333),  Route carried "on" structure: US 72,  Year Built: 1928,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 9,320 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 11,327 (year 2033),  Design Load: H 15,  Features Intersected: FRENCH MILL CREEK,  Facility Carried by Structure: SR 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 129.369,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.08m (10.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $696,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $766,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 467,  Location: 0.8 MI S CONECUH CO LINE (Lat: 31.252528,  Lng: -87.048250),  Route carried "on" structure: US 31,  Year Built: 1928,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 3,891 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 5,836 (year 2039),  Design Load: H 15,  Features Intersected: BLUE BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 129.530,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.6m (28.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 62.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $263,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $289,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 468,  Location: 0.2 MI S CONECUH CO LINE (Lat: 31.257222,  Lng: -87.038611),  Route carried "on" structure: US 31,  Year Built: 1928,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 3,891 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 5,836 (year 2039),  Design Load: H 15,  Features Intersected: BEE BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 130.629,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.6m (28.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $387,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $426,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1435,  Location: SEC 11 T4S R5W (Lat: 34.703247,  Lng: -87.020639),  Route carried "on" structure: County highway 16,  Year Built: 1936,  Status: Posted for load,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 120 (year 2014),  Truck Traffic: 1%,  Average Future Daily Traffic: 200 (year 2034),  Features Intersected: MUD CREEK,  Facility Carried by Structure: LINDSEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 7.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 4.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.23m (7.32ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $306,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $337,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 457,  Location: 0.6 MI.W.OF SOU.RR (Lat: 32.431667,  Lng: -86.961667),  Route carried "on" structure: State highway 14,  Year Built: 1953,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 5,930 (year 2013),  Truck Traffic: 12%,  Average Future Daily Traffic: 7,987 (year 2033),  Design Load: H 20,  Features Intersected: BEECH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 193.134,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 37.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 4572,  Location: 1.0 MI E MISS ST LINE (Lat: 33.335067,  Lng: -88.293083),  Route carried "on" structure: State highway 14,  Year Built: 1953,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,054 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,778 (year 2042),  Design Load: H 15,  Features Intersected: Mount Olive Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.650,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 82.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $262,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $288,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 4573,  Location: 2.7 MI E MISS ST LINE (Lat: 33.320183,  Lng: -88.274267),  Route carried "on" structure: State highway 14,  Year Built: 1953,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,054 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,778 (year 2040),  Design Load: H 15,  Features Intersected: Lindsey Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.324,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 76.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $380,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $418,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 4578,  Location: WARRIOR RD ASHTO (Lat: 33.791842,  Lng: -85.992253),  Route carried "on" structure: County highway 15,  Year Built: 1953,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 688 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,129 (year 2040),  Design Load: HS 20,  Features Intersected: OHATCHEE CREEK,  Facility Carried by Structure: WARRIOR RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.32m (24.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,506,000,  Roadway Improvement Cost: $151,000,  Total Project Cost: $1,657,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 4579,  Location: 500 FT N OF WAVERLY DR (Lat: 32.333847,  Lng: -86.270442),  Route carried "on" structure: City street ,  Year Built: 1953,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 4,500 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,100 (year 2038),  Design Load: H 15,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: WOODLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.300,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 61.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $372,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $409,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 4586,  Location: 1 MI. N.W. FOUNTAIN (Lat: 31.615508,  Lng: -87.417008),  Route carried "on" structure: County highway 17,  Year Built: 1953,  Status: Posted for load,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 1,100 (year 2000),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,300 (year 2033),  Design Load: H 20,  Features Intersected: HOLLY MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $807,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $888,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 4614,  Location: 2MI SOUTH OF AL HWY97 (Lat: 32.108167,  Lng: -86.526556),  Route carried "on" structure: County highway 37,  Year Built: 1953,  Status: Posted for load,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 460 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 550 (year 2035),  Design Load: H 15,  Features Intersected: UNNAMED CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 9.29m (30.48ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $1,465,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $1,612,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 