Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for McKenzie, Tennessee (TN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 41Number of bridges
  • 279ft / 85.0mTotal length
  • $3,092,000Total costs
  • 129,128Total average daily traffic
  • 12,136Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for McKenzie
  • No street view available for this location

New bridges in McKenzie, TN - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11940-1949
  • 41950-1959
  • 21960-1969
  • 41970-1979
  • 71980-1989
  • 111990-1999
  • 82000-2009
  • 32010-2019
Average Bridge Daily Traffic in McKenzie, TN
Average Bridge Truck Traffic in McKenzie, TN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 66.7%Good
  • 33.3%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 27.8%Very good
  • 27.8%Good
  • 33.3%Satisfactory
  • 11.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.6%Very good
  • 66.7%Good
  • 16.7%Satisfactory
  • 5.6%Fair
  • 5.6%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Good
  • 69.4%Satisfactory
  • 2.8%Fair
  • 2.8%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 35.0%Good
  • 50.0%Satisfactory
  • 10.0%Fair
  • 5.0%Poor
Find on map >>   Show street view

Structure Number: 9017260003,  Location: 4.3 MI SW JCT SR22&SR76 (Lat: 36.102389,  Lng: -88.582250),  Route carried "on" structure: County highway 969,  Year Built: 1994,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 567 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 576 (year 2039),  Design Load: HS 20,  Features Intersected: TODD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.925,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $28,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $43,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9017260005,  Location: 2.9 MI SW JCT SR22&SR76 (Lat: 36.098028,  Lng: -88.546389),  Route carried "on" structure: County highway 1726,  Year Built: 1991,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 410 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 784 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.770,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 90A1350001,  Location: 4.0 MI SW JCT SR76&SR124 (Lat: 36.112528,  Lng: -88.577361),  Route carried "on" structure: County highway 135,  Year Built: 1983,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 50 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 80 (year 2039),  Design Load: HS 20,  Features Intersected: ELENDER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.682,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 90A1390001,  Location: 3.4 MI SW JCT SR76&SR124 (Lat: 36.091889,  Lng: -88.552472),  Route carried "on" structure: County highway 139,  Year Built: 1970,  Status: Posted for load,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 260 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 416 (year 2040),  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.301,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 35.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $123,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $185,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 90A2580001,  Location: IN THE CITY OF MCKENZIE (Lat: 36.121750,  Lng: -88.507556),  Route carried "on" structure: City street 258,  Year Built: 1960,  Status: Closed,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 850 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,360 (year 2041),  Design Load: H 15,  Features Intersected: SPRING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.790,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Poor,  Culverts: Poor,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $290,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $436,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 90A2710001,  Location: 1.9 MI SE JCT SR76&SR124 (Lat: 36.100278,  Lng: -88.499889),  Route carried "on" structure: County highway 271,  Year Built: 1995,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 140 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 224 (year 2039),  Design Load: HS 20,  Features Intersected: SPRING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.925,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 90A2740001,  Location: 2.3 MI SE JCT SR76&SR124 (Lat: 36.097000,  Lng: -88.495472),  Route carried "on" structure: County highway 274,  Year Built: 1983,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 60 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 96 (year 2039),  Design Load: HS 20,  Features Intersected: SPRING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.296,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 9S80380001,  Location: 2.5 MI SE JCT SR22&SR124 (Lat: 36.119028,  Lng: -88.465528),  Route carried "on" structure: State highway 423,  Year Built: 2018,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 910 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,456 (year 2042),  Design Load: HL 93,  Features Intersected: CLEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.184,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.2m (30.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9S82330013,  Location: 3.6 MI S JCT SR76&SR22 (Lat: 36.073733,  Lng: -88.510967),  Route carried "on" structure: State highway 436,  Year Built: 2012,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 1,424 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,278 (year 2042),  Design Load: HL 93,  Features Intersected: OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.745,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.9m (32.5ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: May 2017,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9S82330015,  Location: 3.5 MI S JCT SR76&SR22 (Lat: 36.075100,  Lng: -88.511283),  Route carried "on" structure: County highway 436,  Year Built: 2012,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 1,424 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,278 (year 2042),  Design Load: HL 93,  Features Intersected: CLEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.898,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.9m (32.5ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9SR0220001,  Location: .4 MI.N.OF HENDERSON CO. (Lat: 35.827444,  Lng: -88.389536),  Route carried "on" structure: State highway 22,  Year Built: 1997,  Status: Open,  Structure Length: 4.40m (14.44ft),  Average Daily Traffic: 4,891 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 8,224 (year 2039),  Design Load: HS 20,  Features Intersected: MUD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.692,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 26.1m (85.6ft),  Out-to-Out Width: 26.7m (87.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 45.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9SR0220021,  Location: 1.8 MI.SE.OF MCKENIZE (Lat: 36.099500,  Lng: -88.485944),  Route carried "on" structure: State highway 22,  Year Built: 1991,  Status: Open,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 8,293 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 15,024 (year 2039),  Design Load: HS 20,  Features Intersected: CLEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.507,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 9SR0220,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.87m (9.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $577,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $866,000 ( Estimate for 2019),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9SR0220022,  Location: 1.8 MI.SE.OF MCKENIZE (Lat: 36.099250,  Lng: -88.486250),  Route carried "on" structure: State highway 22,  Year Built: 1991,  Status: Open,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 8,293 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 15,024 (year 2039),  Design Load: HS 20,  Features Intersected: CLEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.507,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 9SR0220,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9SR0220023,  Location: IN MCKENZIE (Lat: 36.140917,  Lng: -88.488278),  Route carried "on" structure: State highway 22,  Year Built: 1997,  Status: Open,  Structure Length: 7.44m (24.41ft),  Average Daily Traffic: 6,214 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 9,942 (year 2042),  Design Load: HS 20,  Features Intersected: SR 76 (US 79)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.383,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes (Inventory Route: 9SR0220,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9SR0220024,  Location: IN MCKENZIE (Lat: 36.140806,  Lng: -88.488639),  Route carried "on" structure: State highway 22,  Year Built: 1997,  Status: Open,  Structure Length: 7.44m (24.41ft),  Average Daily Traffic: 6,214 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 9,942 (year 2042),  Design Load: HS 20,  Features Intersected: SR 76 (US 79)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.383,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes (Inventory Route: 9SR0220,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9SR0760001,  Location: 1 MI.SE.OF TREZEVANT (Lat: 35.998000,  Lng: -88.638833),  Route carried "on" structure: US 79,  Year Built: 1929,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 4,530 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 7,248 (year 2042),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: FAP 76
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.808,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $154,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $232,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9SR0760009,  Location: 4.55 MI.NE.OF TREZEVANT (Lat: 36.074611,  Lng: -88.563833),  Route carried "on" structure: US 79,  Year Built: 1986,  Status: Open,  Structure Length: 9.08m (29.79ft),  Average Daily Traffic: 3,650 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 6,928 (year 2039),  Design Load: HS 20,  Features Intersected: SOUTH FORK OBION RIVER,  Facility Carried by Structure: FAP 76
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 65.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9SR0760011,  Location: 3.21MI.SW.OF MCKENZIE (Lat: 36.078750,  Lng: -88.560056),  Route carried "on" structure: US 79,  Year Built: 1985,  Status: Open,  Structure Length: 5.97m (19.59ft),  Average Daily Traffic: 3,650 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 5,840 (year 2041),  Design Load: HS 20,  Features Intersected: OVERFLOW,  Facility Carried by Structure: FAP 76
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.266,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 66.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: July 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9SR0760015,  Location: 1.2 MI.SW.OF MCKENZIE (Lat: 36.100750,  Lng: -88.539444),  Route carried "on" structure: US 79,  Year Built: 2009,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 4,759 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 7,614 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: BRANCH,  Facility Carried by Structure: FAP 76
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.340,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.3m (83.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 25.3m (83.0ft),  Out-to-Out Width: 28.7m (94.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9SR0760017,  Location: IN MCKENIZE (Lat: 36.104183,  Lng: -88.536717),  Route carried "on" structure: US 79,  Year Built: 2009,  Status: Open,  Structure Length: 2.09m (6.86ft),  Average Daily Traffic: 4,759 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 7,614 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: BRANCH,  Facility Carried by Structure: FAP 76
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.791,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 25.6m (84.0ft),  Out-to-Out Width: 29.3m (96.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9SR0760021,  Location: 0.2 MI SW JCT SR76&SR124 (Lat: 36.127167,  Lng: -88.512500),  Route carried "on" structure: US 79,  Year Built: 1951,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 8,423 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 14,176 (year 2039),  Design Load: HS 20,  Features Intersected: SPRING CREEK,  Facility Carried by Structure: FAP 76
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.170,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $207,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $311,000 ( Estimate for 2019)
Find on map >>   Show street view

