Bridge Statistics for Milford, New Hampshire (NH)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 92ft / 27.9mTotal length
  • $34,562,000Total costs
  • 146,704Total average daily traffic
  • 8,070Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Milford
  • No street view available for this location

New bridges in Milford, NH - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 101970-1979
  • 11980-1989
  • 11990-1999
  • 12010-2019
Average Bridge Daily Traffic in Milford, NH
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Very good
  • 70.0%Good
  • 10.0%Satisfactory
  • 10.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.0%Very good
  • 40.0%Good
  • 30.0%Satisfactory
  • 10.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.0%Very good
  • 80.0%Good
  • 10.0%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.7%Very good
  • 66.7%Good
  • 16.7%Satisfactory
Find on map >>   Show street view

Structure Number: 37018400102,  Location: .2 MI FROM RAYMOND TL (Lat: 43.062581,  Lng: -71.243236),  Route carried "on" structure: State highway 27,  Year Built: 1932,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 3,025 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,477 (year 2042),  Design Load: H 15,  Features Intersected: NORTH BRANCH RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.260,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 172006900118,  Location: 1/4 MILE S OF SAVAGE RD (Lat: 42.829142,  Lng: -71.702397),  Route carried "on" structure: Other road ,  Year Built: 1988,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,495 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,212 (year 2042),  Features Intersected: TUCKER BROOK,  Facility Carried by Structure: WHITTEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.539,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 30.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 172007600152,  Location: .64 MI LYNDEBORO TL. (Lat: 42.852800,  Lng: -71.694003),  Route carried "on" structure: State highway ,  Year Built: 1978,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 2,048 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,031 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: PURGATORY BROOK,  Facility Carried by Structure: NORTH RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.471,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 172008300124,  Location: 0.3 MI W JCT RTE 13 (Lat: 42.834225,  Lng: -71.692967),  Route carried "on" structure: State highway 101,  Year Built: 1978,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 14,961 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 22,142 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: PERRY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 57.359,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 17200990015,  Location: 1.1 MI FR MT VERNON TL (Lat: 42.850647,  Lng: -71.672547),  Route carried "on" structure: Other road ,  Year Built: 2015,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 1,252 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,852 (year 2042),  Design Load: HL 93,  Features Intersected: HARTSHORN BROOK,  Facility Carried by Structure: JENNISON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.304,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 57.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 44.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 172011200113,  Location: 1.0 MI W JCT NH 13. (Lat: 42.823517,  Lng: -71.660661),  Route carried "on" structure: State highway 101,  Year Built: 1977,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 14,961 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 22,142 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: OSGOOD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 60.288,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 172012200126,  Location: 0.1 MI FR UNION ST (Lat: 42.832319,  Lng: -71.649825),  Route carried "on" structure: City street ,  Year Built: 1992,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 1,599 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,366 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: GREAT BROOK,  Facility Carried by Structure: LINCOLN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.190,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 172012300133,  Location: 0.1 MI FROM MAPLE ST (Lat: 42.836514,  Lng: -71.649531),  Route carried "on" structure: State highway 13,  Year Built: 1931,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 12,480 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 18,470 (year 2042),  Design Load: H 15,  Features Intersected: SOUHEGAN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.842,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Good,  Channel: Good,  Operating Rating: 32.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 16 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2021,  Underwater Inspection Date: July 2019,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 172012800105,  Location: 1 MI S MILFORD VILLAGE (Lat: 42.817131,  Lng: -71.646119),  Route carried "on" structure: State highway 101,  Year Built: 1976,  Status: Open,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 20,817 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 30,809 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: NH 13
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 61.720,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.2m (108.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 51.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.44m (11.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 172014200106,  Location: 0.8 M W AMHERST T.L. (Lat: 42.817506,  Lng: -71.633000),  Route carried "on" structure: State highway 101,  Year Built: 1971,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 20,817 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 30,809 (year 2042),  Design Load: HS 20,  Features Intersected: PONEMAH HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 62.803,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 172015500115,  Location: 0.2 MI W. AMHERST T.L. (Lat: 42.824739,  Lng: -71.617281),  Route carried "on" structure: State highway 101,  Year Built: 1971,  Status: Open,  Structure Length: 10.36m (33.99ft),  Average Daily Traffic: 12,745 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 18,862 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: NH101A,PAR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 64.395,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 40.5m (132.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 50.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.36m (33.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 172011200113,  Location: 1.0 MI W JCT NH 13. (Lat: 42.823517,  Lng: -71.660661),  Route carried "under" structure: City street ,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 4,000 (year 2014),  Truck Traffic: 1%,  Features Intersected: OSGOOD ROAD,  Facility Carried by Structure: NH101
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 172012800105,  Location: 1 MI S MILFORD VILLAGE (Lat: 42.817131,  Lng: -71.646119),  Route carried "under" structure: State highway 13,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2013),  Truck Traffic: 4%,  Features Intersected: NH 13,  Facility Carried by Structure: NH101
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.2m (108.9ft)

Find on map >>   Show street view

Structure Number: 172014200106,  Location: 0.8 M W AMHERST T.L. (Lat: 42.817506,  Lng: -71.633000),  Route carried "under" structure: City street ,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2013),  Features Intersected: PONEMAH HILL ROAD,  Facility Carried by Structure: NH101
Minimum Vertical Clearance: 4.48m (14.70ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 12.8m (42.0ft)

Find on map >>   Show street view

Structure Number: 172015500115,  Location: 0.2 MI W. AMHERST T.L. (Lat: 42.824739,  Lng: -71.617281),  Route carried "under" structure: State highway 101A,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 30,504 (year 2015),  Truck Traffic: 5%,  Features Intersected: NH101A,PAR,  Facility Carried by Structure: NH101
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.5m (132.9ft)