  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 49ft / 15.4mTotal length
  • $614,000Total costs
  • 7,826Total average daily traffic
  • 25Total average daily truck traffic
  • 8,602Total future (year 2039) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Lyndon
  • No street view available for this location

New bridges in Lyndon, WI - historical statistics
  • New bridges - historical statistics
  • 41920-1929
  • 21930-1939
  • 11950-1959
  • 21960-1969
  • 11970-1979
  • 11990-1999
  • 12000-2009
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Very good
  • 30.0%Good
  • 30.0%Fair
  • 20.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Very good
  • 20.0%Good
  • 10.0%Satisfactory
  • 40.0%Fair
  • 20.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.0%Very good
  • 20.0%Good
  • 30.0%Satisfactory
  • 30.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.3%Excellent
  • 41.7%Very good
  • 25.0%Good
  • 16.7%Satisfactory
  • 8.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: B59001,  Location: 0.7M S JCT CTH EE (Lat: 43.694558,  Lng: -87.777250),  Route carried "on" structure: County highway ,  Year Built: 1969,  Status: Open,  Structure Length: 1.08m (3.54ft),  Average Daily Traffic: 699 (year 2019),  Average Future Daily Traffic: 768 (year 2040),  Design Load: H 15,  Features Intersected: WEEDEN CREEK,  Facility Carried by Structure: CTH A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: B590017,  Location: 0.5M N JCT CTH U (Lat: 43.710189,  Lng: -87.990892),  Route carried "on" structure: County highway ,  Year Built: 1920,  Year Reconstructed: 1961,  Status: Open,  Structure Length: 1.30m (4.27ft),  Average Daily Traffic: 1,797 (year 2019),  Average Future Daily Traffic: 1,976 (year 2040),  Design Load: H 15,  Features Intersected: ONION RIVER,  Facility Carried by Structure: CTH E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.6m (41.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 27.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: B590163,  Location: 0.5M E JCT CTH E (Lat: 43.703814,  Lng: -87.981036),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 323 (year 2019),  Average Future Daily Traffic: 355 (year 2040),  Design Load: HS 20,  Features Intersected: ONION RIVER,  Facility Carried by Structure: CTH U
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 83.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B590182,  Location: 0.3M N JCT CTH N (Lat: 43.694044,  Lng: -87.960928),  Route carried "on" structure: City street ,  Year Built: 2006,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 637 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 700 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: ONION RIVER,  Facility Carried by Structure: LRD BLUEBERRY LA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 71.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P590074,  Location: 0.6M E JCT STH 57 (Lat: 43.674725,  Lng: -87.928364),  Route carried "on" structure: County highway ,  Year Built: 1925,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 1,497 (year 2019),  Average Future Daily Traffic: 1,646 (year 2040),  Features Intersected: ONION RIVER,  Facility Carried by Structure: CTH V
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $206,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $310,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: P590141,  Location: 0.8M W JCT STH 57 (Lat: 43.689128,  Lng: -87.956142),  Route carried "on" structure: County highway ,  Year Built: 1931,  Status: Open,  Structure Length: 1.17m (3.84ft),  Average Daily Traffic: 205 (year 2019),  Average Future Daily Traffic: 225 (year 2040),  Design Load: H 20,  Features Intersected: ONION RIVER,  Facility Carried by Structure: CTH N
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.2m (36.7ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: P590142,  Location: 0.8M E JCT STH 57 (Lat: 43.660189,  Lng: -87.924456),  Route carried "on" structure: City street ,  Year Built: 1966,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 47 (year 2019),  Average Future Daily Traffic: 51 (year 2039),  Design Load: H 15,  Features Intersected: ONION RIVER,  Facility Carried by Structure: LRD CLEARVIEW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.6m (41.3ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 26.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: P590904,  Location: 0.6M N JCT CTH W (Lat: 43.640158,  Lng: -88.017703),  Route carried "on" structure: City street ,  Year Built: 1957,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 205 (year 2019),  Average Future Daily Traffic: 225 (year 2039),  Design Load: H 15,  Features Intersected: N BR MILWAUKEE RIVER,  Facility Carried by Structure: LRD SILVERCREEK-CA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.1m (13.5ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: P590914,  Location: 4.5M S JCT CTH FF (Lat: 43.786611,  Lng: -87.728519),  Route carried "on" structure: County highway ,  Year Built: 1974,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 1,421 (year 2019),  Average Future Daily Traffic: 1,563 (year 2039),  Design Load: H 20,  Features Intersected: PIGEON RIVER,  Facility Carried by Structure: CTH LS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.7m (51.5ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 63.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: P590919,  Location: 0.1M S JCT CTH F (Lat: 43.645317,  Lng: -88.000267),  Route carried "on" structure: County highway ,  Year Built: 1922,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 205 (year 2019),  Average Future Daily Traffic: 225 (year 2040),  Features Intersected: BR N BR MILWAULEE RIVER,  Facility Carried by Structure: CTH NN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.9m (22.6ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 35.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.19m (3.90ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $91,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $136,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: P590921,  Location: 0.4M E JCT CTH OO (Lat: 43.638106,  Lng: -87.871100),  Route carried "on" structure: County highway ,  Year Built: 1929,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 585 (year 2019),  Average Future Daily Traffic: 643 (year 2040),  Features Intersected: BR ONION RIVER,  Facility Carried by Structure: CTH W
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.9m (22.6ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Good,  Channel: Very good,  Operating Rating: 29.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.19m (3.90ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $112,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $168,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: P590929,  Location: 0.1M N JCT CTH F TO E (Lat: 43.645583,  Lng: -88.000867),  Route carried "on" structure: County highway ,  Year Built: 1932,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 205 (year 2019),  Average Future Daily Traffic: 225 (year 2040),  Design Load: HS 20,  Features Intersected: N BR MILWAUKEE RIVER,  Facility Carried by Structure: CTH NN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.9m (22.6ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 35.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous