Bridge Statistics for Menlo, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 59ft / 17.6mTotal length
  • $51,448,000Total costs
  • 14,860Total average daily traffic
  • 459Total average daily truck traffic
  • 22,015Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Menlo
  • No street view available for this location

New bridges in Menlo, GA - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 21930-1939
  • 31940-1949
  • 21960-1969
  • 11980-1989
  • 12010-2019
  • 12020-2022
Average Bridge Daily Traffic in Menlo, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Good
  • 33.3%Satisfactory
  • 16.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Very good
  • 33.3%Satisfactory
  • 33.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.7%Very good
  • 33.3%Good
  • 16.7%Satisfactory
  • 33.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.0%Excellent
  • 20.0%Very good
  • 10.0%Good
  • 50.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 80.0%Good
  • 20.0%Satisfactory
Find on map >>   Show street view

Structure Number: 550008,  Location: 0.5 MI NW OF MENLO (Lat: 34.489739,  Lng: -85.487650),  Route carried "on" structure: State highway 48,  Year Built: 1947,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 2,530 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,795 (year 2031),  Design Load: H 15,  Features Intersected: SHIN BONE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.44m (24.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $193,000
Find on map >>   Show street view

Structure Number: 550009,  Location: IN EAST MENLO (Lat: 34.482889,  Lng: -85.469928),  Route carried "on" structure: State highway 48,  Year Built: 1947,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 3,640 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,460 (year 2031),  Design Load: H 15,  Features Intersected: ALPINE CREEK TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 55001,  Location: 1 MI EAST OF MENLO (Lat: 34.482758,  Lng: -85.459158),  Route carried "on" structure: State highway 48,  Year Built: 1947,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 3,640 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,460 (year 2031),  Design Load: H 15,  Features Intersected: ALPINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $193,000
Find on map >>   Show street view

Structure Number: 555024,  Location: 4 MI SW OF BERRYTON (Lat: 34.427308,  Lng: -85.463939),  Route carried "on" structure: County highway 79,  Year Built: 1962,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 370 (year 2011),  Truck Traffic: 9%,  Average Future Daily Traffic: 555 (year 2031),  Design Load: H 15,  Features Intersected: BROOMTOWN CREEK,  Facility Carried by Structure: ALPINE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $86,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $129,000
Find on map >>   Show street view

Structure Number: 555025,  Location: 6 MI W OF BERRYTON (Lat: 34.453089,  Lng: -85.488978),  Route carried "on" structure: County highway 79,  Year Built: 1962,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: H 15,  Features Intersected: ALPINE CREEK,  Facility Carried by Structure: ALPINE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 555026,  Location: 1 MI S OF MENLO (Lat: 34.463308,  Lng: -85.476428),  Route carried "on" structure: County highway 85,  Year Built: 1981,  Status: Posted for load,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 90 (year 2011),  Truck Traffic: 11%,  Average Future Daily Traffic: 135 (year 2031),  Features Intersected: ALPINE CREEK,  Facility Carried by Structure: BUCK GARDNER RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 22.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 41.67m (136.71ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2020,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $137,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $205,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 555027,  Location: 1 MI SE OF MENLO (Lat: 34.470778,  Lng: -85.465208),  Route carried "on" structure: County highway 87,  Year Built: 1939,  Status: Posted for load,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Features Intersected: ALPINE CREEK,  Facility Carried by Structure: PEACH ORCHARD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 26.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 162.58m (533.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $77,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $115,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 555037,  Location: 0.8 MI NW OF MENLO (Lat: 34.492658,  Lng: -85.483678),  Route carried "on" structure: County highway 113,  Year Built: 1918,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 40 (year 2011),  Truck Traffic: 15%,  Average Future Daily Traffic: 60 (year 2031),  Design Load: H 15,  Features Intersected: SHINBONE CREEK,  Facility Carried by Structure: MASSEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.1m (16.7ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 32.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 41.15m (135.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $176,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 555055,  Location: IN MENLO (Lat: 34.486058,  Lng: -85.469239),  Route carried "on" structure: County highway 322,  Year Built: 1932,  Year Reconstructed: 1976,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 250 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 375 (year 2031),  Design Load: H 15,  Features Intersected: ALPINE CREEK TRIB,  Facility Carried by Structure: OLD HIGHWAY 337
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $176,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5551,  Location: 3 MI WEST OF MENLO (Lat: 34.522867,  Lng: -85.505667),  Route carried "on" structure: State highway 48,  Year Built: 2019,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 2,900 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,125 (year 2040),  Design Load: HL 93,  Features Intersected: EAST FORK LITTLE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.0m (128.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.50m (24.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $25,604,000,  Roadway Improvement Cost: $2,561,000,  Total Project Cost: $38,406,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 555102,  Location: 3.2 MI NE OF MENLO (Lat: 34.518500,  Lng: -85.439658),  Route carried "on" structure: County highway 322,  Year Built: 2020,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 250 (year 2040),  Design Load: HS 20,  Features Intersected: CHELSEA CREEK,  Facility Carried by Structure: OLD HIGHWAY 337
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 74.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.17m (10.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $7,696,000,  Roadway Improvement Cost: $770,000,  Total Project Cost: $11,544,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place