Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Marshall, Virginia (VA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 25Number of bridges
  • 184ft / 55.9mTotal length
  • $369,000Total costs
  • 315,219Total average daily traffic
  • 18,377Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Marshall
  • No street view available for this location

New bridges in Marshall, VA - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 31930-1939
  • 11950-1959
  • 71960-1969
  • 111970-1979
  • 21980-1989
Reconstructed bridges in Marshall, VA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 11980-1989
  • 21990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Marshall, VA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 15.4%Very good
  • 23.1%Good
  • 38.5%Satisfactory
  • 23.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.7%Very good
  • 23.1%Good
  • 46.2%Satisfactory
  • 23.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 30.8%Good
  • 38.5%Satisfactory
  • 30.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.3%Good
  • 58.3%Satisfactory
  • 33.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 40.0%Good
  • 40.0%Satisfactory
  • 20.0%Fair
Find on map >>   Show street view

Structure Number: 7104,  Location: .40 Fr 723 & 1.08 To 713 (Lat: 38.885344,  Lng: -77.905731),  Route carried "on" structure: ServiceCounty highway F-185,  Year Built: 1925,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 2,129 (year 2015),  Average Future Daily Traffic: 2,395 (year 2040),  Design Load: HS 20,  Features Intersected: Bolling Branch,  Facility Carried by Structure: Grove Lane
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.689,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Underwater Inspection Date: September 2017,  Bridge Improvement Cost: $35,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $50,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7141,  Location: .14 Fr 698 & .87 To 699N (Lat: 38.806956,  Lng: -77.812936),  Route carried "on" structure: US 17,  Year Built: 1938,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 8,456 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 11,838 (year 2040),  Design Load: HS 20,  Features Intersected: Broad Run,  Facility Carried by Structure: James Madison Hwy
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 359.026,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7151,  Location: 1.3 FR 55 & 2.32 TO 245 (Lat: 38.857903,  Lng: -77.843200),  Route carried "on" structure: US 17,  Year Built: 1978,  Status: Open,  Structure Length: 13.32m (43.70ft),  Average Daily Traffic: 19,331 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 17,500 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: RTE 66,  Facility Carried by Structure: WINCHESTER RD.
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 365.513,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 24 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 37.5m (123.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 26.8m (87.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 7155,  Location: .28 Fr 713 &.18 To 66_EBL (Lat: 38.895664,  Lng: -77.912811),  Route carried "on" structure: Ramp Interstate 17,  Year Built: 1960,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 4,316 (year 2020),  Average Future Daily Traffic: 6,042 (year 2040),  Design Load: HS 20,  Features Intersected: I-66 WBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 1,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.85m (19.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $40,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $50,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7165,  Location: .14 Fr 698 & .87 To 699N (Lat: 38.807139,  Lng: -77.812683),  Route carried "on" structure: US 17,  Year Built: 1987,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 8,456 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 11,838 (year 2040),  Design Load: HS 20,  Features Intersected: Broad Run,  Facility Carried by Structure: James Madison Hwy
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 359.019,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 7195,  Location: .82 Fr 17 & 1.62 To 723 (Lat: 38.884756,  Lng: -77.906206),  Route carried "on" structure: ServiceInterstate 66,  Year Built: 1959,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 43,794 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 61,312 (year 2040),  Design Load: HS 20,  Features Intersected: Bolling Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.597,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.9m (75.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: 7198,  Location: 2.36 Fr 17N & 2.67 To 17S (Lat: 38.869111,  Lng: -77.889308),  Route carried "on" structure: Interstate 66,  Year Built: 1978,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 21,799 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 30,519 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Route 732
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.834,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.21m (13.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $40,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $50,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7243,  Location: 1.94 Fr 17 & 1.09 To 245 (Lat: 38.856450,  Lng: -77.807917),  Route carried "on" structure: Interstate 66,  Year Built: 1979,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 36,302 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 50,823 (year 2040),  Design Load: HS 20,  Features Intersected: Stream
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.573,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020
Find on map >>   Show street view

Structure Number: 7292,  Location: .10 Fr 713 & 1.50 To End (Lat: 38.915725,  Lng: -77.867908),  Route carried "on" structure: County highway 624,  Year Built: 1986,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 116 (year 2015),  Average Future Daily Traffic: 164 (year 2040),  Design Load: HS 20,  Features Intersected: Branch Goose Creek,  Facility Carried by Structure: Lost Corner Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.405,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 7384,  Location: 4.60 Fr 630 & 1.60 To 719 (Lat: 38.814794,  Lng: -77.862314),  Route carried "on" structure: County highway 691,  Year Built: 1968,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 390 (year 2015),  Average Future Daily Traffic: 553 (year 2040),  Design Load: HS 20,  Features Intersected: Carters Run,  Facility Carried by Structure: Carters Run Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.446,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: 7391,  Location: 1.00 Fr 709 & .20 To 715 (Lat: 38.915883,  Lng: -77.801811),  Route carried "on" structure: County highway 708,  Year Built: 1960,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 101 (year 2015),  Average Future Daily Traffic: 152 (year 2040),  Design Load: HS 20,  Features Intersected: Branch Cromwells Creek,  Facility Carried by Structure: Young Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.442,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $4,000 ( Estimate for 2015),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7392,  Location: .63 Fr 55 & .47 To 750 (Lat: 38.857372,  Lng: -77.820506),  Route carried "on" structure: County highway 709,  Year Built: 1979,  Status: Open,  Structure Length: 8.20m (26.90ft),  Average Daily Traffic: 2,320 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,108 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: I-66,  Facility Carried by Structure: Belvoir Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 7404,  Location: 1.40 Fr 624 & 1.50 To 17 (Lat: 38.913553,  Lng: -77.890881),  Route carried "on" structure: County highway 713,  Year Built: 1938,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 475 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 665 (year 2040),  Design Load: HS 20,  Features Intersected: Bolling Branch,  Facility Carried by Structure: Maidstone Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.690,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7407,  Location: 1.40 Fr 708 & 1.0 To 713 (Lat: 38.930931,  Lng: -77.809794),  Route carried "on" structure: County highway 715,  Year Built: 1974,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 40 (year 2015),  Average Future Daily Traffic: 45 (year 2040),  Design Load: HL 93,  Features Intersected: Cromwells Run,  Facility Carried by Structure: Old CartersMill Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.532,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.8m (25.6ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $40,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $45,000 ( Estimate for 2015),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7408,  Location: 0.20 Fr 55 & 0.12 To 647 (Lat: 38.858811,  Lng: -77.867772),  Route carried "on" structure: County highway 721,  Year Built: 1978,  Status: Open,  Structure Length: 7.13m (23.39ft),  Average Daily Traffic: 21,719 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 36,922 (year 2040),  Design Load: HS 20,  Features Intersected: I-66 EBL & WBL,  Facility Carried by Structure: Free State Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.066,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.7m (117.1ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 26.8m (87.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 741,  Location: .39 Fr 720 & .66 To 719 (Lat: 38.850475,  Lng: -77.874944),  Route carried "on" structure: County highway 721,  Year Built: 1967,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 798 (year 2015),  Average Future Daily Traffic: 898 (year 2040),  Design Load: HS 20,  Features Intersected: Carter Run,  Facility Carried by Structure: Free State Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.165,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2022
Find on map >>   Show street view

