Bridge Statistics for Malvern, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 24Number of bridges
  • 200ft / 60.6mTotal length
  • $20,080,000Total costs
  • 25,759Total average daily traffic
  • 1,631Total average daily truck traffic
  • 37,674Total future (year 2030) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Malvern
  • No street view available for this location

New bridges in Malvern, AL - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 31930-1939
  • 11940-1949
  • 31950-1959
  • 41960-1969
  • 11970-1979
  • 41980-1989
  • 51990-1999
  • 12010-2019
Reconstructed bridges in Malvern, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 11980-1989
Average Bridge Daily Traffic in Malvern, AL
Average Bridge Truck Traffic in Malvern, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.7%Very good
  • 38.5%Good
  • 46.2%Satisfactory
  • 7.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.7%Very good
  • 53.8%Good
  • 30.8%Satisfactory
  • 7.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.7%Very good
  • 38.5%Good
  • 30.8%Satisfactory
  • 15.4%Fair
  • 7.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.5%Very good
  • 33.3%Good
  • 25.0%Satisfactory
  • 25.0%Fair
  • 4.2%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 9.1%Very good
  • 18.2%Good
  • 36.4%Satisfactory
  • 36.4%Fair
Find on map >>   Show street view

Structure Number: 187,  Location: 4.7 MI N JCT US72 * SR65 (Lat: 34.730897,  Lng: -86.289242),  Route carried "on" structure: State highway 65,  Year Built: 1922,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 934 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,308 (year 2040),  Design Load: H 10,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.508,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $271,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $298,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1868,  Location: 0.4 MI N JCT FAS RT 45 03 (Lat: 34.814294,  Lng: -86.758131),  Route carried "on" structure: County highway 337,  Year Built: 1938,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 220 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 325 (year 2040),  Design Load: H 15,  Features Intersected: SMITH BRANCH,  Facility Carried by Structure: ORVILLE SMITH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $175,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $193,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1872,  Location: 1 MI E JCT CO RD 375 (Lat: 34.492097,  Lng: -86.483458),  Route carried "on" structure: County highway 376,  Year Built: 1938,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 75 (year 1992),  Average Future Daily Traffic: 90 (year 2040),  Design Load: H 15,  Features Intersected: TURNER BRANCH,  Facility Carried by Structure: C C IVEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $175,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $193,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1873,  Location: 2.2 MI NE HURRICANECHAPEL (Lat: 34.810061,  Lng: -86.366136),  Route carried "on" structure: County highway 415,  Year Built: 1938,  Status: Posted for load,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 60 (year 1992),  Average Future Daily Traffic: 80 (year 2034),  Design Load: H 15,  Features Intersected: MOLDER BRANCH,  Facility Carried by Structure: BOB STILES RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Poor,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $197,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $217,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2777,  Location: 3 MILES S.W.OF MALVERN (Lat: 31.096625,  Lng: -85.501511),  Route carried "on" structure: County highway ,  Year Built: 1944,  Year Reconstructed: 1992,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 50 (year 2020),  Average Future Daily Traffic: 135 (year 2040),  Features Intersected: CHESTNUT BRANCH,  Facility Carried by Structure: CHIPOLA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 27.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $176,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $194,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 3574,  Location: 4 MI. NE OF SLOCOMB (Lat: 31.161094,  Lng: -85.552389),  Route carried "on" structure: County highway 73,  Year Built: 1958,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 130 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 178 (year 2041),  Design Load: H 15,  Features Intersected: BEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.63m (5.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $282,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $310,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 3975,  Location: 3 MI NW OF MALVERN (Lat: 31.174878,  Lng: -85.536697),  Route carried "on" structure: County highway 49,  Year Built: 1951,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 305 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 370 (year 2041),  Design Load: H 15,  Features Intersected: SASSER BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 50.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.63m (5.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $282,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $310,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 5027,  Location: 2 MI. SE OF MALVERN (Lat: 31.116969,  Lng: -85.486144),  Route carried "on" structure: County highway 93,  Year Built: 1955,  Status: Open,  Structure Length: 1.14m (3.74ft),  Average Daily Traffic: 207 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 588 (year 2041),  Design Load: H 15,  Features Intersected: BIG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 63.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $543,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $597,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7277,  Location: 6 MI. NE OF SLOCOMB (Lat: 31.190581,  Lng: -85.544650),  Route carried "on" structure: County highway 68,  Year Built: 1961,  Status: Posted for load,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 282 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 392 (year 2040),  Design Load: H 15,  Features Intersected: BEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 35.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $807,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $888,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 751,  Location: 0.5 M N OF CO RD 404 (Lat: 32.965150,  Lng: -85.647856),  Route carried "on" structure: County highway 532,  Year Built: 1961,  Status: Posted for load,  Structure Length: 24.57m (80.61ft),  Average Daily Traffic: 235 (year 2008),  Truck Traffic: 7%,  Average Future Daily Traffic: 365 (year 2030),  Features Intersected: TALLAPOOSA RIVER,  Facility Carried by Structure: GERMANYS FERRY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 10,  Length of Maximum Span: 141.4m (463.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 24.57m (80.61ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Underwater Inspection Date: September 2019,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $4,717,000,  Roadway Improvement Cost: $472,000,  Total Project Cost: $5,189,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8826,  Location: 1 MILE NE MALVERN (Lat: 31.157497,  Lng: -85.506939),  Route carried "on" structure: County highway 70,  Year Built: 1965,  Status: Open,  Structure Length: 1.91m (6.27ft),  Average Daily Traffic: 220 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 330 (year 2041),  Design Load: H 15,  Features Intersected: NEWTON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.64m (8.66ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $580,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $638,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11029,  Location: 2.5 MI. EAST OF SLOCOMB (Lat: 31.135033,  Lng: -85.558517),  Route carried "on" structure: State highway 52,  Year Built: 1927,  Year Reconstructed: 1974,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 6,260 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 9,086 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 82.122,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 64.