  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 135ft / 40.8mTotal length
  • $28,781,000Total costs
  • 127,455Total average daily traffic
  • 1,756Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Lewisboro
  • No street view available for this location

New bridges in Lewisboro, NY - historical statistics
  • New bridges - historical statistics
  • 21900-1909
  • 11910-1919
  • 21930-1939
  • 11950-1959
  • 41970-1979
  • 12020-2022
Average Bridge Daily Traffic in Lewisboro, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Very good
  • 37.5%Good
  • 37.5%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.0%Very good
  • 25.0%Good
  • 37.5%Satisfactory
  • 12.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Very good
  • 25.0%Good
  • 25.0%Fair
  • 25.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.3%Very good
  • 28.6%Good
  • 57.1%Satisfactory
Find on map >>   Show street view

Structure Number: 102344,  Location: JCT RTS 35+121 (Lat: 41.262603,  Lng: -73.615278),  Route carried "on" structure: State highway 35,  Year Built: 1910,  Status: Posted for load-capacity,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 13,316 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 16,176 (year 2040),  Features Intersected: Trib. Cross River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.780,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 52.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $231,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $367,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 102345,  Location: 3 MI S JCT SH 22 & SH 35 (Lat: 41.275236,  Lng: -73.578322),  Route carried "on" structure: State highway 35,  Year Built: 1937,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 13,338 (year 2015),  Truck Traffic: 4%,  Average Future Daily Traffic: 16,203 (year 2040),  Design Load: H 20,  Features Intersected: WACCABUC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.883,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 5 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,110,000,  Roadway Improvement Cost: $650,000,  Total Project Cost: $1,759,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 103742,  Location: 4.6 MI N JCT RTS 121+22 (Lat: 41.261456,  Lng: -73.614650),  Route carried "on" structure: State highway 121,  Year Built: 1906,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 2,773 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,368 (year 2040),  Features Intersected: CROSS RIVER RESER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.434,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: Local Agency,  Maintenance Responsibility: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 47.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2020,  Underwater Inspection Date: September 2019,  Bridge Improvement Cost: $394,000,  Roadway Improvement Cost: $231,000,  Total Project Cost: $625,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 109544,  Location: JCT.RTE 138 & I684 (Lat: 41.295131,  Lng: -73.676986),  Route carried "on" structure: State highway 138,  Year Built: 1976,  Status: Open,  Structure Length: 12.53m (41.11ft),  Average Daily Traffic: 7,800 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,650 (year 2040),  Design Load: HS 20,  Features Intersected: 684I684I87011200 NB, PAR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.655,  Lanes on structure: 3,  Lanes under structure: 9,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 38.4m (126.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Operating Rating: 11.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 8.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.52m (41.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $7,144,000,  Roadway Improvement Cost: $4,183,000,  Total Project Cost: $11,327,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 109544A,  Location: JCT SH 138 & I684 (Lat: 41.295306,  Lng: -73.677517),  Route carried "on" structure: Ramp Other road 138,  Year Built: 1976,  Status: Open,  Structure Length: 18.29m (60.01ft),  Average Daily Traffic: 7,800 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,650 (year 2040),  Design Load: HS 20,  Features Intersected: ADJACENT TO 684I
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.623,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Operating Rating: 69.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.28m (59.97ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $4,789,000,  Roadway Improvement Cost: $2,804,000,  Total Project Cost: $7,593,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 225605,  Location: AT BRONXVILLE (Lat: 40.936508,  Lng: -73.836150),  Route carried "on" structure: Other road ,  Year Built: 1952,  Status: Open,  Structure Length: 3.93m (12.89ft),  Truck Traffic: 15%,  Features Intersected: BRONX RIVER,  Facility Carried by Structure: PARKWAY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 17.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 13.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $3,555,000,  Roadway Improvement Cost: $2,082,000,  Total Project Cost: $5,637,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226569,  Location: 5.2 MI SE CROTON FALLS (Lat: 41.287542,  Lng: -73.557147),  Route carried "on" structure: Other road ,  Year Built: 1930,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 120 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 168 (year 2037),  Features Intersected: TRUESDALE LAKE OUTLET,  Facility Carried by Structure: INDIAN LANE
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $116,000,  Roadway Improvement Cost: $68,000,  Total Project Cost: $184,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334852,  Location: 12.0 MI.E.OF MT.KISCO (Lat: 41.221817,  Lng: -73.496100),  Route carried "on" structure: Other road ,  Year Built: 1909,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 172 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 241 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: NORWALK RESERVOIR,  Facility Carried by Structure: EAST STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.073,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.2m (36.7ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2021,  Underwater Inspection Date: September 2018,  Bridge Improvement Cost: $626,000,  Roadway Improvement Cost: $367,000,  Total Project Cost: $992,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 336497,  Location: 6.5 MI SE CROTON FALLS (Lat: 41.260294,  Lng: -73.601983),  Route carried "on" structure: Other road ,  Year Built: 2020,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 240 (year 2009),  Truck Traffic: 10%,  Average Future Daily Traffic: 336 (year 2029),  Features Intersected: CROSS RIVER,  Facility Carried by Structure: STONE HILL ROAD
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 20.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $188,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $297,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 109544,  Location: JCT.RTE 138 & I684 (Lat: 41.295131,  Lng: -73.676986),  Route carried "under" structure: State highway 22,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 3,987 (year 1999),  Features Intersected: 684I684I87011200 NB, PAR,  Facility Carried by Structure: RTE 138
Minimum Vertical Clearance: 8.99m (29.49ft),  Kilometerpoint: 34.352,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 109544,  Location: JCT.RTE 138 & I684 (Lat: 41.295131,  Lng: -73.676986),  Route carried "under" structure: Interstate 684,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 77,909 (year 2002),  Features Intersected: 684I684I87011200 NB, PAR,  Facility Carried by Structure: RTE 138
Minimum Vertical Clearance: 8.46m (27.76ft),  Kilometerpoint: 32.019,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Discuss Lewisboro, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.