Structure Number: 7411,  Location: .22 Fr F-184 & .30 To 731 (Lat: 38.878281,  Lng: -77.909483),  Route carried "on" structure: County highway 723,  Year Built: 1937,  Year Reconstructed: 2014,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 573 (year 2015),  Average Future Daily Traffic: 719 (year 2040),  Design Load: HS 20,  Features Intersected: Branch Goose Creek,  Facility Carried by Structure: Ashville Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.603,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $80,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $100,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 7412,  Location: .02 Fr F185 & .02 To F184 (Lat: 38.879383,  Lng: -77.905622),  Route carried "on" structure: County highway 723,  Year Built: 1960,  Status: Open,  Structure Length: 6.31m (20.70ft),  Average Daily Traffic: 975 (year 2015),  Average Future Daily Traffic: 1,097 (year 2040),  Design Load: HS 20,  Features Intersected: I-66 EBL & WBL,  Facility Carried by Structure: Ashville Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.066,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.31m (20.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $50,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $70,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7151,  Location: 1.3 FR 55 & 2.32 TO 245 (Lat: 38.857903,  Lng: -77.843200),  Route carried "under" structure: Interstate 66,  Year Built: 1978,  Structure Length: 0. m,  Average Daily Traffic: 34,326 (year 2008),  Truck Traffic: 4%,  Features Intersected: RTE 66,  Facility Carried by Structure: WINCHESTER RD.
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 46.114,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.5m (123.0ft)

Find on map >>   Show street view

Structure Number: 7155,  Location: .28 Fr 713 &.18 To 66_EBL (Lat: 38.895664,  Lng: -77.912811),  Route carried "under" structure: Interstate 66,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 16,000 (year 1994),  Features Intersected: I-66 WBL,  Facility Carried by Structure: 17 SBL
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 7198,  Location: 2.36 Fr 17N & 2.67 To 17S (Lat: 38.869111,  Lng: -77.889308),  Route carried "under" structure: Interstate 732,  Year Built: 1978,  Structure Length: 0. m,  Average Daily Traffic: 714 (year 2001),  Features Intersected: Route 732,  Facility Carried by Structure: I-66 WBL
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 17.184,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>   Show street view

Structure Number: 72,  Location: 2.36 Fr 17N & 2.67 To 17S (Lat: 38.868967,  Lng: -77.889428),  Route carried "under" structure: County highway 732,  Year Built: 1978,  Structure Length: 0. m,  Average Daily Traffic: 714 (year 2001),  Features Intersected: Route 732,  Facility Carried by Structure: I-66 EBL
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 17.184,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>   Show street view

Structure Number: 7392,  Location: .63 Fr 55 & .47 To 750 (Lat: 38.857372,  Lng: -77.820506),  Route carried "under" structure: Interstate 66,  Year Built: 1979,  Structure Length: 0. m,  Average Daily Traffic: 12,000 (year 1997),  Features Intersected: I-66,  Facility Carried by Structure: Belvoir Road
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 48.399,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>   Show street view

Structure Number: 7408,  Location: 0.20 Fr 55 & 0.12 To 647 (Lat: 38.858811,  Lng: -77.867772),  Route carried "under" structure: County highway 66,  Year Built: 1978,  Structure Length: 0. m,  Average Daily Traffic: 39,688 (year 2008),  Truck Traffic: 4%,  Features Intersected: I-66 EBL & WBL,  Facility Carried by Structure: Free State Road
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 44.006,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.7m (117.1ft)

Find on map >>   Show street view

Structure Number: 7412,  Location: .02 Fr F185 & .02 To F184 (Lat: 38.879383,  Lng: -77.905622),  Route carried "under" structure: Interstate 66,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 39,687 (year 2008),  Truck Traffic: 4%,  Features Intersected: I-66 EBL & WBL,  Facility Carried by Structure: Ashville Road
Minimum Vertical Clearance: 4.77m (15.65ft),  Kilometerpoint: 39.533,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.3m (60.0ft)

Discuss Marshall, Virginia (VA) on our hugely popular Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.