Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Marfa, Texas (TX)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 108ft / 32.5mTotal length
  • $249,000Total costs
  • 22,456Total average daily traffic
  • 3,675Total average daily truck traffic
  • 28,910Total future (year 2033) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Marfa
  • No street view available for this location

New bridges in Marfa, TX - historical statistics
  • New bridges - historical statistics
  • 121930-1939
  • 11950-1959
  • 11990-1999
Reconstructed bridges in Marfa, TX - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31950-1959
  • 31960-1969
  • 41970-1979
  • 11980-1989
Average Bridge Daily Traffic in Marfa, TX
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 66.7%Good
  • 33.3%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Very good
  • 33.3%Good
  • 33.3%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 33.3%Good
  • 66.7%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 42.9%Good
  • 57.1%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 27.3%Good
  • 72.7%Satisfactory
Find on map >>   Show street view

Structure Number: 24189000200601,  Location: 0.6 MI SE OF JEFF DAV C/L (Lat: 30.507714,  Lng: -104.397192),  Route carried "on" structure: US 90,  Year Built: 1933,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 576 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,160 (year 2033),  Design Load: H 15,  Features Intersected: DRAW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.012,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 1.8m (5.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 26.6m (87.3ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $28,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $35,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 241890002007139,  Location: 4.00 MI W OF US 67 (Lat: 30.319053,  Lng: -104.083081),  Route carried "on" structure: US 90,  Year Built: 1937,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 679 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,090 (year 2033),  Design Load: H 15,  Features Intersected: DRAW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.672,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 1.5m (4.9ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 26.6m (87.3ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.19m (3.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $34,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $43,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 24189000200714,  Location: 2.45 MI W OF US 67 (Lat: 30.310592,  Lng: -104.059372),  Route carried "on" structure: US 90,  Year Built: 1937,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 679 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,090 (year 2033),  Design Load: H 15,  Features Intersected: DRAW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.134,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 26.6m (87.3ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $19,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $24,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 241890002007141,  Location: 2.05 MI W OF US 67 (Lat: 30.308319,  Lng: -104.053014),  Route carried "on" structure: US 90,  Year Built: 1937,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 679 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,090 (year 2033),  Design Load: H 15,  Features Intersected: DRAW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.797,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 1.8m (5.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 26.6m (87.3ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 241890002007142,  Location: 0.75 MI W OF US 67 (Lat: 30.306319,  Lng: -104.032714),  Route carried "on" structure: US 90,  Year Built: 1937,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,162 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,580 (year 2033),  Design Load: H 15,  Features Intersected: DRAW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.852,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 1.5m (4.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.5m (57.4ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 241890002007143,  Location: 0.30 MI W OF US 67 (Lat: 30.308153,  Lng: -104.025119),  Route carried "on" structure: US 90,  Year Built: 1937,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 3,614 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 6,310 (year 2033),  Design Load: H 15,  Features Intersected: MIMMS DRAW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.604,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 1.8m (5.9ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.19m (3.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $39,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $49,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 241890002008027,  Location: 0.90 MI E OF SH 17 (Lat: 30.310381,  Lng: -104.006192),  Route carried "on" structure: US 67,  Year Built: 1932,  Year Reconstructed: 1955,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 2,623 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 2,780 (year 2033),  Design Load: H 15,  Features Intersected: GREENLEE DRAW RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 85.636,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 14,  Length of Maximum Span: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 241890002008028,  Location: 0.95 MI E OF SH 17 (Lat: 30.309914,  Lng: -104.004983),  Route carried "on" structure: US 67,  Year Built: 1932,  Year Reconstructed: 1955,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 2,623 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 2,780 (year 2033),  Design Load: H 15,  Features Intersected: GREENLEE DRAW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 85.501,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 14,  Length of Maximum Span: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.38m (7.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $71,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $89,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 241890002008046,  Location: 0.30 MI E OF SH 17 (Lat: 30.310867,  Lng: -104.015178),  Route carried "on" structure: US 67,  Year Built: 1932,  Year Reconstructed: 1959,  Status: Open,  Structure Length: 5.21m (17.09ft),  Average Daily Traffic: 2,623 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 2,780 (year 2033),  Design Load: H 20,  Features Intersected: ALAMITO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 86.522,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 241890010405068,  Location: 2.30 MI N OF US 90 (Lat: 30.342189,  Lng: -104.018003),  Route carried "on" structure: State highway 17,  Year Built: 1995,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 928 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,510 (year 2033),  Design Load: HS 20,  Features Intersected: ALAMITO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.107,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 241890010406012,  Location: 1.20 MI S OF US 90 (Lat: 30.291883,  Lng: -104.024008),  Route carried "on" structure: US 67,  Year Built: 1932,  Year Reconstructed: 1967,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 1,662 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,610 (year 2033),  Design Load: H 15,  Features Intersected: MIMMS DRAW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.611,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 1.8m (5.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 241890010406013,  Location: 2.80 MI S OF US 90 (Lat: 30.273939,  Lng: -104.037411),  Route carried "on" structure: US 67,  Year Built: 1932,  Year Reconstructed: 1967,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 1,662 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,610 (year 2033),  Design Load: H 15,  Features Intersected: MITCHELL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.209,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 1.5m (4.9ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 241890010406014,  Location: 4.60 MI S OF US 90 (Lat: 30.249378,  Lng: -104.050650),  Route carried "on" structure: US 67,  Year Built: 1932,  Year Reconstructed: 1967,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 1,662 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,610 (year 2033),  Design Load: H 15,  Features Intersected: FOUR MILE DRAW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.027,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 241890128301001,  Location: 0.40 MI E OF SH 17 (Lat: 30.312847,  Lng: -104.014897),  Route carried "on" structure: State highway 1112,  Year Built: 1950,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 1,284 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,910 (year 2033),  Design Load: H 15,  Features Intersected: ALAMITO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.634,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $7,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $9,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Marfa, Texas (TX) on our hugely popular Texas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.