Bridge Statistics for Lisbon, New Hampshire (NH)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 82ft / 24.8mTotal length
  • $34,562,000Total costs
  • 15,365Total average daily traffic
  • 1,059Total average daily truck traffic
  • 22,734Total future (year 2042) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Lisbon
  • No street view available for this location

New bridges in Lisbon, NH - historical statistics
  • New bridges - historical statistics
  • 31920-1929
  • 21960-1969
  • 51970-1979
  • 11980-1989
Reconstructed bridges in Lisbon, NH - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 21980-1989
  • 01990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Lisbon, NH
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Very good
  • 30.0%Good
  • 30.0%Satisfactory
  • 20.0%Fair
  • 10.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 30.0%Good
  • 30.0%Satisfactory
  • 30.0%Fair
  • 10.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 40.0%Good
  • 50.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.0%Good
  • 80.0%Satisfactory
Find on map >>   Show street view

Structure Number: 150006300078,  Location: 214 FT FROM NH RTE 112 (Lat: 44.214278,  Lng: -71.910964),  Route carried "on" structure: Other road ,  Year Built: 1960,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 6.77m (22.21ft),  Average Daily Traffic: 1,566 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,317 (year 2042),  Design Load: H 20,  Features Intersected: AMMONOOSUC RIVER,  Facility Carried by Structure: SCHOOL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.069,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.77m (22.21ft),  Designated Inspection Frequency: Every 16 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 150008200076,  Location: 0.7 MI FR NH RTE 112 (Lat: 44.211906,  Lng: -71.894092),  Route carried "on" structure: Other road ,  Year Built: 1928,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 1,098 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,625 (year 2042),  Design Load: H 15,  Features Intersected: PEARL LAKE BROOK,  Facility Carried by Structure: PEARL LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.147,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 24.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 150008300132,  Location: 1.09 MI NW JCT 302 (Lat: 44.247194,  Lng: -71.889600),  Route carried "on" structure: State highway ,  Year Built: 1928,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 1,098 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,625 (year 2042),  Design Load: H 15,  Features Intersected: MILL BROOK,  Facility Carried by Structure: LYMAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.386,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.61m (2.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 150008800125,  Location: 1.0 MI FROM LYMAN TL (Lat: 44.244672,  Lng: -71.888283),  Route carried "on" structure: Other road ,  Year Built: 1975,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 81 (year 2020),  Average Future Daily Traffic: 119 (year 2042),  Features Intersected: MILL BROOK,  Facility Carried by Structure: PLAINS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.019,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 22.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 16 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 150009000118,  Location: 1.3 MI FROM LYMAN TL (Lat: 44.243231,  Lng: -71.884331),  Route carried "on" structure: Other road ,  Year Built: 1970,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 106 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 156 (year 2042),  Features Intersected: MILL BROOK,  Facility Carried by Structure: BISHOP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.225,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 22.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 150009000121,  Location: .59 MI N.W. JCT. 302 (Lat: 44.243992,  Lng: -71.886228),  Route carried "on" structure: State highway ,  Year Built: 1974,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 759 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,123 (year 2042),  Design Load: HS 20,  Features Intersected: MILL BROOK,  Facility Carried by Structure: LYMAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.866,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 52.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 150009400112,  Location: 2.9 MI LANDAFF TL (Lat: 44.237403,  Lng: -71.881208),  Route carried "on" structure: US 302,  Year Built: 1979,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 4,772 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 7,062 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: NHRR(ABD)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.967,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 150009400114,  Location: 2.9 MI LANDAFF TL (Lat: 44.237969,  Lng: -71.880156),  Route carried "on" structure: US 302,  Year Built: 1980,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 9.27m (30.41ft),  Average Daily Traffic: 4,772 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 7,062 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: AMMONOOSUC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.074,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.7m (113.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 25.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.27m (30.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 150010100112,  Location: 0.3 MI FROM NH RTE 117 (Lat: 44.237578,  Lng: -71.875778),  Route carried "on" structure: Other road ,  Year Built: 1920,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 230 (year 2020),  Average Future Daily Traffic: 340 (year 2042),  Features Intersected: SALMON HOLE BROOK,  Facility Carried by Structure: RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.507,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 24.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 150011600108,  Location: 1.0 MI E. JCT. RT. 302 (Lat: 44.233647,  Lng: -71.860564),  Route carried "on" structure: State highway 117,  Year Built: 1969,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 802 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,186 (year 2042),  Design Load: HS 20,  Features Intersected: SALMON HOLE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.836,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1500123001,  Location: 0.3 MI FROM GULF RD NO 6 (Lat: 44.228361,  Lng: -71.852322),  Route carried "on" structure: Other road ,  Year Built: 1975,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 81 (year 2020),  Average Future Daily Traffic: 119 (year 2042),  Features Intersected: SALMON HOLE BROOK,  Facility Carried by Structure: BREEZY HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.597,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 22.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous