Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Mayer, Arizona (AZ)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 269ft / 81.8mTotal length
  • $90,000Total costs
  • 202,175Total average daily traffic
  • 21,898Total average daily truck traffic
  • 216,101Total future (year 2037) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Mayer
  • No street view available for this location

New bridges in Mayer, AZ - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 31930-1939
  • 41960-1969
  • 61990-1999
  • 12000-2009
Reconstructed bridges in Mayer, AZ - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 21950-1959
  • 11960-1969
Average Bridge Daily Traffic in Mayer, AZ
Average Bridge Truck Traffic in Mayer, AZ
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Good
  • 33.3%Satisfactory
  • 33.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.7%Very good
  • 40.0%Good
  • 33.3%Satisfactory
  • 20.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.7%Very good
  • 60.0%Good
  • 26.7%Satisfactory
  • 6.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.0%Very good
  • 70.0%Good
  • 20.0%Satisfactory
Find on map >>   Show street view

Structure Number: 98,  Location: 9.7 mi N Jct SR 82 (Lat: 31.856400,  Lng: -110.201900),  Route carried "on" structure: State highway 80,  Year Built: 1933,  Year Reconstructed: 1956,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 3,206 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 4,987 (year 2039),  Design Load: HS 20,  Features Intersected: Dry Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 489.466,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 99,  Location: 16.3 mi E Jct SR 88 (Lat: 33.587600,  Lng: -110.648700),  Route carried "on" structure: US 60,  Year Built: 1933,  Year Reconstructed: 1960,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 2,788 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 4,309 (year 2040),  Design Load: HS 20,  Features Intersected: Seven Mile Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 431.626,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1,  Location: 0.1 mi W Jct US 93 (Lat: 33.968200,  Lng: -112.730900),  Route carried "on" structure: City street ,  Year Built: 1937,  Year Reconstructed: 1958,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 500 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 510 (year 2039),  Design Load: HS 20,  Features Intersected: US 60,  Facility Carried by Structure: Frontier Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.71m (8.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Total Project Cost: $1,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 101,  Location: 6.1 mi W Jct SR 85 (Lat: 32.927500,  Lng: -112.835600),  Route carried "on" structure: ServiceState highway 8,  Year Built: 1923,  Year Reconstructed: 1949,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 130 (year 2021),  Truck Traffic: 26%,  Average Future Daily Traffic: 140 (year 2041),  Design Load: H 15,  Features Intersected: Gillespie Canal
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 176.304,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 29.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $1,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 121,  Location: 1.9 mi W Jct US 60 (Lat: 33.410500,  Lng: -111.978200),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 8.72m (28.61ft),  Average Daily Traffic: 56,963 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 56,973 (year 2039),  Design Load: HS 20,  Features Intersected: I 10,  Facility Carried by Structure: 48th Street
Minimum Vertical Clearance: 6.07m (19.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 12,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.7m (94.2ft),  Curb-To-Curb Width: 25.0m (82.0ft),  Out-to-Out Width: 29.6m (97.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.72m (28.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,000,  Total Project Cost: $1,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 122,  Location: 4.0 mi E Jct I 19 (Lat: 32.162500,  Lng: -110.917900),  Route carried "on" structure: Interstate 10,  Year Built: 1967,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 39,504 (year 2018),  Truck Traffic: 15%,  Average Future Daily Traffic: 39,514 (year 2040),  Design Load: HS 20,  Features Intersected: Palo Verde Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 425.462,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 127,  Location: 9.5 mi E Jct I 17 (Lat: 35.208200,  Lng: -111.517300),  Route carried "on" structure: ServiceState highway 40,  Year Built: 1966,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 965 (year 2019),  Truck Traffic: 33%,  Average Future Daily Traffic: 975 (year 2039),  Design Load: HS 20,  Features Intersected: I 40 EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 329.835,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 128,  Location: 6.5 mi E Jct US 95 (Lat: 32.678000,  Lng: -114.503600),  Route carried "on" structure: Interstate 8,  Year Built: 1968,  Status: Open,  Structure Length: 8.56m (28.08ft),  Average Daily Traffic: 20,406 (year 2017),  Truck Traffic: 26%,  Average Future Daily Traffic: 30,900 (year 2037),  Design Load: HS 20,  Features Intersected: Fortuna SPRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.010,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 6 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.0m (105.