Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Loganville, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 36ft / 11.5mTotal length
  • $5,925,000Total costs
  • 20,980Total average daily traffic
  • 204Total average daily truck traffic
  • 31,470Total future (year 2032) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Loganville
  • No street view available for this location

New bridges in Loganville, GA - historical statistics
  • New bridges - historical statistics
  • 21950-1959
  • 11980-1989
  • 51990-1999
  • 12000-2009
  • 12020-2022
Average Bridge Daily Traffic in Loganville, GA
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.0%Excellent
  • 40.0%Very good
  • 20.0%Good
  • 20.0%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Very good
  • 66.7%Good
Find on map >>   Show street view

Structure Number: 1355051,  Location: 4.1 MI SE OF SNELLVILLE (Lat: 33.832678,  Lng: -83.942239),  Route carried "on" structure: County highway 348,  Year Built: 1986,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 3,090 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,635 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BRUSHY FORK CREEK,  Facility Carried by Structure: LOGANVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 1355052,  Location: 5 MI SE OF SNELLVILLE (Lat: 33.821458,  Lng: -83.942478),  Route carried "on" structure: County highway 349,  Year Built: 1993,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,530 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,295 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BRUSHY FORK CREEK,  Facility Carried by Structure: BEAVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $133,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $199,000
Find on map >>   Show street view

Structure Number: 1355137,  Location: 6 MI SE OF GRAYSON (Lat: 33.876081,  Lng: -83.911431),  Route carried "on" structure: County highway 292,  Year Built: 1993,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 2,470 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,705 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BAY CREEK,  Facility Carried by Structure: BRISCO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $86,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $129,000
Find on map >>   Show street view

Structure Number: 1355205,  Location: 5.6 MILES EAST OF GRAYSON (Lat: 33.877058,  Lng: -83.881978),  Route carried "on" structure: County highway 290,  Year Built: 2007,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 1,050 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,575 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BAY CREEK,  Facility Carried by Structure: SHANNON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: November 2021,  Bridge Improvement Cost: $191,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $287,000
Find on map >>   Show street view

Structure Number: 2970021,  Location: 3.5 MI NE OF LOGANVILLE (Lat: 33.873958,  Lng: -83.860639),  Route carried "on" structure: State highway 81,  Year Built: 1950,  Year Reconstructed: 1976,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 8,880 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 13,320 (year 2032),  Design Load: H 15,  Features Intersected: BAY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.140,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $172,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $258,000
Find on map >>   Show street view

Structure Number: 2975018,  Location: 2.9 MI SE OF LOGANVILLE (Lat: 33.824608,  Lng: -83.858358),  Route carried "on" structure: County highway 79,  Year Built: 1991,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 1,090 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,635 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BIG FLAT CREEK,  Facility Carried by Structure: HODGES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $176,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $264,000
Find on map >>   Show street view

Structure Number: 2975019,  Location: 3.9 MI SE OF LOGANVILLE (Lat: 33.806878,  Lng: -83.850178),  Route carried "on" structure: County highway 83,  Year Built: 1991,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 660 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 990 (year 2032),  Design Load: HS 20,  Features Intersected: BIG FLAT CREEK,  Facility Carried by Structure: MARCE CAMP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $180,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $270,000
Find on map >>   Show street view

Structure Number: 2975022,  Location: 1.9 MI S OF LOGANVILLE (Lat: 33.812178,  Lng: -83.903578),  Route carried "on" structure: County highway 117,  Year Built: 1957,  Status: Posted for load,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 160 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 240 (year 2032),  Features Intersected: LITTLE HAYNES CREEK TRIB,  Facility Carried by Structure: CHANDLER HAULK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 16.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 162.46m (533.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $188,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $281,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2975088,  Location: 1.7 MI E OF LOGANVILLE (Lat: 33.848578,  Lng: -83.875219),  Route carried "on" structure: County highway 37,  Year Built: 1990,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 1,000 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,500 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BIG FLAT CREEK,  Facility Carried by Structure: BAY CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $152,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $229,000
Find on map >>   Show street view

Structure Number: 2975108,  Location: 2.5 MI E OF LOGANVILLE (Lat: 33.841889,  Lng: -83.865397),  Route carried "on" structure: County highway 34,  Year Built: 2021,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 1,050 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,575 (year 2032),  Features Intersected: BIG FLAT CREEK,  Facility Carried by Structure: OLD ZION CEM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Excellent,  Culverts: Good,  Operating Rating: 74.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,590,000,  Roadway Improvement Cost: $259,000,  Total Project Cost: $3,885,000 ( Estimate for 2021)
Discuss Loganville, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.