Structure Number: 9SR1240001,  Location: IN MCKENIZE (Lat: 36.130028,  Lng: -88.513722),  Route carried "on" structure: State highway 124,  Year Built: 1950,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 5,929 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 10,384 (year 2039),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.931,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $87,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $131,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 400A1930001,  Location: 4 MI E. OF WEAKLEY CO. (Lat: 36.173639,  Lng: -88.495194),  Route carried "on" structure: County highway 193,  Year Built: 1981,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 140 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 224 (year 2039),  Features Intersected: CALEDONIA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.977,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 58.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 400A1930003,  Location: 5 MI. W. OF SR76 (Lat: 36.180639,  Lng: -88.487611),  Route carried "on" structure: County highway 193,  Year Built: 1962,  Status: Posted for load,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 140 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 224 (year 2042),  Design Load: H 10,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.023,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 45.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $260,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $391,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 400A5400001,  Location: .3 MI E OF WEAKLEY CO LN (Lat: 36.196111,  Lng: -88.524083),  Route carried "on" structure: County highway 540,  Year Built: 1979,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 32 (year 2040),  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.740,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.5m (14.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $116,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $175,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 400A5420001,  Location: 5 MI WEST OF HENRY (Lat: 36.196972,  Lng: -88.486694),  Route carried "on" structure: County highway 916,  Year Built: 1972,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 50 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 80 (year 2041),  Features Intersected: SPRING CREEK,  Facility Carried by Structure: NFA A542
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.299,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 30.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 40S80920001,  Location: 2.3 MILES N.OF MCKENZIE (Lat: 36.180278,  Lng: -88.505861),  Route carried "on" structure: State highway 140,  Year Built: 1987,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 601 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,136 (year 2039),  Design Load: HS 20,  Features Intersected: COLD BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.235,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 40S80920003,  Location: 2.5 MI.NORTH OF MCKENZIE (Lat: 36.181083,  Lng: -88.506194),  Route carried "on" structure: State highway 140,  Year Built: 1987,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 601 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,136 (year 2039),  Design Load: HS 20,  Features Intersected: OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.315,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 74.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 40S80920005,  Location: 2.2 MI.NORTH OF MCKENZIE (Lat: 36.182278,  Lng: -88.506667),  Route carried "on" structure: State highway 140,  Year Built: 2003,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 601 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,136 (year 2039),  Design Load: HS 20,  Features Intersected: OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.460,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 71.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 40SR0220003,  Location: 1.2 MI.N-WEST OF MCKENZIE (Lat: 36.168917,  Lng: -88.527750),  Route carried "on" structure: State highway 22,  Year Built: 1958,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 6,004 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 9,488 (year 2039),  Design Load: HS 20,  Features Intersected: DRAINAGE DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.704,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $214,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $322,000 ( Estimate for 2019)
Find on map >>   Show street view

