Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Montesano, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 29Number of bridges
  • 971ft / 296mTotal length
  • $140,991,000Total costs
  • 137,702Total average daily traffic
  • 10,270Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Montesano
  • No street view available for this location

New bridges in Montesano, WA - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 31950-1959
  • 71960-1969
  • 71970-1979
  • 21980-1989
  • 21990-1999
  • 32000-2009
  • 22010-2019
  • 12020-2022
Average Bridge Daily Traffic in Montesano, WA
Average Bridge Truck Traffic in Montesano, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 4.5%Very good
  • 68.2%Good
  • 22.7%Satisfactory
  • 4.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.5%Very good
  • 54.5%Good
  • 27.3%Satisfactory
  • 9.1%Fair
  • 4.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 13.6%Very good
  • 50.0%Good
  • 4.5%Satisfactory
  • 22.7%Fair
  • 4.5%Poor
  • 4.5%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 36.0%Very good
  • 40.0%Good
  • 20.0%Satisfactory
  • 4.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Very good
  • 25.0%Good
  • 25.0%Satisfactory
Find on map >>   Show street view

Structure Number: 1949A,  Location: 8.3 E JCT US 101 (Lat: 46.976583,  Lng: -123.643944),  Route carried "on" structure: US 12,  Year Built: 1935,  Status: Open,  Structure Length: 8.72m (28.61ft),  Average Daily Traffic: 20,345 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 23,274 (year 2039),  Design Load: H 15,  Features Intersected: WYNOOCHEE RIVER
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 13.406,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 61.0m (200.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.72m (28.61ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $3,546,000,  Roadway Improvement Cost: $709,000,  Total Project Cost: $7,093,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 4381A,  Location: 7.6 N JCT US 101 (Lat: 46.970306,  Lng: -123.601306),  Route carried "on" structure: State highway 107,  Year Built: 1953,  Status: Open,  Structure Length: 9.36m (30.71ft),  Average Daily Traffic: 4,341 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 4,966 (year 2039),  Design Load: HS 15,  Features Intersected: SLOUGH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.199,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 16,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.36m (30.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,026,000,  Roadway Improvement Cost: $405,000,  Total Project Cost: $4,052,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4381B,  Location: 7.8 N JCT US 101 (Lat: 46.972972,  Lng: -123.600972),  Route carried "on" structure: State highway 107,  Year Built: 1953,  Status: Open,  Structure Length: 8.50m (27.89ft),  Average Daily Traffic: 4,341 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 4,966 (year 2039),  Design Load: HS 15,  Features Intersected: SLOUGH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.521,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 15,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.50m (27.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,730,000,  Roadway Improvement Cost: $346,000,  Total Project Cost: $3,460,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5827A,  Location: 6.9 N JCT US 101 (Lat: 46.959611,  Lng: -123.603111),  Route carried "on" structure: State highway 107,  Year Built: 1958,  Year Reconstructed: 2021,  Status: Open,  Structure Length: 39.93m (131.00ft),  Average Daily Traffic: 4,002 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 4,578 (year 2039),  Design Load: HS 20,  Features Intersected: CHEHALIS RIVER
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 10.976,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Navigation Control: Yes ( Vertical Clearance: 4.6m (15.1ft), Horizontal Clearance: 30.5m (100.1ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 6,  Length of Maximum Span: 91.4m (299.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 39.93m (131.00ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $8,384,000,  Roadway Improvement Cost: $1,677,000,  Total Project Cost: $16,768,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8172A,  Location: 9.7 E JCT US 101 (Lat: 46.973667,  Lng: -123.614889),  Route carried "on" structure: US 12,  Year Built: 1968,  Status: Open,  Structure Length: 33.71m (110.60ft),  Average Daily Traffic: 10,656 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 12,190 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SYLVIA CR NP RY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.530,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 14,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 33.71m (110.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $7,742,000,  Roadway Improvement Cost: $1,548,000,  Total Project Cost: $15,484,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8172B,  Location: 9.7 E JCT US 101 (Lat: 46.973322,  Lng: -123.612453),  Route carried "on" structure: US 12,  Year Built: 1968,  Status: Open,  Structure Length: 33.35m (109.42ft),  Average Daily Traffic: 10,656 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 12,190 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SYLVIA CR NP RY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.530,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 14,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 23.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 33.35m (109.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $7,658,000,  Roadway Improvement Cost: $1,532,000,  Total Project Cost: $15,316,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8374A,  Location: 10.3 E JCT US 101 (Lat: 46.974364,  Lng: -123.604722),  Route carried "on" structure: US 12,  Year Built: 1969,  Status: Open,  Structure Length: 61.20m (200.79ft),  Average Daily Traffic: 8,329 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 9,528 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 107, RR, FLOOD PLAIN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.480,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 20,  Length of Maximum Span: 34.7m (113.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 15.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 12.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 61.20m (200.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $16,064,000,  Roadway Improvement Cost: $3,213,000,  Total Project Cost: $32,128,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8374B,  Location: 10.3 E JCT US 101 (Lat: 46.974531,  Lng: -123.604833),  Route carried "on" structure: US 12,  Year Built: 1969,  Status: Open,  Structure Length: 60.69m (199.11ft),  Average Daily Traffic: 8,329 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 9,528 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 107, RR, FLOOD PLAIN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.480,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 20,  Length of Maximum Span: 34.7m (113.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 21.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 60.69m (199.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $15,928,000,  Roadway Improvement Cost: $3,186,000,  Total Project Cost: $31,856,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 13795A,  Location: 9.5 E JCT US 101 (Lat: 46.975194,  Lng: -123.621694),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 7.53m (24.70ft),  Average Daily Traffic: 2,917 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,751 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: US 12,  Facility Carried by Structure: DEVONSHIRE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 37.5m (123.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.53m (24.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,075,000,  Roadway Improvement Cost: $415,000,  Total Project Cost: $4,150,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19211A,  Location: 9.1 E JCT US 101 (Lat: 46.976581,  Lng: -123.628194),  Route carried "on" structure: US 12,  Year Built: 2018,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 20,345 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 23,274 (year 2039),  Design Load: HL 93,  Features Intersected: UNNAMED TRIBUTARY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.597,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $475,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $950,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 80176,  Location: 0.2 S JCT MONTE ELMA (Lat: 46.983611,  Lng: -123.562222),  Route carried "on" structure: County highway 70900,  Year Built: 1979,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 50 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 60 (year 2039),  Design Load: HS 15,  Features Intersected: CAMP CREEK,  Facility Carried by Structure: OLD BEACON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 3.5m (11.5ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $240,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $464,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 80886,  Location: 0.4 S JCT 6292 (Lat: 46.975972,  Lng: -123.564681),  Route carried "on" structure: County highway 62790,  Year Built: 1978,  Status: Open,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 25 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 35 (year 2038),  Design Load: HS 15,  Features Intersected: SMITH CANAL,  Facility Carried by Structure: SCHAFER BOOM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Serious,  Channel: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $800,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $1,746,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 80953,  Location: 02.3 N JCT 9725 (Lat: 47.064444,  Lng: -123.553333),  Route carried "on" structure: County highway 73230,  Year Built: 1971,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 184 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 275 (year 2039),  Design Load: HS 15,  Features Intersected: STILL CREEK,  Facility Carried by Structure: WEST SATSOP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,360,000,  Roadway Improvement Cost: $204,000,  Total Project Cost: $2,500,000 ( Estimate for 2015),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 81371,  Location: 00.4 E JCT SR 12 (Lat: 46.977222,  Lng: -123.616111),  Route carried "on" structure: County highway 97100,  Year Built: 1935,  Status: Posted for load,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 4,129 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,038 (year 2038),  Features Intersected: SYLVIA CREEK,  Facility Carried by Structure: PIONEER AVE W
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Poor,  Channel: Good,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,216,000,  Roadway Improvement Cost: $243,000,  Total Project Cost: $2,432,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 81774,  Location: 03.8 NE JCT 9519 (Lat: 47.042778,  Lng: -123.649722),  Route carried "on" structure: County highway 58310,  Year Built: 1981,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 174 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 269 (year 2038),  Design Load: HS 20,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: BLACK CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8301,  Location: 12.2 N JCT SR12 (Lat: 47.116389,  Lng: -123.656667),  Route carried "on" structure: County highway 95190,  Year Built: 1965,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 335 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 498 (year 2038),  Design Load: HS 15,  Features Intersected: ANDERSON CREEK,  Facility Carried by Structure: WYNOOCHE VALLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 83123,  Location: 02.5 NE JCT 9519 (Lat: 47.029028,  Lng: -123.634583),  Route carried "on" structure: County highway 58310,  Year Built: 1976,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 127 (year 2018),  Truck Traffic: 15%,  Average Future Daily Traffic: 155 (year 2038),  Design Load: HS 15,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: BLACK CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8313,  Location: 02.9 NE JCT 9519 (Lat: 47.033611,  Lng: -123.639167),  Route carried "on" structure: County highway 58310,  Year Built: 1977,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 179 (year 2018),  Truck Traffic: 28%,  Average Future Daily Traffic: 266 (year 2038),  Design Load: HS 15,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: BLACK CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 83228,  Location: 02.0 NE JCT 9519 (Lat: 47.027222,  Lng: -123.625000),  Route carried "on" structure: County highway 58310,  Year Built: 1976,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 188 (year 2018),  Truck Traffic: 15%,  Average Future Daily Traffic: 229 (year 2038),  Design Load: HS 15,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: BLACK CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 83477,  Location: 00.5 NE JCT 9519 (Lat: 47.015278,  Lng: -123.645278),  Route carried "on" structure: County highway 58310,  Year Built: 1982,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 320 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 475 (year 2038),  Design Load: HS 20,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: BLACK CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 86471,  Location: LAKE SYLVIA STATE PARK (Lat: 46.996322,  Lng: -123.593736),  Route carried "on" structure: State lands road 45000,  Year Built: 1976,  Status: Open,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 1,000 (year 2012),  Average Future Daily Traffic: 1,072 (year 2036),  Design Load: HS 15,  Features Intersected: LAKE SYLVIA,  Facility Carried by Structure: PARK ENTRANCE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.527,  Lanes on structure: 2,  Owner: State Park, Forest, or Reservation Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Very good,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.58m (21.59ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Underwater Inspection Date: June 2018,  Bridge Improvement Cost: $1,296,000,  Roadway Improvement Cost: $259,000,  Total Project Cost: $2,592,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 87237,  Location: WEST WYNOOCHEE AVE (Lat: 46.976583,  Lng: -123.613806),  Route carried "on" structure: City street 795,  Year Built: 2005,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 100 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 110 (year 2038),  Design Load: HL 93,  Features Intersected: SYLVIA CREEK,  Facility Carried by Structure: WEST WYNOOCHEE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 71.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8797,  Location: 24.23 MILES N. SR12 (Lat: 47.257917,  Lng: -123.614861),  Route carried "on" structure: County highway 95190,  Year Built: 2003,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 259 (year 2018),  Truck Traffic: 30%,  Average Future Daily Traffic: 385 (year 2038),  Features Intersected: (UNNAMED TRIBUTARY),  Facility Carried by Structure: WYNOOCHE VALLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020
Find on map >>   Show street view

Structure Number: 87972,  Location: 26.0 MILES N. SR12 (Lat: 47.277500,  Lng: -123.628889),  Route carried "on" structure: County highway 95190,  Year Built: 2008,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 313 (year 2018),  Truck Traffic: 30%,  Average Future Daily Traffic: 385 (year 2038),  Features Intersected: NEIL CREEK,  Facility Carried by Structure: WYNOOCHE VALLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 87.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020
Find on map >>   Show street view

Structure Number: 88789,  Location: 2.2 MILES E JCT SR 107 (Lat: 46.963611,  Lng: -123.563889),  Route carried "on" structure: County highway 62260,  Year Built: 2015,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 41 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 65 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: STEVENS CREEK,  Facility Carried by Structure: MINKLER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: 89265,  Location: 0.25 East Reecer Creek Rd (Lat: 47.020689,  Lng: -123.565325),  Route carried "on" structure: County highway 93075,  Year Built: 2020,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 2,217 (year 2018),  Truck Traffic: 20%,  Average Future Daily Traffic: 5,875 (year 2038),  Design Load: HL 93,  Features Intersected: Whiskey Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.5m (18.0ft),  Curb or Sidewalk Widths: Left: 6.1m (20.0ft),  Right: 0.0m,  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Very good,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 8374A,  Location: 7.9 N JCT US 101 (Lat: 46.974364,  Lng: -123.604722),  Route carried "under" structure: State highway 107,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 7,103 (year 2019),  Truck Traffic: 7%,  Features Intersected: SR 107, RR, FLOOD PLAIN,  Facility Carried by Structure: US 12
Minimum Vertical Clearance: 7.32m (24.02ft),  Kilometerpoint: 12.794,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 8374B,  Location: 7.9 N JCT US 101 (Lat: 46.974531,  Lng: -123.604833),  Route carried "under" structure: State highway 107,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 7,103 (year 2019),  Truck Traffic: 7%,  Features Intersected: SR 107, RR, FLOOD PLAIN,  Facility Carried by Structure: US 12
Minimum Vertical Clearance: 7.14m (23.43ft),  Kilometerpoint: 12.826,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 13795A,  Location: 9.5 E JCT US 101 (Lat: 46.975194,  Lng: -123.621694),  Route carried "under" structure: US 12,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 19,594 (year 2019),  Truck Traffic: 7%,  Features Intersected: US 12,  Facility Carried by Structure: DEVONSHIRE ROAD
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 15.144,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.5m (123.0ft)

Discuss Montesano, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.