Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Little Texas-Society Hill, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 167ft / 50.9mTotal length
  • $12,047,000Total costs
  • 5,039Total average daily traffic
  • 522Total average daily truck traffic
  • 6,235Total future (year 2034) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Little Texas-Society Hill
  • No street view available for this location

New bridges in Little Texas-Society Hill, AL - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 91960-1969
  • 51980-1989
Average Bridge Truck Traffic in Little Texas-Society Hill, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Good
  • 40.0%Satisfactory
  • 40.0%Fair
  • 10.0%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.0%Good
  • 30.0%Satisfactory
  • 40.0%Fair
  • 10.0%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.0%Good
  • 30.0%Satisfactory
  • 30.0%Fair
  • 20.0%Poor
  • 10.0%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 26.7%Good
  • 46.7%Satisfactory
  • 20.0%Fair
  • 6.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 60.0%Good
  • 40.0%Satisfactory
Find on map >>   Show street view

Structure Number: 149,  Location: 2ND AVE. * 6TH ST. (Lat: 33.506014,  Lng: -86.826631),  Route carried "on" structure: City street ,  Year Built: 1920,  Status: Posted for load,  Structure Length: 0.99m (3.25ft),  Average Daily Traffic: 2,500 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,000 (year 2038),  Features Intersected: BRANCH,  Facility Carried by Structure: 2ND AVE. NORTH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.699,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.1m (16.7ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.66m (5.45ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $671,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $738,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7371,  Location: 3.5 MILES WEST OF SR80 (Lat: 32.422928,  Lng: -85.535119),  Route carried "on" structure: County highway 22,  Year Built: 1961,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 325 (year 2015),  Truck Traffic: 20%,  Average Future Daily Traffic: 350 (year 2035),  Design Load: H 15,  Features Intersected: CHEWACLA CREEK REL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.37m (14.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $689,000,  Roadway Improvement Cost: $69,000,  Total Project Cost: $758,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 7372,  Location: 2.2 MI. W. OF SR8 (Lat: 32.422961,  Lng: -85.530297),  Route carried "on" structure: County highway 22,  Year Built: 1961,  Status: Posted for load,  Structure Length: 13.33m (43.73ft),  Average Daily Traffic: 325 (year 2016),  Truck Traffic: 20%,  Average Future Daily Traffic: 350 (year 2036),  Design Load: H 15,  Features Intersected: CHEWACLA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 21,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Poor,  Operating Rating: 9.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 6.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 14.15m (46.42ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $2,231,000,  Roadway Improvement Cost: $223,000,  Total Project Cost: $2,454,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 7373,  Location: 2.25 MI WEST HWY80W (Lat: 32.423033,  Lng: -85.513231),  Route carried "on" structure: County highway 22,  Year Built: 1961,  Status: Posted for load,  Structure Length: 2.31m (7.58ft),  Average Daily Traffic: 325 (year 2016),  Truck Traffic: 20%,  Average Future Daily Traffic: 350 (year 2036),  Design Load: H 15,  Features Intersected: UNNAMED BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 11.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.15m (10.33ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $453,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $498,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8042,  Location: NE1/4 S26 T16 R25 (Lat: 32.347028,  Lng: -85.504194),  Route carried "on" structure: County highway 79,  Year Built: 1963,  Status: Posted for load,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 108 (year 2016),  Truck Traffic: 15%,  Average Future Daily Traffic: 125 (year 2036),  Design Load: H 15,  Features Intersected: OPINTLOCCO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 9.29m (30.48ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,465,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $1,612,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8043,  Location: 4 MI WEST US80/SR8 (Lat: 32.383097,  Lng: -85.485692),  Route carried "on" structure: County highway 79,  Year Built: 1963,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 108 (year 2016),  Truck Traffic: 15%,  Average Future Daily Traffic: 125 (year 2036),  Design Load: H 15,  Features Intersected: KELLY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 56.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $385,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $424,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 8056,  Location: 2.8 MI W US80/SR8 (Lat: 32.411517,  Lng: -85.483206),  Route carried "on" structure: County highway 91,  Year Built: 1963,  Status: Open,  Structure Length: 5.21m (17.09ft),  Average Daily Traffic: 108 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 120 (year 2036),  Design Load: H 15,  Features Intersected: LONG BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 47.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.23m (20.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $983,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,081,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 8638,  Location: .5 MI NO OF AL-8/US80 (Lat: 32.435883,  Lng: -85.464175),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Closed,  Structure Length: 1.57m (5.15ft),  Average Daily Traffic: 52 (year 2016),  Average Future Daily Traffic: 100 (year 2036),  Design Load: H 10,  Features Intersected: LONG BRANCH,  Facility Carried by Structure: OLD COLUMBUS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Serious,  Channel: Fair,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: January 2019,  Other Special Inspection Date: January 2019,  Bridge Improvement Cost: $371,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $408,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 8693,  Location: SW1/4 S12 T15 R25 (Lat: 32.294397,  Lng: -85.501839),  Route carried "on" structure: County highway 10,  Year Built: 1965,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 310 (year 2016),  Truck Traffic: 45%,  Average Future Daily Traffic: 400 (year 2036),  Design Load: H 15,  Features Intersected: TANYARD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $259,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $285,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9679,  Location: .42 MILES NORTH CO RD 26 (Lat: 32.403772,  Lng: -85.524678),  Route carried "on" structure: County highway 24,  Year Built: 1968,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 268 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 300 (year 2035),  Design Load: H 15,  Features Intersected: LONG BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.63m (18.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $927,000,  Roadway Improvement Cost: $93,000,  Total Project Cost: $1,020,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 13966,  Location: 0.8 MI. EAST CO RD 53 (Lat: 32.522017,  Lng: -85.595833),  Route carried "on" structure: County highway 54,  Year Built: 1986,  Status: Open,  Structure Length: 1.57m (5.15ft),  Average Daily Traffic: 150 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 400 (year 2036),  Design Load: HS 20,  Features Intersected: HODNETT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.25m (7.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $546,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $601,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14247,  Location: 0.75 MI. SO I-85 (Lat: 32.507214,  Lng: -85.578514),  Route carried "on" structure: County highway 54,  Year Built: 1986,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 57 (year 2016),  Average Future Daily Traffic: 70 (year 2036),  Design Load: HS 20,  Features Intersected: CHOCTAFAULA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 87.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $652,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $717,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 14814,  Location: 1.31 MILES NORTH SR8/US80 (Lat: 32.470358,  Lng: -85.542183),  Route carried "on" structure: County highway ,  Year Built: 1989,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 52 (year 2015),  Average Future Daily Traffic: 75 (year 2035),  Design Load: HS 20,  Features Intersected: BIG BRANCH,  Facility Carried by Structure: BUFFORD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 66.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $444,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $488,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14815,  Location: 1.9 MI. SOUTH SR8/US80E (Lat: 32.445067,  Lng: -85.579764),  Route carried "on" structure: County highway ,  Year Built: 1989,  Status: Open,  Structure Length: 1.17m (3.84ft),  Average Daily Traffic: 62 (year 2015),  Average Future Daily Traffic: 70 (year 2035),  Design Load: HS 20,  Features Intersected: CAMP GROUND BRANCH,  Facility Carried by Structure: CO RD 71
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 58.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.85m (6.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $449,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $494,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 149,  Location: 0.9 MI NORTH SR8/US80 (Lat: 32.439050,  Lng: -85.450397),  Route carried "on" structure: County highway 43,  Year Built: 1989,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 289 (year 1990),  Truck Traffic: 15%,  Average Future Daily Traffic: 400 (year 2034),  Design Load: H 20,  Features Intersected: LONG BRANCH,  Facility Carried by Structure: CO RD 4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 69.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.23m (7.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $426,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $469,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Little Texas-Society Hill, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.