Bridge Statistics for Lloyd, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 512ft / 156mTotal length
  • $234,814,000Total costs
  • 216,148Total average daily traffic
  • 7,728Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Lloyd
  • No street view available for this location

New bridges in Lloyd, NY - historical statistics
  • New bridges - historical statistics
  • 41930-1939
  • 11950-1959
  • 31960-1969
  • 42000-2009
  • 52010-2019
Reconstructed bridges in Lloyd, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 21980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Lloyd, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 42.9%Very good
  • 14.3%Good
  • 14.3%Satisfactory
  • 28.6%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 27.3%Excellent
  • 27.3%Very good
  • 9.1%Good
  • 36.4%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 18.2%Very good
  • 36.4%Good
  • 27.3%Satisfactory
  • 18.2%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.0%Very good
  • 40.0%Good
  • 40.0%Satisfactory
Find on map >>   Show street view

Structure Number: 100731,  Location: 2.1 MI S JCT US9W & SH299 (Lat: 41.712453,  Lng: -73.964258),  Route carried "on" structure: US 9W,  Year Built: 1930,  Year Reconstructed: 1966,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 24,872 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 24,988 (year 2040),  Design Load: H 20,  Features Intersected: Hudson Valley Trail
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.529,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.8m (74.8ft),  Curb or Sidewalk Widths: Left: 3.3m (10.8ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 18.0m (59.1ft),  Out-to-Out Width: 24.2m (79.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 62.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.46m (8.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,074,000,  Roadway Improvement Cost: $1,214,000,  Total Project Cost: $3,288,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 100732,  Location: 1.5 MI S JCT RTS 9W+299 (Lat: 41.721047,  Lng: -73.960822),  Route carried "on" structure: US 9W,  Year Built: 2009,  Status: Open,  Structure Length: 10.76m (35.30ft),  Average Daily Traffic: 22,061 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 22,164 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: VINEYARD AVENUE, TWAALFS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.430,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Skew: 25 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 59.2m (194.2ft),  Curb-To-Curb Width: 19.2m (63.0ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Good,  Channel: Good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 10.75m (35.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $10,923,000,  Roadway Improvement Cost: $6,397,000,  Total Project Cost: $17,320,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100732A,  Location: 1.5 MI S JCT RTS 9W+299 (Lat: 41.719944,  Lng: -73.961347),  Route carried "on" structure: US 9,  Year Built: 2009,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 22,061 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 22,164 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: OTHER
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 15.414,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.3m (17.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.34m (7.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $382,000,  Roadway Improvement Cost: $224,000,  Total Project Cost: $606,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 104525,  Location: 1.1 MI W JCT RTS 299+9W (Lat: 41.745167,  Lng: -73.985022),  Route carried "on" structure: State highway 299,  Year Built: 1959,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 15,970 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 16,045 (year 2040),  Design Load: H 20,  Features Intersected: BLACK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.591,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 22 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 16.8m (55.1ft),  Out-to-Out Width: 17.6m (57.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 95.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 73.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,232,000,  Roadway Improvement Cost: $1,307,000,  Total Project Cost: $3,540,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 226423,  Location: AT HIGHLAND (Lat: 41.718542,  Lng: -73.954706),  Route carried "on" structure: Other road ,  Year Built: 2006,  Status: Open,  Structure Length: 0.82m (2.69ft),  Truck Traffic: 4%,  Design Load: HS 25 or greater,  Features Intersected: TWAALFSKILL CREEK,  Facility Carried by Structure: RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.724,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $591,000,  Roadway Improvement Cost: $346,000,  Total Project Cost: $937,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 227053,  Location: 0.12 MI NE JCT 9W & Havil (Lat: 41.711239,  Lng: -73.962869),  Route carried "on" structure: Other road ,  Year Built: 2010,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 348 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 487 (year 2039),  Design Load: HL 93,  Features Intersected: Hudson Valley Rail Trail,  Facility Carried by Structure: MILE HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 77.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 58.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $508,000,  Roadway Improvement Cost: $297,000,  Total Project Cost: $805,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 322427,  Location: 4.0 MI E OF NEW PALTZ (Lat: 41.736822,  Lng: -74.006200),  Route carried "on" structure: County highway ,  Year Built: 2011,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 3,267 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,042 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: Hudson Valley Rail Trail,  Facility Carried by Structure: County Road 12
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.901,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 4 degrees,  Material/Design: Aluminum, Iron,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.3m (30.5ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Superstructure: Very good,  Substructure: Very good,  Operating Rating: 79.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,166,000,  Roadway Improvement Cost: $1,269,000,  Total Project Cost: $3,435,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 322428,  Location: 1.3 MI E OF HIGHLAND VILL (Lat: 41.735206,  Lng: -73.980775),  Route carried "on" structure: County highway ,  Year Built: 2011,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 3,041 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,762 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: Hudson Valley Rail Trail,  Facility Carried by Structure: NEW PALTZ ROAD CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.298,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Aluminum, Iron,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.3m (30.5ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 30.5m (100.1ft)

