  • National Bridge Inventory (NBI) Statistics
  • 22Number of bridges
  • 305ft / 92.5mTotal length
  • $40,748,000Total costs
  • 227,393Total average daily traffic
  • 25,432Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Millbrook
  • No street view available for this location

New bridges in Millbrook, AL - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 21960-1969
  • 91970-1979
  • 11980-1989
  • 71990-1999
  • 22000-2009
Reconstructed bridges in Millbrook, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 21990-1999
Average Bridge Daily Traffic in Millbrook, AL
Average Bridge Truck Traffic in Millbrook, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 30.8%Good
  • 53.8%Satisfactory
  • 15.4%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 46.2%Good
  • 53.8%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 61.5%Good
  • 30.8%Satisfactory
  • 7.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.3%Very good
  • 56.3%Good
  • 37.5%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 83.3%Good
  • 16.7%Satisfactory
Find on map >>   Show street view

Structure Number: 572,  Location: SEC 9 T17N R17E (Lat: 32.475300,  Lng: -86.369367),  Route carried "on" structure: City street ,  Year Built: 1972,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 4,855 (year 2014),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,599 (year 2034),  Design Load: H 15,  Features Intersected: STILL CREEK,  Facility Carried by Structure: CO RD NO 23
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.81m (12.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $915,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $1,007,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1704,  Location: 2 MI NE SAXON X ROADS (Lat: 33.436200,  Lng: -85.317100),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 100 (year 1997),  Average Future Daily Traffic: 150 (year 2035),  Design Load: HS 20,  Features Intersected: SHOAL CREEK,  Facility Carried by Structure: CO RD 463
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 1888,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 22.2m (72.8ft),  Out-to-Out Width: 27.4m (89.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 64.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.76m (9.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,275,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $1,403,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 2892,  Location: .2MI N OF AL 14 (Lat: 32.500000,  Lng: -86.383333),  Route carried "on" structure: County highway ,  Year Built: 1994,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 300 (year 1998),  Truck Traffic: 7%,  Average Future Daily Traffic: 300 (year 2029),  Design Load: HS 20,  Features Intersected: HALLS MILL CREEK,  Facility Carried by Structure: OLD PRATTVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 66.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.81m (12.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $784,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $862,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 7872,  Location: 400' W of AL143/Main St. (Lat: 32.476700,  Lng: -86.362000),  Route carried "on" structure: City street ,  Year Built: 1963,  Status: Posted for load,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 518 (year 2014),  Truck Traffic: 1%,  Average Future Daily Traffic: 811 (year 2034),  Design Load: H 15,  Features Intersected: HUDSON CREEK,  Facility Carried by Structure: Grandview Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 3.15m (10.33ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2022,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $541,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $595,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 799,  Location: COUNTY LINE COMMUNITY (Lat: 32.517486,  Lng: -86.413411),  Route carried "on" structure: County highway 39,  Year Built: 1963,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 366 (year 1988),  Truck Traffic: 10%,  Average Future Daily Traffic: 375 (year 2035),  Design Load: H 10,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 46.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $437,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $481,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10682,  Location: 2.3 MI S OF AL 14 (Lat: 32.460389,  Lng: -86.387428),  Route carried "on" structure: County highway 2,  Year Built: 1972,  Status: Open,  Structure Length: 11.09m (36.38ft),  Average Daily Traffic: 8,000 (year 2009),  Truck Traffic: 3%,  Average Future Daily Traffic: 22,000 (year 2029),  Design Load: HS 20,  Features Intersected: I65,  Facility Carried by Structure: COBB'S FORD RD EBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.145,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 13 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.98m (39.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $3,449,000,  Roadway Improvement Cost: $345,000,  Total Project Cost: $3,794,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10683,  Location: I65 AND AL 14 INTERCHANGE (Lat: 32.487892,  Lng: -86.408997),  Route carried "on" structure: Interstate 65,  Year Built: 1972,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 8.66m (28.41ft),  Average Daily Traffic: 19,520 (year 2013),  Truck Traffic: 23%,  Average Future Daily Traffic: 24,730 (year 2033),  Design Load: HS 20,  Features Intersected: AL 14
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 291.702,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 11 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 17.2m (56.4ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 56.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.64m (31.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $3,901,000,  Roadway Improvement Cost: $390,000,  Total Project Cost: $4,291,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10684,  Location: I65 AND AL 14 INTERCHANGE (Lat: 32.488369,  Lng: -86.408564),  Route carried "on" structure: Interstate 65,  Year Built: 1972,  Status: Open,  Structure Length: 8.66m (28.41ft),  Average Daily Traffic: 19,520 (year 2013),  Truck Traffic: 23%,  Average Future Daily Traffic: 24,730 (year 2033),  Design Load: HS 20,  Features Intersected: AL 14
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 291.702,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 11 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 17.2m (56.4ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 56.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.64m (31.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $3,901,000,  Roadway Improvement Cost: $390,000,  Total Project Cost: $4,291,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10718,  Location: 800' W of AL143/Main St (Lat: 32.478167,  Lng: -86.363617),  Route carried "on" structure: City street ,  Year Built: 1972,  Status: Posted for load,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 5,288 (year 2014),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,323 (year 2034),  Design Load: H 15,  Features Intersected: HUDSON CREEK,  Facility Carried by Structure: Edgewood Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 33.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.15m (10.33ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2022,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $584,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $642,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10748,  Location: 1.9 MI.E.OF I-65 (Lat: 32.506311,  Lng: -86.384417),  Route carried "on" structure: State highway 14,  Year Built: 1972,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 25,830 (year 2013),  Truck Traffic: 3%,  Average Future Daily Traffic: 34,789 (year 2033),  Design Load: HS 20,  Features Intersected: HUDSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 256.605,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.69m (8.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,274,000,  Roadway Improvement Cost: $127,000,  Total Project Cost: $1,401,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13786,  Location: 700' W of AL143/Main St (Lat: 32.489050,  Lng: -86.367767),  Route carried "on" structure: City street ,  Year Built: 1954,  Year Reconstructed: 1986,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 881 (year 2014),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,394 (year 2034),  Design Load: H 15,  Features Intersected: HUDSON CREEK,  Facility Carried by Structure: ROSE HILL RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.0m,  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 33.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2022,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $340,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $374,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 14803,  Location: SEC 5 717N R17E (Lat: 32.521667,  Lng: -86.386667),  Route carried "on" structure: County highway ,  Year Built: 1989,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 38 (year 1998),  Average Future Daily Traffic: 42 (year 2031),  Features Intersected: STILL CREEK SPUR,  Facility Carried by Structure: Wolf Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.48m (4.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $203,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $223,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1704,  Location: 0.2 MI S OF AL 143 (Lat: 32.483333,  Lng: -86.350000),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 5,200 (year 1998),  Truck Traffic: 20%,  Average Future Daily Traffic: 4,000 (year 2031),  Design Load: HS 20,  Features Intersected: NO NAME BRANCH,  Facility Carried by Structure: ALA RIVER PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 19.9m (65.3ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 19.2m (63.0ft),  Out-to-Out Width: 19.9m (65.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,087,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,196,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17329,  Location: 3.2 MI E OF CR143/MAIN ST (Lat: 32.435017,  Lng: -86.317300),  Route carried "on" structure: Alternate Other road ,  Year Built: 1998,  Status: Open,  Structure Length: 30.94m (101.51ft),  Average Daily Traffic: 4,620 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,930 (year 2040),  Design Load: HS 20,  Features Intersected: ALABAMA RIVER,  Facility Carried by Structure: AL RIVER PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Toll: Toll bridge,  Owner: Private,  Approaching Roadway Width: 18.3m (60.0ft),  Navigation Control: Yes ( Vertical Clearance: 11.1m (36.4ft), Horizontal Clearance: 62.5m (205.1ft)),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 5,  Length of Maximum Span: 65.5m (214.9ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 73.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 30.94m (101.51ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: October 2020,  Underwater Inspection Date: October 2018,  Bridge Improvement Cost: $13,366,000,  Roadway Improvement Cost: $1,337,000,  Total Project Cost: $14,703,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18973,  Location: 1.5 MILES N OF ST-14 (Lat: 32.516667,  Lng: -86.383333),  Route carried "on" structure: County highway 141,  Year Built: 2000,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 150 (year 2000),  Average Future Daily Traffic: 200 (year 2031),  Features Intersected: MILL CREEK,  Facility Carried by Structure: Gunnells Road
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.5m (24.6ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 48.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $314,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $345,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19144,  Location: 2.6M NORTH OF AL 14 (Lat: 32.913333,  Lng: -86.663611),  Route carried "on" structure: County highway 7,  Year Built: 2004,  Status: Open,  Structure Length: 7.53m (24.70ft),  Average Daily Traffic: 12,776 (year 2001),  Truck Traffic: 18%,  Average Future Daily Traffic: 10,000 (year 2031),  Design Load: HS 20,  Features Intersected: KENNER CREEK,  Facility Carried by Structure: DEATSVILLE HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 62.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.55m (28.05ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,759,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $1,935,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 20416,  Location: SEC 17 T17N R15E (Lat: 32.457975,  Lng: -86.350486),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 4,830 (year 2010),  Average Future Daily Traffic: 7,180 (year 2031),  Design Load: HS 20,  Features Intersected: ????????????????????????,  Facility Carried by Structure: Cossada Parkway
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 69.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $497,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $547,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21437,  Location: ????????????????????????? (Lat: 32.457222,  Lng: -86.374172),  Route carried "on" structure: County highway ,  Year Built: 1999,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 2,941 (year 2013),  Average Future Daily Traffic: 6,800 (year 2037),  Design Load: HS 20,  Features Intersected: Steel Creek,  Facility Carried by Structure: Cobbs Ford Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,556,000,  Roadway Improvement Cost: $156,000,  Total Project Cost: $1,712,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21438,  Location: ????????????????????????? (Lat: 32.454928,  Lng: -86.363058),  Route carried "on" structure: County highway ,  Year Built: 1999,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 5,580 (year 2013),  Truck Traffic: 12%,  Average Future Daily Traffic: 6,800 (year 2023),  Design Load: HS 20,  Features Intersected: Mill Creek,  Facility Carried by Structure: Cobbs Ford Road
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 46.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $860,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $946,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10682,  Location: 2.3 MI S OF AL 14 (Lat: 32.460389,  Lng: -86.387428),  Route carried "under" structure: Interstate 65,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 49,980 (year 2013),  Truck Traffic: 16%,  Features Intersected: I65,  Facility Carried by Structure: COBB'S FORD RD EBL
Minimum Vertical Clearance: 6.74m (22.11ft),  Kilometerpoint: 288.052,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 10683,  Location: I65 AND AL 14 INTERCHANGE (Lat: 32.487892,  Lng: -86.408997),  Route carried "under" structure: State highway 14,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 28,050 (year 2013),  Truck Traffic: 5%,  Features Intersected: AL 14,  Facility Carried by Structure: I65 SBL
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 253.169,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 10684,  Location: I65 AND AL 14 INTERCHANGE (Lat: 32.488369,  Lng: -86.408564),  Route carried "under" structure: State highway 14,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 28,050 (year 2013),  Truck Traffic: 5%,  Features Intersected: AL 14,  Facility Carried by Structure: I-65 NBL
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 253.174,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)