  • 19Number of bridges
  • 125ft / 38.3mTotal length
  • $16,457,000Total costs
  • 40,008Total average daily traffic
  • 3,077Total average daily truck traffic
  • 43,456Total future (year 2034) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Malone
  • No street view available for this location

New bridges in Malone, NY - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 21940-1949
  • 21950-1959
  • 21960-1969
  • 21970-1979
  • 11980-1989
  • 31990-1999
  • 32000-2009
  • 12010-2019
  • 12020-2022
Reconstructed bridges in Malone, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 21990-1999
  • 02000-2009
  • 22010-2019
Average Bridge Daily Traffic in Malone, NY
Average Bridge Truck Traffic in Malone, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.1%Excellent
  • 22.2%Very good
  • 22.2%Good
  • 27.8%Satisfactory
  • 16.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 27.8%Excellent
  • 22.2%Very good
  • 38.9%Good
  • 11.1%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Excellent
  • 44.4%Very good
  • 22.2%Good
  • 16.7%Satisfactory
  • 5.6%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.3%Excellent
  • 15.8%Very good
  • 42.1%Good
  • 26.3%Satisfactory
  • 5.3%Fair
  • 5.3%Poor
Find on map >>   Show street view

Structure Number: 100894,  Location: JCT US 11 & SALMON RIVER (Lat: 44.848747,  Lng: -74.293267),  Route carried "on" structure: US 11,  Year Built: 1947,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 21,740 (year 2011),  Truck Traffic: 7%,  Average Future Daily Traffic: 21,842 (year 2040),  Design Load: HS 20,  Features Intersected: SALMON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.208,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.9m (107.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,958,000,  Roadway Improvement Cost: $1,146,000,  Total Project Cost: $3,104,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100895,  Location: 2.5 MI NE OF MALONE (Lat: 44.871150,  Lng: -74.246856),  Route carried "on" structure: US 11,  Year Built: 1932,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 3,353 (year 2016),  Truck Traffic: 16%,  Average Future Daily Traffic: 3,384 (year 2040),  Design Load: H 20,  Features Intersected: TROUT RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.019,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Channel: Poor,  Culverts: Good,  Operating Rating: 72.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 31.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $203,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $322,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 102131,  Location: 8.2 MI S JCT RTS 30 + 11B (Lat: 44.786672,  Lng: -74.305342),  Route carried "on" structure: State highway 30,  Year Built: 1942,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 1,480 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,489 (year 2040),  Design Load: H 20,  Features Intersected: LAKE TITUS OUTLET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 95.092,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 40.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $329,000,  Roadway Improvement Cost: $192,000,  Total Project Cost: $521,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 225917,  Location: IN MEM REC PARK - MALONE (Lat: 44.838439,  Lng: -74.286375),  Route carried "on" structure: Other road ,  Year Built: 1972,  Status: Posted for load,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 33 (year 1999),  Truck Traffic: 10%,  Average Future Daily Traffic: 46 (year 2019),  Features Intersected: LAKE TITUS STREAM,  Facility Carried by Structure: PARK MAINT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 2.7m (8.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 3.4m (11.2ft),  Out-to-Out Width: 3.5m (11.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 18.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: High priority of replacement,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $213,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $338,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 33369,  Location: MALONE (Lat: 44.861089,  Lng: -74.295461),  Route carried "on" structure: Other road ,  Year Built: 1975,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 2.59m (8.50ft),  Truck Traffic: 10%,  Design Load: HL 93,  Features Intersected: SALMON RIVER,  Facility Carried by Structure: LANE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $915,000,  Roadway Improvement Cost: $536,000,  Total Project Cost: $1,451,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333691,  Location: 1.2MI N MALONE (Lat: 44.876619,  Lng: -74.303067),  Route carried "on" structure: County highway ,  Year Built: 2008,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 1,703 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,107 (year 2040),  Features Intersected: SALMON RIVER,  Facility Carried by Structure: BRAND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.993,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 50.0m (164.0ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Excellent,  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 5.18m (16.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,267,000,  Roadway Improvement Cost: $742,000,  Total Project Cost: $2,008,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333692,  Location: 1.4 MILES NE OF MALONE (Lat: 44.880619,  Lng: -74.261394),  Route carried "on" structure: Other road ,  Year Built: 1955,  Status: Posted for load,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 206 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 288 (year 2040),  Features Intersected: TROUT RIVER,  Facility Carried by Structure: HOUNDSVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.526,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $481,000,  Roadway Improvement Cost: $282,000,  Total Project Cost: $763,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333693,  Location: IN MALONE (Lat: 44.844372,  Lng: -74.288233),  Route carried "on" structure: Business Other road ,  Year Built: 1994,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 2,064 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,553 (year 2040),  Design Load: HS 20,  Features Intersected: LAKE TITUS STREAM,  Facility Carried by Structure: COLLEGE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.467,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $287,000,  Roadway Improvement Cost: $168,000,  Total Project Cost: $454,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333694,  Location: 2.6MI NE MALONE (Lat: 44.869914,  Lng: -74.223400),  Route carried "on" structure: Other road ,  Year Built: 1966,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 148 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 207 (year 2040),  Features Intersected: TROUT RIVER,  Facility Carried by Structure: DONOHUE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.837,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $397,000,  Roadway Improvement Cost: $233,000,  Total Project Cost: $630,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 333695,  Location: .1 MI E OF WHIPPLEVILLE (Lat: 44.809992,  Lng: -74.260253),  Route carried "on" structure: Other road ,  Year Built: 1964,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 896 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 934 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SALMON RIVER,  Facility Carried by Structure: RIVER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.6m (57.7ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $275,000,  Total Project Cost: $744,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333696,  Location: 2.1MI S WHIPPLEVILLE (Lat: 44.790811,  Lng: -74.247364),  Route carried "on" structure: Other road ,  Year Built: 1985,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 18 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 25 (year 2036),  Features Intersected: SALMON RIVER,  Facility Carried by Structure: KIMPTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.9m (12.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.46m (8.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $644,000,  Roadway Improvement Cost: $377,000,  Total Project Cost: $1,020,000 ( Estimate for 2021),  Deck Structure Type: Steel plate,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 3337,  Location: 3.6 MILES SOUTH OF MALONE (Lat: 44.779706,  Lng: -74.305875),  Route carried "on" structure: Other road ,  Year Built: 2020,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 218 (year 2014),  Truck Traffic: 7%,  Average Future Daily Traffic: 305 (year 2034),  Features Intersected: LAKE TITUS STREAM,  Facility Carried by Structure: TRAVERS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.687,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $271,000,  Roadway Improvement Cost: $159,000,  Total Project Cost: $430,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 333748,  Location: MALONE (Lat: 44.846692,  Lng: -74.282778),  Route carried "on" structure: Other road ,  Year Built: 2010,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 1,675 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,072 (year 2040),  Design Load: HL 93,  Features Intersected: SALMON RIVER,  Facility Carried by Structure: WILLOW STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.8m (61.7ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $492,000,  Roadway Improvement Cost: $288,000,  Total Project Cost: $780,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333749,  Location: MALONE (Lat: 44.844761,  Lng: -74.290053),  Route carried "on" structure: Other road ,  Year Built: 2003,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 1,492 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,846 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SALMON RIVER,  Facility Carried by Structure: PEARL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.451,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.5m (80.4ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 77.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $834,000,  Roadway Improvement Cost: $489,000,  Total Project Cost: $1,323,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333767,  Location: 3 MI E OF MALONE (Lat: 44.862383,  Lng: -74.214633),  Route carried "on" structure: Other road ,  Year Built: 1992,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 4 (year 2015),  Truck Traffic: 7%,  Average Future Daily Traffic: 6 (year 2035),  Design Load: HS 20,  Features Intersected: TROUT RIVER,  Facility Carried by Structure: PANNUZIO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.3m (17.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 75.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.85m (6.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $142,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $226,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333806,  Location: 2.4 MI NE OF MALONE (Lat: 44.871486,  Lng: -74.232967),  Route carried "on" structure: County highway ,  Year Built: 1959,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 957 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,340 (year 2035),  Features Intersected: TROUT RIVER,  Facility Carried by Structure: CR23,MaloneChatea
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.593,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $525,000,  Roadway Improvement Cost: $308,000,  Total Project Cost: $833,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333807,  Location: .1 MI S OF MALONE (Lat: 44.831553,  Lng: -74.280953),  Route carried "on" structure: County highway ,  Year Built: 1939,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 1,729 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,803 (year 2040),  Design Load: HS 20,  Features Intersected: LAKE TITUS STREAM,  Facility Carried by Structure: CR 25, DUANE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.472,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $213,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $337,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333808,  Location: 1.9 MI SE WHIPPLEVILLE (Lat: 44.784944,  Lng: -74.241772),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 1,093 (year 2016),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,530 (year 2036),  Design Load: HS 20,  Features Intersected: SALMON RIVER,  Facility Carried by Structure: COUNTY ROAD 25
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.310,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $485,000,  Roadway Improvement Cost: $284,000,  Total Project Cost: $769,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 336669,  Location: 2.5 MI NE MALONE ON CR 23 (Lat: 44.874950,  Lng: -74.229731),  Route carried "on" structure: County highway ,  Year Built: 2000,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 1,199 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,679 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: COLLINS BROOK,  Facility Carried by Structure: CR 23, MALONE-CHA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.060,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $255,000,  Roadway Improvement Cost: $149,000,  Total Project Cost: $404,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing