Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Mechanicstown, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 25Number of bridges
  • 266ft / 80.9mTotal length
  • $143,169,000Total costs
  • 434,373Total average daily traffic
  • 33,212Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Mechanicstown
  • No street view available for this location

New bridges in Mechanicstown, NY - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11920-1929
  • 11930-1939
  • 11940-1949
  • 11950-1959
  • 91960-1969
  • 21990-1999
  • 52000-2009
  • 42010-2019
Reconstructed bridges in Mechanicstown, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 11990-1999
  • 12000-2009
  • 22010-2019
Average Bridge Daily Traffic in Mechanicstown, NY
Average Bridge Truck Traffic in Mechanicstown, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.1%Excellent
  • 28.6%Very good
  • 7.1%Good
  • 35.7%Satisfactory
  • 14.3%Fair
  • 7.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.9%Excellent
  • 35.3%Very good
  • 23.5%Good
  • 5.9%Satisfactory
  • 29.4%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.9%Excellent
  • 23.5%Very good
  • 29.4%Good
  • 17.6%Satisfactory
  • 23.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 15.4%Good
  • 46.2%Satisfactory
  • 30.8%Fair
  • 7.7%Poor
Find on map >>   Show street view

Structure Number: 100313,  Location: JCT RTE 6+WALLKILL R (Lat: 41.402125,  Lng: -74.389719),  Route carried "on" structure: US 6,  Year Built: 1931,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 15,664 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 19,028 (year 2040),  Design Load: HS 20,  Features Intersected: WALLKILL RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.421,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Truss - Deck,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 12.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 9.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 7.49m (24.57ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Bridge Improvement Cost: $9,631,000,  Roadway Improvement Cost: $5,640,000,  Total Project Cost: $15,272,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 101396,  Location: .2 MI E JCT SH211 & SH 17 (Lat: 41.457569,  Lng: -74.375961),  Route carried "on" structure: State highway 17,  Year Built: 1949,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 55,134 (year 2005),  Truck Traffic: 11%,  Average Future Daily Traffic: 77,777 (year 2040),  Design Load: H 20,  Features Intersected: MNRR PJ Line/NSRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.164,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.2m (86.0ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 28.3m (92.8ft),  Out-to-Out Width: 31.3m (102.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 55.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $8,108,000,  Roadway Improvement Cost: $4,748,000,  Total Project Cost: $12,856,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 101398,  Location: JCT SH17 & WALLKILL RIVER (Lat: 41.439803,  Lng: -74.360392),  Route carried "on" structure: State highway 17,  Year Built: 2005,  Status: Open,  Structure Length: 11.09m (36.38ft),  Average Daily Traffic: 42,145 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 59,453 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: WALLKILL RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.481,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.9m (75.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 54.8m (179.8ft),  Curb-To-Curb Width: 33.2m (108.9ft),  Out-to-Out Width: 35.1m (115.2ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.09m (36.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $10,084,000,  Roadway Improvement Cost: $5,905,000,  Total Project Cost: $15,989,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1040959,  Location: 0.5 MI W JCT RTS 211+17 (Lat: 41.455569,  Lng: -74.384881),  Route carried "on" structure: State highway 211,  Year Built: 1969,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 23,019 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 27,963 (year 2040),  Design Load: H 20,  Features Intersected: MASONIC CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.287,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.3m (96.1ft),  Skew: 31 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 72.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,195,000,  Roadway Improvement Cost: $1,285,000,  Total Project Cost: $3,481,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1040969,  Location: .1 MI W JCT SH 211 & SH17 (Lat: 41.458328,  Lng: -74.378811),  Route carried "on" structure: State highway 211,  Year Built: 1969,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 4.97m (16.31ft),  Truck Traffic: 4%,  Design Load: HS 20+Mod,  Features Intersected: MNRR PJ Line/NSRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.915,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 30.8m (101.0ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.7m (54.8ft),  Curb-To-Curb Width: 31.8m (104.3ft),  Out-to-Out Width: 33.1m (108.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.96m (16.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $6,621,000,  Roadway Improvement Cost: $3,877,000,  Total Project Cost: $10,498,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1052539,  Location: 3.1 MI EAST OF EXIT 3-I84 (Lat: 41.441092,  Lng: -74.376719),  Route carried "on" structure: Interstate 84,  Year Built: 1967,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 32,011 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 54,207 (year 2040),  Design Load: HS 20,  Features Intersected: MASONIC CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.767,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.0m (19.7ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $963,000,  Roadway Improvement Cost: $564,000,  Total Project Cost: $1,527,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 105254,  Location: 3.8 MI E INT 3 I84 (Lat: 41.441839,  Lng: -74.376117),  Route carried "on" structure: County highway ,  Year Built: 1968,  Status: Open,  Structure Length: 6.64m (21.78ft),  Average Daily Traffic: 9,421 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 11,444 (year 2040),  Design Load: HS 20,  Features Intersected: 84I 84I83011186 EB, RTE,  Facility Carried by Structure: COUNTY ROAD 67
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.754,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.6m (107.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Inventory Rating: 66.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.64m (21.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $3,530,000,  Roadway Improvement Cost: $2,067,000,  Total Project Cost: $5,596,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1052559,  Location: JCT SH 17 & I84 (Lat: 41.447614,  Lng: -74.369767),  Route carried "on" structure: State highway 17,  Year Built: 1968,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 7.86m (25.79ft),  Average Daily Traffic: 55,134 (year 2015),  Truck Traffic: 11%,  Average Future Daily Traffic: 77,777 (year 2040),  Design Load: HS 20,  Features Intersected: 84I 84I83011192 SB, RTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.323,  Lanes on structure: 6,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 37.7m (123.7ft),  Curb-To-Curb Width: 35.4m (116.1ft),  Out-to-Out Width: 37.2m (122.0ft)

Condition: Deck: Excellent,  Superstructure: Good,  Substructure: Very good,  Inventory Rating: 67.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.86m (25.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $12,279,000,  Roadway Improvement Cost: $7,190,000,  Total Project Cost: $19,469,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107898,  Location: .4 mi SE JCT RTS. 211 & 1 (Lat: 41.454144,  Lng: -74.373697),  Route carried "on" structure: State highway 17,  Year Built: 2009,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 55,134 (year 2005),  Truck Traffic: 11%,  Average Future Daily Traffic: 77,777 (year 2040),  Design Load: HL 93,  Features Intersected: Wallkill Winning Way
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.582,  Lanes on structure: 6,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.0m (95.1ft),  Skew: 31 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 36.3m (119.1ft),  Out-to-Out Width: 38.2m (125.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 46.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.52m (8.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $7,161,000,  Roadway Improvement Cost: $4,193,000,  Total Project Cost: $11,354,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107918,  Location: 600 m E JCT 84-I & Rt.17 (Lat: 41.443964,  Lng: -74.365225),  Route carried "on" structure: Other road ,  Year Built: 2015,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 3,460 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 4,881 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: Ramp K,  Facility Carried by Structure: Ramp D
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 7 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Superstructure: Very good,  Substructure: Excellent,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 97.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.29m (10.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $7,449,000,  Roadway Improvement Cost: $4,362,000,  Total Project Cost: $11,812,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 107919,  Location: 0.5 MI SE Jct 17 + 84 (Lat: 41.441431,  Lng: -74.361889),  Route carried "on" structure: County highway ,  Year Built: 2014,  Status: Open,  Structure Length: 8.96m (29.40ft),  Average Daily Traffic: 15,465 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 18,786 (year 2040),  Design Load: HL 93,  Features Intersected: 17 17 83101090 NB, 17,  Facility Carried by Structure: East Main St
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.928,  Lanes on structure: 4,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 46.0m (150.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 19.2m (63.0ft),  Out-to-Out Width: 23.3m (76.4ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 38.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.96m (29.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $7,752,000,  Roadway Improvement Cost: $4,540,000,  Total Project Cost: $12,292,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 222342,  Location: 3.0 MI NW OF GOSHEN (Lat: 41.438808,  Lng: -74.365422),  Route carried "on" structure: Other road ,  Year Built: 1967,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 10.67m (35.01ft),  Average Daily Traffic: 1,488 (year 2017),  Truck Traffic: 18%,  Average Future Daily Traffic: 2,083 (year 2037),  Features Intersected: WALLKILL RIVER,  Facility Carried by Structure: MIDWAY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 66.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.66m (34.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $3,237,000,  Roadway Improvement Cost: $1,895,000,  Total Project Cost: $5,132,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 334457,  Location: 2.4 MI W OF GOSHEN (Lat: 41.411694,  Lng: -74.375289),  Route carried "on" structure: Other road ,  Year Built: 1995,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 1,440 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,016 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: CHEECHUNK CREEK,  Facility Carried by Structure: ECHO LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.864,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 62.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $703,000,  Roadway Improvement Cost: $411,000,  Total Project Cost: $1,114,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 334461,  Location: 3.4 MI SE OF MIDDLETOWN (Lat: 41.412111,  Lng: -74.377661),  Route carried "on" structure: Other road ,  Year Built: 1965,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 1,440 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,016 (year 2037),  Design Load: HS 20,  Features Intersected: WALLKILL RIVER,  Facility Carried by Structure: CHEECHUNK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.073,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 93.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 71.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,133,000,  Roadway Improvement Cost: $1,249,000,  Total Project Cost: $3,382,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334511,  Location: WALLKILL (Lat: 41.437558,  Lng: -74.372756),  Route carried "on" structure: County highway ,  Year Built: 2000,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 4,935 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,106 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: MASONIC CREEK,  Facility Carried by Structure: GOLF LINKS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.409,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 69.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $629,000,  Roadway Improvement Cost: $368,000,  Total Project Cost: $998,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 334513,  Location: 2.0 MI E OF MIDDLETOWN (Lat: 41.444517,  Lng: -74.381189),  Route carried "on" structure: County highway ,  Year Built: 2008,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 9,421 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 11,444 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: MASONIC CREEK,  Facility Carried by Structure: EAST MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.175,  Lanes on structure: 3,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 12.7m (41.7ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,058,000,  Roadway Improvement Cost: $620,000,  Total Project Cost: $1,677,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 334514,  Location: 3.0 MI NW OF GOSHEN (Lat: 41.440167,  Lng: -74.364303),  Route carried "on" structure: Other road ,  Year Built: 1957,  Status: Open,  Structure Length: 0.98m (3.22ft),  Truck Traffic: 4%,  Design Load: HS 20,  Features Intersected: TRIB WALLKILL RIV,  Facility Carried by Structure: Old East Main Stre
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 52.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $716,000,  Roadway Improvement Cost: $419,000,  Total Project Cost: $1,135,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 336018,  Location: 1.9 MI EAST OF MIDDLETOWN (Lat: 41.456847,  Lng: -74.385047),  Route carried "on" structure: Other road ,  Year Built: 1920,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 2,674 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,744 (year 2040),  Features Intersected: MASONIC CREEK,  Facility Carried by Structure: MALTESE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.708,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 46.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.22m (7.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,299,000,  Roadway Improvement Cost: $1,932,000,  Total Project Cost: $5,231,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33692,  Location: 0.8 MI W JCT SH17 & I84 (Lat: 41.447478,  Lng: -74.385869),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 9,075 (year 2015),  Truck Traffic: 2%,  Average Future Daily Traffic: 12,705 (year 2035),  Design Load: HS 20,  Features Intersected: MASONIC CREEK,  Facility Carried by Structure: COUNTY ROAD 108
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $440,000,  Roadway Improvement Cost: $257,000,  Total Project Cost: $697,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 337046,  Location: 900 M SE JCT 84-I & Rt.17 (Lat: 41.440739,  Lng: -74.364386),  Route carried "on" structure: County highway ,  Year Built: 2015,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 9,421 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 11,444 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: PHILLIPSBURG CREE,  Facility Carried by Structure: EAST MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.218,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.8m (35.4ft),  Curb-To-Curb Width: 19.2m (63.0ft),  Out-to-Out Width: 41.5m (136.2ft)

Condition: Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 80.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,306,000,  Roadway Improvement Cost: $1,351,000,  Total Project Cost: $3,657,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 105254,  Location: 3.8 MI E INT 3 I84 (Lat: 41.441839,  Lng: -74.376117),  Route carried "under" structure: Interstate 84,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 8,100 (year 1971),  Features Intersected: 84I 84I83011186 EB, RTE,  Facility Carried by Structure: COUNTY ROAD 67
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 29.895,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 1052559,  Location: JCT SH 17 & I84 (Lat: 41.447614,  Lng: -74.369767),  Route carried "under" structure: Interstate 84,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 8,100 (year 1971),  Features Intersected: 84I 84I83011192 SB, RTE,  Facility Carried by Structure: RTE 17
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 30.861,  Lanes on structure: 6,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.7m (123.7ft)

Find on map >>   Show street view

Structure Number: 107898,  Location: .4 mi SE JCT RTS. 211 & 1 (Lat: 41.454144,  Lng: -74.373697),  Route carried "under" structure: Other road ,  Year Built: 2009,  Structure Length: 0. m,  Features Intersected: Wallkill Winning Way,  Facility Carried by Structure: RTE 17
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 107919,  Location: 0.5 MI SE Jct 17 + 84 (Lat: 41.441431,  Lng: -74.361889),  Route carried "under" structure: Interstate ,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 63,763 (year 2012),  Features Intersected: 17 17 83101090 NB, 17,  Facility Carried by Structure: East Main St
Minimum Vertical Clearance: 6.96m (22.83ft),  Kilometerpoint: 585.676,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.0m (150.9ft)

Find on map >>   Show street view

Structure Number: 771288,  Location: 1.8 MI NE OF MIDDLETOWN (Lat: 41.464975,  Lng: -74.387544),  Route carried "under" structure: Other road ,  Year Built: 1906,  Structure Length: 0. m,  Average Daily Traffic: 7,929 (year 2020),  Truck Traffic: 3%,  Features Intersected: SLV LK SCTHTWN RD, MASON,  Facility Carried by Structure: MNRR PJ LINE
Minimum Vertical Clearance: 3.04m (9.97ft),  Kilometerpoint: 0.949,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Arch - Deck,  Length of Maximum Span: 6.7m (22.0ft)

Discuss Mechanicstown, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.