Condition: Superstructure: Excellent,  Substructure: Good,  Operating Rating: 79.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,992,000,  Roadway Improvement Cost: $1,166,000,  Total Project Cost: $3,158,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 336522,  Location: 4 MI E OF NEW PALTZ (Lat: 41.733975,  Lng: -74.004594),  Route carried "on" structure: County highway ,  Year Built: 1963,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,524 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,134 (year 2040),  Features Intersected: BLACK CREEK,  Facility Carried by Structure: PANCAKE HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.891,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 52.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $362,000,  Roadway Improvement Cost: $212,000,  Total Project Cost: $574,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 337148,  Location: So of Rt 299 at Riverside (Lat: 41.736664,  Lng: -74.002139),  Route carried "on" structure: County highway ,  Year Built: 2018,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 626 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 876 (year 2040),  Design Load: HL 93,  Features Intersected: Hudson Valley Rail Trail,  Facility Carried by Structure: County Road 15
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Culverts: Excellent,  Operating Rating: 77.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $239,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $378,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 502553,  Location: JCT RTS 44-55 < HUDSON R (Lat: 41.703375,  Lng: -73.950567),  Route carried "on" structure: US 44,  Year Built: 1930,  Year Reconstructed: 1991,  Status: Posted for load,  Structure Length: 128.05m (420.11ft),  Average Daily Traffic: 34,647 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 48,876 (year 2040),  Features Intersected: AMTRAK, Gerald Drive, Ri
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Toll: Toll bridge,  Owner: State Toll Authority,  Approaching Roadway Width: 15.2m (49.9ft),  Navigation Control: Yes ( Vertical Clearance: 41.7m (136.8ft), Horizontal Clearance: 147.8m (484.9ft)),  Material/Design: Steel continuous,  Design/Construction: Suspension,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 26,  Length of Maximum Span: 455.6m (1,494.8ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 73.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 128.04m (420.08ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2020,  Critical Feature Inspection Date: June 2020,  Underwater Inspection Date: June 2017,  Bridge Improvement Cost: $124,185,000,  Roadway Improvement Cost: $72,723,000,  Total Project Cost: $196,908,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 505445,  Location: JCT RTS 44-55 < 9W (Lat: 41.707603,  Lng: -73.966403),  Route carried "on" structure: US 44,  Year Built: 1966,  Year Reconstructed: 2005,  Status: Posted for load,  Structure Length: 4.30m (14.11ft),  Average Daily Traffic: 33,126 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 46,730 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 9W
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.631,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Toll: Toll bridge,  Owner: State Toll Authority,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 41.4m (135.8ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.29m (14.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,438,000,  Roadway Improvement Cost: $1,427,000,  Total Project Cost: $3,865,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 100732,  Location: 1.5 MI S JCT RTS 9W+299 (Lat: 41.721047,  Lng: -73.960822),  Route carried "under" structure: Business City street ,  Year Built: 2009,  Structure Length: 0. m,  Features Intersected: VINEYARD AVENUE, TWAALFS,  Facility Carried by Structure: RTE 9W
Minimum Vertical Clearance: 4.74m (15.55ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 59.2m (194.2ft)

Find on map >>   Show street view

Structure Number: 227052,  Location: 2 MI NW JCT 9W & Haviland (Lat: 41.717231,  Lng: -73.968111),  Route carried "under" structure: State highway ,  Year Built: 2010,  Structure Length: 0. m,  Features Intersected: 44 86011273, TWAALFSKILL,  Facility Carried by Structure: RTE 44
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 11.746,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 502553,  Location: JCT RTS 44-55 < HUDSON R (Lat: 41.703375,  Lng: -73.950567),  Route carried "under" structure: US 9,  Year Built: 1930,  Structure Length: 0. m,  Average Daily Traffic: 30,382 (year 1999),  Features Intersected: AMTRAK, Gerald Drive, Ri,  Facility Carried by Structure: RTE 44
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 2.735,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Suspension,  Length of Maximum Span: 455.6m (1,494.8ft)

Find on map >>   Show street view

Structure Number: 502553,  Location: JCT RTS 44-55 < HUDSON R (Lat: 41.703375,  Lng: -73.950567),  Route carried "under" structure: ServiceCity street ,  Year Built: 1930,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2006),  Features Intersected: AMTRAK, Gerald Drive, Ri,  Facility Carried by Structure: RTE 44
Minimum Vertical Clearance: 3.71m (12.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Suspension,  Length of Maximum Span: 455.6m (1,494.8ft)

Find on map >>   Show street view

Structure Number: 505445,  Location: JCT RTS 44-55 < 9W (Lat: 41.707603,  Lng: -73.966403),  Route carried "under" structure: US 9W,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 23,723 (year 1999),  Features Intersected: RTE 9W,  Facility Carried by Structure: RTE 44
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 14.159,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.4m (135.8ft)

Discuss Lloyd, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.