4615,  Location: 2MI SOUTH OF AL HWY97 (Lat: 32.109833,  Lng: -86.525278),  Route carried "on" structure: County highway 37,  Year Built: 1953,  Status: Posted for load,  Structure Length: 9.32m (30.58ft),  Average Daily Traffic: 460 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 550 (year 2035),  Design Load: H 15,  Features Intersected: UNNAMED CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 10.28m (33.73ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $1,621,000,  Roadway Improvement Cost: $162,000,  Total Project Cost: $1,783,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 4667,  Location: MUDD ST. (CULVERT) (Lat: 33.695347,  Lng: -86.052608),  Route carried "on" structure: County highway 93,  Year Built: 1953,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 1,155 (year 1993),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,655 (year 2040),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: MUDD ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 72.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $437,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $481,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4668,  Location: 0.1 MI N JCT CO RT 236 (Lat: 34.541667,  Lng: -87.321667),  Route carried "on" structure: County highway 243,  Year Built: 1998,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 40 (year 1987),  Average Future Daily Traffic: 100 (year 2036),  Features Intersected: MILLIGAN BRANCH
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Very good,  Culverts: Excellent,  Operating Rating: 66.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $286,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $315,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 4669,  Location: 9.8 MI E AL HWY 28 (Lat: 32.549403,  Lng: -87.952928),  Route carried "on" structure: County highway 1107,  Year Built: 1953,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 290 (year 2022),  Truck Traffic: 10%,  Average Future Daily Traffic: 410 (year 2039),  Design Load: H 15,  Features Intersected: CO RT 1107 HALLS CREEK,  Facility Carried by Structure: ROADWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.37m (14.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2022,  Bridge Improvement Cost: $749,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $824,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 4672,  Location: 0.2 MI W JCT SR 44 (Lat: 33.965750,  Lng: -87.911361),  Route carried "on" structure: US 118,  Year Built: 1953,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 7,280 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 10,020 (year 2033),  Design Load: H 15,  Features Intersected: Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.894,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.4m (57.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $976,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,074,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 4676,  Location: 2.5 MI S JCT SR 159 (Lat: 33.629333,  Lng: -87.836833),  Route carried "on" structure: State highway 171,  Year Built: 1953,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 2,103 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,904 (year 2040),  Design Load: H 15,  Features Intersected: Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 50.652,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $430,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $473,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 4677,  Location: 3 MI N JCT SR 107 (Lat: 33.995639,  Lng: -87.929472),  Route carried "on" structure: US 43,  Year Built: 1953,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 3,490 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,546 (year 2041),  Design Load: H 20,  Features Intersected: Beaver Creek,  Facility Carried by Structure: AL-171
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 100.664,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 51.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,403,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $1,543,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 4678,  Location: FAYETTE CO LINE (Lat: 33.522167,  Lng: -87.801833),  Route carried "on" structure: State highway 171,  Year Built: 1953,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 2,345 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,843 (year 2040),  Design Load: H 15,  Features Intersected: BEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.924,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 72.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,135,000,  Roadway Improvement Cost: $114,000,  Total Project Cost: $1,249,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 4681,  Location: CR 482 TALLAPOOSA RIVER (Lat: 33.619864,  Lng: -85.449664),  Route carried "on" structure: County highway 482,  Year Built: 1953,  Status: Posted for load,  Structure Length: 6.83m (22.41ft),  Average Daily Traffic: 50 (year 2010),  Average Future Daily Traffic: 175 (year 2035),  Design Load: H 10,  Features Intersected: TALLAPOOSA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 33.8m (110.9ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 7.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 5.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 7.87m (25.82ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: Febuary 2022,  Critical Feature Inspection Date: Febuary 2022,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $647,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $712,000 ( Estimate for 2022),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4682,  Location: 0.7 MI E JCT US 431 (Lat: 33.856278,  Lng: -85.904944),  Route carried "on" structure: State highway 204,  Year Built: 1953,  Status: Open,  Structure Length: 0.68m (2.23ft),  Average Daily Traffic: 3,850 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,390 (year 2040),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 52.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $416,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $458,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 4683,  Location: 4.7 MI E JCT US 431 (Lat: 33.839833,  Lng: -85.843000),  Route carried "on" structure: State highway 204,  Year Built: 1953,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 3,990 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,586 (year 2040),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.627,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.63m (5.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $376,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $414,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 4684,  Location: 5.7 MI E JCT US 431 (Lat: 33.834411,  Lng: -85.827544),  Route carried "on" structure: State highway 204,  Year Built: 1953,  Status: Open,  Structure Length: 7.99m (26.21ft),  Average Daily Traffic: 6,000 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,400 (year 2039),  Design Load: H 15,  Features Intersected: ABAND RR/RABES BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.267,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 40.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.00m (29.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,604,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $1,764,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 4685,  Location: 8.6 MI E JCT US 431 (Lat: 33.824278,  Lng: -85.782917),  Route carried "on" structure: State highway 204,  Year Built: 1953,  Status: Open,  Structure Length: 1.91m (6.27ft),  Average Daily Traffic: 5,702 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 7,983 (year 2040),  Design Load: H 15,  Features Intersected: HANES BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.885,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.64m (8.66ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $640,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $704,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 4687,  Location: 2.3 MI W JCT US HWY 72 (Lat: 34.696458,  Lng: -86.422181),  Route carried "on" structure: County highway 233,  Year Built: 1953,  Status: Posted for load,  Structure Length: 15.15m (49.70ft),  Average Daily Traffic: 2,297 (year 2001),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,859 (year 2035),  Design Load: H 15,  Features Intersected: FLINT RIVER,  Facility Carried by Structure: LITTLE COVE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 9,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 40.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 15.92m (52.23ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2022,  Underwater Inspection Date: July 2020,  Other Special Inspection Date: March 2022,  Bridge Improvement Cost: $2,729,000,  Roadway Improvement Cost: $273,000,  Total Project Cost: $3,002,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1121,  Location: 4.6 M E JCT SR 20 & SR157 (Lat: 34.683508,  Lng: -87.511381),  Route carried "on" structure: State highway 20,  Year Built: 1974,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 8,560 (year 2020),  Truck Traffic: 26%,  Average Future Daily Traffic: 11,529 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 59.409,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.8m (81.4ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $967,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $1,064,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11635,  Location: LEON DOUGLAS RD (Lat: 34.700317,  Lng: -87.539575),  Route carried "on" structure: County highway 40002,  Year Built: 1976,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 250 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 500 (year 2041),  Design Load: H 15,  Features Intersected: LEIGHTON BRANCH,  Facility Carried by Structure: LEON DOUGLAS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 56.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $387,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 13221,  Location: 0.8 MI S FLINT RIVER (Lat: 34.623333,  Lng: -86.456667),  Route carried "on" structure: US 431,  Year Built: 1984,  Status: Open,  Structure Length: 7.35m (24.11ft),  Average Daily Traffic: 19,076 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 26,706 (year 2039),  Design Load: HS 20,  Features Intersected: FLINT RIVER RELIEF #5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 519.318,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 57.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.37m (27.46ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,469,000,  Roadway Improvement Cost: $247,000,  Total Project Cost: $2,716,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13557,  Location: BUZZARD ROOST ROSE TRAIL (Lat: 34.773356,  Lng: -88.078617),  Route carried "on" structure: County highway 1,  Year Built: 1985,  Status: Open,  Structure Length: 8.11m (26.61ft),  Average Daily Traffic: 360 (year 1985),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,000 (year 2041),  Design Load: HS 20,  Features Intersected: BUZZARD ROOST CREEK,  Facility Carried by Structure: RIVERTON ROSE TR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.6m (21.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 63.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.11m (29.89ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: June 2021,  Underwater Inspection Date: April 2018,  Bridge Improvement Cost: $1,937,000,  Roadway Improvement Cost: $194,000,  Total Project Cost: $2,131,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13639,  Location: 0.08 Mi N of CR-45 (Lat: 32.760803,  Lng: -86.293483),  Route carried "on" structure: County highway 31,  Year Built: 1985,  Status: Open,  Structure Length: 2.20m (7.22ft),  Average Daily Traffic: 379 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 384 (year 2041),  Design Load: HS 20,  Features Intersected: Town Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 53.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $534,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $587,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 14352,  Location: 1.32 M.E AL 154 (Lat: 31.779147,  Lng: -87.985286),  Route carried "on" structure: County highway ,  Year Built: 1957,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 3.12m (10.24ft),  Average Daily Traffic: 100 (year 1995),  Average Future Daily Traffic: 110 (year 2040),  Features Intersected: HARRIS CREEK,  Facility Carried by Structure: NORRIS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 7.8m (25.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 88.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.98m (13.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $709,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $780,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Discuss Leighton, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.