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $427,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $470,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12891,  Location: 4 MILES SE OF SLOCOMB (Lat: 31.076081,  Lng: -85.535678),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 60 (year 2021),  Average Future Daily Traffic: 118 (year 2041),  Design Load: H 15,  Features Intersected: WRIGHTS CREEK,  Facility Carried by Structure: OLD CHIPLEY RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $507,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $558,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 12937,  Location: 5 MILES NE OF SLOCOMB (Lat: 31.165242,  Lng: -85.553928),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 60 (year 2021),  Average Future Daily Traffic: 88 (year 2041),  Design Load: H 15,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: VINSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 45.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $706,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $777,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 13961,  Location: .5 MI.W.GENEVA 93 (Lat: 31.147483,  Lng: -85.509317),  Route carried "on" structure: State highway 52,  Year Built: 1986,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 6,920 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 10,043 (year 2033),  Design Load: HS 20,  Features Intersected: NEWTON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 87.230,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 26.7m (87.6ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 61.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.47m (8.10ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Underwater Inspection Date: January 2021,  Bridge Improvement Cost: $2,741,000,  Roadway Improvement Cost: $274,000,  Total Project Cost: $3,015,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1408,  Location: 4 MI S OF MALVERN (Lat: 31.091231,  Lng: -85.493228),  Route carried "on" structure: County highway ,  Year Built: 1987,  Status: Posted for load,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 61 (year 2020),  Average Future Daily Traffic: 88 (year 2040),  Design Load: H 15,  Features Intersected: CHESTNUT BRANCH,  Facility Carried by Structure: CHESTNUT RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 5.6m (18.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 15.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 11.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.02m (6.63ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $249,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $274,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 15079,  Location: GENEVA CO LINE TO CO RD 4 (Lat: 31.197897,  Lng: -85.532194),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 75 (year 1990),  Average Future Daily Traffic: 145 (year 2033),  Design Load: H 10,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: FORTSON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 47.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $303,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $333,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 16264,  Location: 1.0 MI NE OF SOLCOMB (Lat: 31.171056,  Lng: -85.501878),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Posted for load,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 50 (year 2020),  Average Future Daily Traffic: 120 (year 2040),  Design Load: H 15,  Features Intersected: UT NEWTON CREEK,  Facility Carried by Structure: NEWTON CREEK RD.
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.999,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $191,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $210,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 16504,  Location: CO RD 49 TO PILGRAM REST (Lat: 31.207764,  Lng: -85.546267),  Route carried "on" structure: Business County highway 40,  Year Built: 1995,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 700 (year 1995),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,000 (year 2033),  Design Load: H 20,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: FORTNER ST EXT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.014,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $1,018,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,120,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17268,  Location: US 84 TO GENEVA CO (Lat: 31.206833,  Lng: -85.580600),  Route carried "on" structure: County highway 68,  Year Built: 1998,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 370 (year 1999),  Truck Traffic: 2%,  Average Future Daily Traffic: 540 (year 2033),  Design Load: HS 20,  Features Intersected: PANTHER CREEK,  Facility Carried by Structure: CUMBIE RD
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: December 2021,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 17362,  Location: 4 MILES NW. OF MALVERN (Lat: 31.162372,  Lng: -85.561736),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Posted for load,  Structure Length: 1.57m (5.15ft),  Average Daily Traffic: 100 (year 2020),  Average Future Daily Traffic: 130 (year 2040),  Design Load: HS 20,  Features Intersected: BUZZARD BAY,  Facility Carried by Structure: HUNDLEY RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.4m (17.7ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 33.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 2.25m (7.38ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $247,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $272,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 17404,  Location: 4 MILES NORTH OF SLOCOMB (Lat: 31.193433,  Lng: -85.583489),  Route carried "on" structure: County highway 62,  Year Built: 1974,  Status: Open,  Structure Length: 0.83m (2.72ft),  Average Daily Traffic: 100 (year 2021),  Average Future Daily Traffic: 150 (year 2041),  Design Load: HS 20,  Features Intersected: PANTHER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $344,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $378,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17837,  Location: 1.5 MILES S.W. OF MALVERN (Lat: 31.104117,  Lng: -85.546339),  Route carried "on" structure: County highway 30,  Year Built: 1966,  Status: Open,  Structure Length: 0.72m (2.36ft),  Average Daily Traffic: 525 (year 2021),  Average Future Daily Traffic: 742 (year 2041),  Design Load: HS 20,  Features Intersected: TINDALL BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 63.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.36m (4.46ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $314,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $345,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1886,  Location: 1 MILE EAST MALVERN (Lat: 31.153500,  Lng: -85.499733),  Route carried "on" structure: State highway 52,  Year Built: 2012,  Status: Open,  Structure Length: 1.33m (4.36ft),  Average Daily Traffic: 7,760 (year 2013),  Truck Traffic: 3%,  Average Future Daily Traffic: 11,263 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 88.419,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 26.5m (86.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 65.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,185,000,  Roadway Improvement Cost: $219,000,  Total Project Cost: $2,404,000 ( Estimate for 2022)