Bridge Statistics for Little Meadows, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 39ft / 11.5mTotal length
  • $791,000Total costs
  • 3,777Total average daily traffic
  • 239Total average daily truck traffic
  • 4,953Total future (year 2030) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Little Meadows
  • No street view available for this location

New bridges in Little Meadows, PA - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 21950-1959
  • 11960-1969
  • 11990-1999
  • 22000-2009
  • 32010-2019
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Very good
  • 42.9%Good
  • 42.9%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 28.6%Very good
  • 28.6%Good
  • 14.3%Fair
  • 28.6%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.3%Very good
  • 28.6%Good
  • 28.6%Satisfactory
  • 28.6%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.0%Good
  • 20.0%Satisfactory
  • 10.0%Fair
  • 50.0%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Very good
  • 66.7%Good
Find on map >>   Show street view

Structure Number: 628,  Location: VILLAGE OF WARREN CENTER (Lat: 41.938069,  Lng: -76.182425),  Route carried "on" structure: State highway ,  Year Built: 1996,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 755 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,001 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: WAPPASENING CREEK,  Facility Carried by Structure: SR 1038
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.410,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 32661,  Location: APOLACON TWP 619' E TR858 (Lat: 41.970933,  Lng: -76.110708),  Route carried "on" structure: State highway ,  Year Built: 1964,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 180 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 203 (year 2032),  Design Load: HS 20,  Features Intersected: APOLACON CREEK,  Facility Carried by Structure: SR 4013
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $12,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $161,000
Find on map >>   Show street view

Structure Number: 32662,  Location: APOLACON TP .2 M E TR 858 (Lat: 41.972306,  Lng: -76.108869),  Route carried "on" structure: State highway ,  Year Built: 1954,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 180 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 203 (year 2032),  Design Load: HS 20,  Features Intersected: CORK HILL CREEK,  Facility Carried by Structure: SR 4013
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.304,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $21,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $278,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 32672,  Location: LTL MEADWS BO .3M W TR858 (Lat: 41.989397,  Lng: -76.136375),  Route carried "on" structure: State highway ,  Year Built: 1940,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 970 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,262 (year 2032),  Design Load: HS 20,  Features Intersected: DEWING CREEK,  Facility Carried by Structure: SR 4018 MAPLE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.995,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Poor,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $207,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 32679,  Location: APOLACON TWP .1M E SR4013 (Lat: 41.970958,  Lng: -76.108369),  Route carried "on" structure: State highway ,  Year Built: 1953,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 305 (year 2022),  Truck Traffic: 11%,  Average Future Daily Traffic: 256 (year 2032),  Design Load: HS 20,  Features Intersected: BR APOLACON CREEK,  Facility Carried by Structure: SR 4044
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $11,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $145,000,  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 43334,  Location: 1MI MW OF LITTLE MEADOWS (Lat: 41.994058,  Lng: -76.134197),  Route carried "on" structure: City street 7407,  Year Built: 2004,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 50 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 75 (year 2031),  Features Intersected: DEWING CREEK,  Facility Carried by Structure: CEMETERY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 45047,  Location: LITTLE MEADOWS BOROUGH (Lat: 41.990406,  Lng: -76.127436),  Route carried "on" structure: City street ,  Year Built: 2008,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 50 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 75 (year 2030),  Design Load: H 15,  Features Intersected: APALACHIN CREEK,  Facility Carried by Structure: LITTLE MEADOWS #1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Poor,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: September 2020,  Other Special Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 4586,  Location: APOLACON TWP .6M E TR 858 (Lat: 41.975797,  Lng: -76.106236),  Route carried "on" structure: State highway ,  Year Built: 2010,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 180 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 203 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: CORK HILL CREEK,  Facility Carried by Structure: SR 4013
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.903,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Poor,  Culverts: Very good,  Operating Rating: 94.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 47581,  Location: LTL MEADOWS .3M N SR 4018 (Lat: 41.994658,  Lng: -76.132594),  Route carried "on" structure: State highway 858,  Year Built: 2012,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 857 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,322 (year 2032),  Design Load: HL 93,  Features Intersected: APOLACON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.352,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.1m (88.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 65.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 48595,  Location: 500' N OF INTER W/ SR 858 (Lat: 41.997506,  Lng: -76.134111),  Route carried "on" structure: City street ,  Year Built: 2014,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 250 (year 2014),  Truck Traffic: 3%,  Average Future Daily Traffic: 353 (year 2034),  Design Load: HL 93,  Features Intersected: TRIB APALACHIN CREEK,  Facility Carried by Structure: BOLLES HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020
Discuss Little Meadows, Pennsylvania (PA) on our hugely popular Pennsylvania forum.