Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Leroy, Texas (TX)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 22Number of bridges
  • 180ft / 55.1mTotal length
  • $7,285,000Total costs
  • 15,723Total average daily traffic
  • 1,785Total average daily truck traffic
  • 22,315Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Leroy
  • No street view available for this location

New bridges in Leroy, TX - historical statistics
  • New bridges - historical statistics
  • 61950-1959
  • 61960-1969
  • 41970-1979
  • 21990-1999
  • 32000-2009
  • 12010-2019
Average Bridge Truck Traffic in Leroy, TX
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 15.4%Very good
  • 69.2%Good
  • 15.4%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.7%Very good
  • 53.8%Good
  • 38.5%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 38.5%Good
  • 53.8%Satisfactory
  • 7.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 13.6%Good
  • 68.2%Satisfactory
  • 18.2%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 55.6%Good
  • 33.3%Satisfactory
  • 11.1%Fair
Find on map >>   Show street view

Structure Number: 91610083404014,  Location: 1.1 Mi N of FM 2311 (Lat: 31.745625,  Lng: -97.009544),  Route carried "on" structure: State highway 308,  Year Built: 1952,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 1,150 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 1,840 (year 2037),  Design Load: H 15,  Features Intersected: Rice Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.036,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.03m (16.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $800,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610083404015,  Location: 2.60 Mi SW of Hill C/L (Lat: 31.752856,  Lng: -97.006017),  Route carried "on" structure: State highway 308,  Year Built: 1951,  Year Reconstructed: 1968,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,150 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 1,840 (year 2037),  Design Load: H 20,  Features Intersected: Moses Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.168,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $400,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610083404016,  Location: 3.2 Mi N of FM 2311 (Lat: 31.771633,  Lng: -96.993039),  Route carried "on" structure: State highway 308,  Year Built: 1952,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 981 (year 2018),  Truck Traffic: 17%,  Average Future Daily Traffic: 1,400 (year 2037),  Design Load: H 15,  Features Intersected: Ash Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.722,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $600,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610083404017,  Location: 0.80 Mi SW of Hill C/L (Lat: 31.775550,  Lng: -96.990161),  Route carried "on" structure: State highway 308,  Year Built: 1951,  Year Reconstructed: 1968,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 981 (year 2018),  Truck Traffic: 17%,  Average Future Daily Traffic: 1,400 (year 2037),  Design Load: H 20,  Features Intersected: Hoen Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.233,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $400,000
Find on map >>   Show street view

Structure Number: 9161008340402,  Location: 1.9 Mi SW of FM 2311 (Lat: 31.714961,  Lng: -97.042931),  Route carried "on" structure: State highway 308,  Year Built: 1953,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 1,756 (year 2017),  Truck Traffic: 19%,  Average Future Daily Traffic: 2,460 (year 2037),  Design Load: H 15,  Features Intersected: Elm Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.889,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.03m (16.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $800,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610217401001,  Location: 4.10 Mi SE of FM 2114 (Lat: 31.754019,  Lng: -97.050650),  Route carried "on" structure: State highway 2311,  Year Built: 1957,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,312 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,720 (year 2037),  Features Intersected: Br Elm Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.608,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,000,  Total Project Cost: $1,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610217401003,  Location: 0.30 Mi E of FM 308 (Lat: 31.729764,  Lng: -97.013133),  Route carried "on" structure: State highway 2311,  Year Built: 1966,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,026 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,310 (year 2037),  Design Load: HS 20,  Features Intersected: Trib Rice Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.951,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020
Find on map >>   Show street view

Structure Number: 91610217401005,  Location: 1.30 Mi SE of FM 308 (Lat: 31.725581,  Lng: -96.997008),  Route carried "on" structure: State highway 2311,  Year Built: 1966,  Status: Open,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 928 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,310 (year 2037),  Design Load: H 15,  Features Intersected: Tehuacana Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.621,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.32m (24.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $653,000,  Roadway Improvement Cost: $163,000,  Total Project Cost: $816,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610217401006,  Location: 1.50 Mi SE of FM 308 (Lat: 31.724494,  Lng: -96.994953),  Route carried "on" structure: State highway 2311,  Year Built: 1966,  Status: Open,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 928 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,310 (year 2037),  Design Load: H 15,  Features Intersected: Tehuacana Creek Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.856,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.32m (24.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $653,000,  Roadway Improvement Cost: $163,000,  Total Project Cost: $816,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610217401007,  Location: 2.10 Mi SE of FM 308 (Lat: 31.717622,  Lng: -96.987908),  Route carried "on" structure: State highway 2311,  Year Built: 1966,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 928 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,310 (year 2037),  Design Load: HS 20,  Features Intersected: Br Cottonwood Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.904,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020
Find on map >>   Show street view

Structure Number: 91610217401008,  Location: 2.50 Mi NW of SH 31 (Lat: 31.712703,  Lng: -96.985164),  Route carried "on" structure: State highway 2311,  Year Built: 1966,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 928 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,310 (year 2037),  Design Load: HS 20,  Features Intersected: Cottonwood Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.516,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610217401009,  Location: 1.1 Mi NW of SH 31 (Lat: 31.696544,  Lng: -96.977189),  Route carried "on" structure: State highway 2311,  Year Built: 1966,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 990 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,260 (year 2037),  Design Load: HS 20,  Features Intersected: Roberts Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.898,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021
Find on map >>   Show street view

Structure Number: 9161021740101,  Location: 1.20 Mi SE of FM 308 (Lat: 31.726378,  Lng: -96.998356),  Route carried "on" structure: State highway 2311,  Year Built: 2010,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 928 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,310 (year 2037),  Design Load: HL 93,  Features Intersected: Rice Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.404,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 91610323401005,  Location: 0.90 Mi SW of FM 2114 (Lat: 31.746881,  Lng: -97.064744),  Route carried "on" structure: State highway 3149,  Year Built: 1972,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 817 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,620 (year 2037),  Design Load: HS 20,  Features Intersected: Elm Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.362,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $400,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610AA0466001,  Location: 4.45 MI NORTH OF LEROY (Lat: 31.795061,  Lng: -97.007378),  Route carried "on" structure: County highway ,  Year Built: 2004,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 100 (year 2020),  Average Future Daily Traffic: 75 (year 2036),  Features Intersected: ASH CREEK #761,  Facility Carried by Structure: CERVENKA RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610AA0467001,  Location: 0.85 MI SE OF FM 308 (Lat: 31.770583,  Lng: -96.978031),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 119 (year 2020),  Average Future Daily Traffic: 125 (year 2036),  Design Load: HS 20,  Features Intersected: TEHUACANA CRK #764,  Facility Carried by Structure: COUNTY LINE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.230,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $153,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $192,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610AA0485002,  Location: 2.00 MI NE OF FM 2311 (Lat: 31.780681,  Lng: -97.031275),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Posted for load,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 100 (year 2020),  Average Future Daily Traffic: 75 (year 2036),  Features Intersected: RICE CRK #660,  Facility Carried by Structure: SNIDER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $251,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $313,000,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610AA0489001,  Location: 0.85 MI NE OF FM 2311 (Lat: 31.764703,  Lng: -97.028561),  Route carried "on" structure: County highway ,  Year Built: 1975,  Status: Posted for load,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 115 (year 2020),  Average Future Daily Traffic: 75 (year 2036),  Features Intersected: RICE CRK #644,  Facility Carried by Structure: RICE CRK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.368,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $251,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $313,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610AA0508003,  Location: 0.25 MI SW OF GERALD LN (Lat: 31.705694,  Lng: -97.035233),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 100 (year 2020),  Average Future Daily Traffic: 140 (year 2036),  Design Load: HS 20,  Features Intersected: ELM CRK #291,  Facility Carried by Structure: JANKE LP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.32m (24.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $670,000,  Roadway Improvement Cost: $243,000,  Total Project Cost: $913,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 91610AA0544002,  Location: 1.85 MI SW OF FM 2311 (Lat: 31.733158,  Lng: -97.058200),  Route carried "on" structure: County highway ,  Year Built: 1973,  Status: Posted for load,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 140 (year 2016),  Average Future Daily Traffic: 200 (year 2036),  Features Intersected: ELM CRK #612,  Facility Carried by Structure: BLUHM RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.794,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $251,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $313,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610AA0609001,  Location: 0.35 MI SW OF FM 2311 (Lat: 31.762883,  Lng: -97.067606),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 128 (year 2020),  Average Future Daily Traffic: 75 (year 2036),  Design Load: HS 20,  Features Intersected: ELM CREEK #663,  Facility Carried by Structure: EASY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.736,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610AA0611003,  Location: 1.05 MI SW OF FM 2311 (Lat: 31.739817,  Lng: -97.044719),  Route carried "on" structure: County highway ,  Year Built: 2008,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 118 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 150 (year 2036),  Design Load: HS 20,  Features Intersected: ELM CRK TRIB #614,  Facility Carried by Structure: BLUHM RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.081,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $167,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $208,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Leroy, Texas (TX) on our hugely popular Texas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.