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.56m (28.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $84,000,  Total Project Cost: $86,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2438,  Location: 5.6 mi NW Jct I 17 (Lat: 34.381400,  Lng: -112.199200),  Route carried "on" structure: State highway 69,  Year Built: 1998,  Status: Open,  Structure Length: 5.33m (17.49ft),  Average Daily Traffic: 7,003 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 7,013 (year 2038),  Design Load: HS 20,  Features Intersected: Big Bug Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 432.012,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2439,  Location: 5.6 mi NW Jct I 17 (Lat: 34.381200,  Lng: -112.199300),  Route carried "on" structure: State highway 69,  Year Built: 1997,  Status: Open,  Structure Length: 5.33m (17.49ft),  Average Daily Traffic: 6,570 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,580 (year 2038),  Design Load: HS 20,  Features Intersected: Big Bug Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 432.012,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2441,  Location: 5.9 mi NW Jct I 17 (Lat: 34.382200,  Lng: -112.205100),  Route carried "on" structure: State highway 69,  Year Built: 1998,  Status: Open,  Structure Length: 6.13m (20.11ft),  Average Daily Traffic: 6,570 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,580 (year 2038),  Design Load: HS 20,  Features Intersected: Big Bug Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 432.592,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2442,  Location: 8.0 mi NW Jct I 17 (Lat: 34.400400,  Lng: -112.231900),  Route carried "on" structure: State highway 69,  Year Built: 1998,  Status: Open,  Structure Length: 6.61m (21.69ft),  Average Daily Traffic: 9,068 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 9,078 (year 2038),  Design Load: HS 20,  Features Intersected: Big Bug Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 435.971,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2443,  Location: 8.0 mi NW Jct I 17 (Lat: 34.400200,  Lng: -112.232200),  Route carried "on" structure: State highway 69,  Year Built: 1998,  Status: Open,  Structure Length: 6.61m (21.69ft),  Average Daily Traffic: 6,997 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 7,007 (year 2038),  Design Load: HS 20,  Features Intersected: Big Bug Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 435.971,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 265,  Location: B. Home @ 51st Ave (Lat: 33.523800,  Lng: -112.169200),  Route carried "on" structure: City street ,  Year Built: 2004,  Status: Open,  Structure Length: 11.00m (36.09ft),  Average Daily Traffic: 31,022 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 31,032 (year 2039),  Design Load: HS 20,  Features Intersected: Grand Ave & Bethany Home,  Facility Carried by Structure: 51st Avenue
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 13,  Owner: State Highway Agency,  Approaching Roadway Width: 20.4m (66.9ft),  Skew: 32 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 53.9m (176.8ft),  Curb-To-Curb Width: 19.8m (65.0ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7012,  Location: 6.6 mi NW of Jct W/ I 17 (Lat: 34.385100,  Lng: -112.216500),  Route carried "on" structure: State highway 69,  Year Built: 1997,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 10,303 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 10,313 (year 2040),  Design Load: HS 20,  Features Intersected: Cemetary Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 433.830,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 24 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2021,  Total Project Cost: $1,000 ( Estimate for 2017)
Find on map >>   Show street view

Structure Number: 8252,  Location: 0.6 mi SW Jct SR 69 (Lat: 34.406000,  Lng: -112.245300),  Route carried "on" structure: County highway ,  Year Built: 1927,  Status: Posted for load,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 180 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 190 (year 2041),  Design Load: H 15,  Features Intersected: Big Bug Creek,  Facility Carried by Structure: Main Street
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss Mayer, Arizona (AZ) on our hugely popular Arizona forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.