Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Marbletown, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 128ft / 38.7mTotal length
  • $38,145,000Total costs
  • 18,117Total average daily traffic
  • 1,152Total average daily truck traffic
  • 20,572Total future (year 2037) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Marbletown
  • No street view available for this location

New bridges in Marbletown, NY - historical statistics
  • New bridges - historical statistics
  • 21910-1919
  • 11920-1929
  • 11930-1939
  • 11940-1949
  • 11950-1959
  • 11960-1969
  • 11980-1989
  • 11990-1999
  • 12000-2009
  • 12010-2019
Reconstructed bridges in Marbletown, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 11990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Marbletown, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.1%Excellent
  • 11.1%Very good
  • 22.2%Good
  • 11.1%Satisfactory
  • 22.2%Fair
  • 22.2%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Excellent
  • 11.1%Very good
  • 11.1%Good
  • 11.1%Satisfactory
  • 33.3%Fair
  • 22.2%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Excellent
  • 33.3%Good
  • 22.2%Satisfactory
  • 33.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 18.2%Excellent
  • 9.1%Very good
  • 18.2%Good
  • 36.4%Satisfactory
  • 18.2%Poor
Find on map >>   Show street view

Structure Number: 104077,  Location: 8.9 MI N JCT RTS 209+44 (Lat: 41.830275,  Lng: -74.178928),  Route carried "on" structure: US 209,  Year Built: 1963,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 8,304 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,382 (year 2040),  Design Load: HS 20,  Features Intersected: KRIPPLEBUSH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.778,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.6m (11.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $999,000,  Roadway Improvement Cost: $585,000,  Total Project Cost: $1,585,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 104115,  Location: 3.2 MI E JCT RTS 213+209 (Lat: 41.828731,  Lng: -74.133483),  Route carried "on" structure: State highway 213,  Year Built: 2017,  Status: Open,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 4,339 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,526 (year 2040),  Design Load: HL 93,  Features Intersected: RONDOUT CREEK
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 17.297,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 68.3m (224.1ft),  Curb or Sidewalk Widths: Left: 3.2m (10.5ft),  Right: 0.0m,  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.01m (23.00ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2021,  Underwater Inspection Date: August 2018,  Bridge Improvement Cost: $4,034,000,  Roadway Improvement Cost: $2,362,000,  Total Project Cost: $6,396,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 202044,  Location: .4MI N RTE28A AT SPILLWAY (Lat: 41.943453,  Lng: -74.169678),  Route carried "on" structure: Other road 28A,  Year Built: 1912,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 8.41m (27.59ft),  Average Daily Traffic: 485 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 679 (year 2036),  Design Load: HS 20,  Features Intersected: ASHOKAN SPILLWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.308,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: Local Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 8,  Length of Maximum Span: 53.3m (174.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.41m (27.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $5,798,000,  Roadway Improvement Cost: $3,395,000,  Total Project Cost: $9,193,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 22243,  Location: 0.9 MI SE OF KRIPPLEBUSH (Lat: 41.830964,  Lng: -74.179172),  Route carried "on" structure: Other road ,  Year Built: 1927,  Status: Open,  Structure Length: 0.85m (2.79ft),  Truck Traffic: 1%,  Features Intersected: KRIPPLEBUSH CREEK,  Facility Carried by Structure: OLD ROUTE 209
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Poor,  Operating Rating: 47.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $429,000,  Roadway Improvement Cost: $251,000,  Total Project Cost: $680,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 222432,  Location: 2.5 MI E JCT SH 28A & SH2 (Lat: 41.932631,  Lng: -74.169833),  Route carried "on" structure: Other road ,  Year Built: 1911,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 6.16m (20.21ft),  Average Daily Traffic: 176 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 246 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: SPILLWAY CHANNEL,  Facility Carried by Structure: Stone Church Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 53.3m (174.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Excellent,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 6.15m (20.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $5,101,000,  Roadway Improvement Cost: $2,987,000,  Total Project Cost: $8,088,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334639,  Location: 2 MILES EAST OF ATWOOD (Lat: 41.887531,  Lng: -74.123375),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 974 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,364 (year 2039),  Design Load: HS 20,  Features Intersected: STONY CREEK,  Facility Carried by Structure: HURLEY MOUNTAIN RO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.395,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.6m (11.8ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 74.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $261,000,  Roadway Improvement Cost: $153,000,  Total Project Cost: $413,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33466,  Location: 2.6 MI SW OF STONE RIDGE (Lat: 41.824947,  Lng: -74.169106),  Route carried "on" structure: Other road ,  Year Built: 1990,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 554 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 776 (year 2037),  Design Load: HS 20,  Features Intersected: KRIPPLEBUSH CREEK,  Facility Carried by Structure: KINGS HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.724,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.3m (56.8ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.76m (5.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $680,000,  Roadway Improvement Cost: $398,000,  Total Project Cost: $1,078,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334726,  Location: 1.2 MI SE OF ATWOOD (Lat: 41.879064,  Lng: -74.144803),  Route carried "on" structure: County highway ,  Year Built: 1958,  Status: Open,  Structure Length: 8.23m (27.00ft),  Average Daily Traffic: 974 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,364 (year 2039),  Design Load: H 20,  Features Intersected: ESOPUS CREEK,  Facility Carried by Structure: HURLEY MOUNTAIN RO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.239,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 40.2m (131.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 8.22m (26.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $4,314,000,  Roadway Improvement Cost: $2,527,000,  Total Project Cost: $6,841,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33473,  Location: 1.5 MI NW OF KRIPPLEBUSH (Lat: 41.847742,  Lng: -74.218961),  Route carried "on" structure: Other road ,  Year Built: 1938,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 361 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 505 (year 2039),  Design Load: HS 20,  Features Intersected: NORTH PETERS KILL,  Facility Carried by Structure: BONE HOLLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.441,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.7m (25.3ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $730,000,  Roadway Improvement Cost: $427,000,  Total Project Cost: $1,157,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334741,  Location: 1.2 MI S OF HIGH FALLS (Lat: 41.810489,  Lng: -74.132967),  Route carried "on" structure: County highway ,  Year Built: 1941,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 765 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,071 (year 2038),  Design Load: HS 20,  Features Intersected: COXING KILL,  Facility Carried by Structure: CO RD 6A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.134,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.8m (61.7ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $976,000,  Roadway Improvement Cost: $572,000,  Total Project Cost: $1,547,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 336521,  Location: 1.4 MI E OF ALLIGERVILLE (Lat: 41.791850,  Lng: -74.153039),  Route carried "on" structure: County highway ,  Year Built: 2006,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 1,185 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,659 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: COXING KILL,  Facility Carried by Structure: COUNTY ROAD 6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.253,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Poor,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $736,000,  Roadway Improvement Cost: $431,000,  Total Project Cost: $1,167,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Discuss Marbletown, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.