Structure Number: 40SR0760031,  Location: S. OF PARIS (Lat: 36.156194,  Lng: -88.465972),  Route carried "on" structure: US 79,  Year Built: 2002,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 8,962 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 14,576 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: FAP 76
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.933,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 920A2590001,  Location: 1 MI N OF MCKGNZIE (Lat: 36.151683,  Lng: -88.530400),  Route carried "on" structure: County highway 259,  Year Built: 2007,  Status: Open,  Structure Length: 1.56m (5.12ft),  Average Daily Traffic: 240 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 384 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.311,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 920A2640001,  Location: 0.3 MI W OF SR22 (Lat: 36.175611,  Lng: -88.542472),  Route carried "on" structure: County highway 264,  Year Built: 2005,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 40 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 64 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: SPRING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.505,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.5m (34.4ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 71.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 920A3480001,  Location: 1 MI NW OF MCKENZIE (Lat: 36.158306,  Lng: -88.548389),  Route carried "on" structure: County highway 348,  Year Built: 2005,  Status: Open,  Structure Length: 1.20m (3.94ft),  Average Daily Traffic: 10 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 16 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: SPRING CREEK BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.359,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 89.9 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 920A5320001,  Location: 0.1 MI W HENRY (Lat: 36.171611,  Lng: -88.529361),  Route carried "on" structure: County highway 532,  Year Built: 1970,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 60 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 96 (year 2040),  Design Load: H 15,  Features Intersected: BOAZ CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.190,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 920A5390001,  Location: 0.2 MI W OF HENRY (Lat: 36.187833,  Lng: -88.530778),  Route carried "on" structure: County highway 539,  Year Built: 2005,  Status: Open,  Structure Length: 1.36m (4.46ft),  Average Daily Traffic: 10 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 16 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.633,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 92SR0220031,  Location: 5 MILES SE.OF GLEASON (Lat: 36.174194,  Lng: -88.534917),  Route carried "on" structure: State highway 22,  Year Built: 1945,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 5,528 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 9,776 (year 2040),  Design Load: HS 20,  Features Intersected: BOAZ CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.692,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020
Find on map >>   Show street view

Structure Number: 92SR0220075,  Location: 4 MI N OF SR 124 (Lat: 36.179417,  Lng: -88.541917),  Route carried "on" structure: State highway 22,  Year Built: 1997,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 5,528 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 9,776 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.561,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 19.8m (65.0ft),  Out-to-Out Width: 24.9m (81.7ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 81.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9SR0220023,  Location: IN MCKENZIE (Lat: 36.140917,  Lng: -88.488278),  Route carried "under" structure: US 79,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 8,962 (year 2020),  Truck Traffic: 9%,  Features Intersected: SR 22 NB,  Facility Carried by Structure: FAP 22 NB
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 27.793,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 9SR0220024,  Location: IN MCKENZIE (Lat: 36.140806,  Lng: -88.488639),  Route carried "under" structure: US 79,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 7,508 (year 2020),  Truck Traffic: 9%,  Features Intersected: SR 22 SB,  Facility Carried by Structure: FAP 22 SB
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 27.761,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 9SR0760019,  Location: NEAR MCKENZIE TENN. (Lat: 36.126278,  Lng: -88.513556),  Route carried "under" structure: US 79,  Year Built: 1951,  Structure Length: 0. m,  Average Daily Traffic: 8,423 (year 2020),  Truck Traffic: 9%,  Features Intersected: CSX RR / SR 76,  Facility Carried by Structure: CSX RR 350941K
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 25.009,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.4m (44.0ft)

Discuss McKenzie, Tennessee (TN) on our hugely popular Tennessee forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.