  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 62ft / 19.3mTotal length
  • $17,383,000Total costs
  • 15,470Total average daily traffic
  • 548Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Mount Hope
  • No street view available for this location

New bridges in Mount Hope, NY - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11920-1929
  • 11950-1959
  • 21960-1969
  • 21980-1989
  • 21990-1999
  • 22010-2019
  • 12020-2022
Average Bridge Daily Traffic in Mount Hope, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 30.0%Very good
  • 10.0%Good
  • 50.0%Fair
  • 10.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Excellent
  • 20.0%Very good
  • 20.0%Good
  • 10.0%Satisfactory
  • 30.0%Fair
  • 10.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.0%Excellent
  • 10.0%Very good
  • 10.0%Good
  • 30.0%Satisfactory
  • 40.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 11.1%Good
  • 77.8%Satisfactory
  • 11.1%Fair
Find on map >>   Show street view

Structure Number: 222327,  Location: 1.9 MILES NE OF HUGOENOT (Lat: 41.426717,  Lng: -74.596814),  Route carried "on" structure: Other road ,  Year Built: 1999,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 456 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 638 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: MNRR PJ LINE,  Facility Carried by Structure: GUYMARD TURNPIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.218,  Lanes on structure: 2,  Owner: Railroad,  Maintenance Responsibility: Town or Township Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.5m (60.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 98.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,610,000,  Roadway Improvement Cost: $943,000,  Total Project Cost: $2,553,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 226212,  Location: 1.5 MI NW OF HOWELLS (Lat: 41.497639,  Lng: -74.479733),  Route carried "on" structure: Other road ,  Year Built: 1927,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 368 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 515 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: SHAWANGUNK KILL,  Facility Carried by Structure: SPRUCE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 68.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $528,000,  Roadway Improvement Cost: $309,000,  Total Project Cost: $837,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33449,  Location: .9 MILE NW OF HOWELLS (Lat: 41.488744,  Lng: -74.479008),  Route carried "on" structure: County highway ,  Year Built: 1969,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 6.04m (19.82ft),  Average Daily Traffic: 1,365 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,688 (year 2040),  Design Load: HS 20,  Features Intersected: Metro North Railroad Por,  Facility Carried by Structure: NEW VERNON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.043,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.8m (74.8ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.03m (19.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $3,141,000,  Roadway Improvement Cost: $1,840,000,  Total Project Cost: $4,981,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 334492,  Location: 1.6 MILES SE OF OTISVILLE (Lat: 41.450006,  Lng: -74.526989),  Route carried "on" structure: County highway ,  Year Built: 2019,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 2,869 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,549 (year 2040),  Features Intersected: SHAWANGUNK KILL,  Facility Carried by Structure: MOUNT HOPE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.089,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $714,000,  Roadway Improvement Cost: $418,000,  Total Project Cost: $1,132,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 334493,  Location: 1.5 MILES NW OF HOWELLS (Lat: 41.496114,  Lng: -74.482925),  Route carried "on" structure: County highway ,  Year Built: 1985,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 1,155 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,429 (year 2040),  Features Intersected: SHAWANGUNK KILL,  Facility Carried by Structure: NEW VERNON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.073,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.4m (40.7ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,030,000,  Roadway Improvement Cost: $603,000,  Total Project Cost: $1,633,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334496,  Location: 2.1 MI S OF OTISVILLE (Lat: 41.441283,  Lng: -74.529900),  Route carried "on" structure: County highway ,  Year Built: 1994,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 302 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 423 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SHAWANGUNK KILL,  Facility Carried by Structure: GUYMARD TURNPIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 89.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 69.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $670,000,  Roadway Improvement Cost: $392,000,  Total Project Cost: $1,062,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334497,  Location: 1.5 MILES WEST OF HOWELLS (Lat: 41.479956,  Lng: -74.495644),  Route carried "on" structure: Other road ,  Year Built: 2020,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 279 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 391 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SHAWANGUNK KILL,  Facility Carried by Structure: CARBOY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.110,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $606,000,  Roadway Improvement Cost: $355,000,  Total Project Cost: $961,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334498,  Location: 3.6 MILES SW OF OTISVILLE (Lat: 41.422017,  Lng: -74.560808),  Route carried "on" structure: Other road ,  Year Built: 1959,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 337 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 416 (year 2040),  Design Load: H 20,  Features Intersected: SHAWANGUNK KILL,  Facility Carried by Structure: KOHLER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.237,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $677,000,  Roadway Improvement Cost: $396,000,  Total Project Cost: $1,073,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334499,  Location: 3.9 MI SW BLOOMINGBURGH (Lat: 41.500956,  Lng: -74.459381),  Route carried "on" structure: Other road ,  Year Built: 1965,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 708 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 991 (year 2040),  Design Load: H 20,  Features Intersected: LITTLE SHAWANGUNK KILL,  Facility Carried by Structure: PINE GROVE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.039,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 59.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 46.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $929,000,  Roadway Improvement Cost: $544,000,  Total Project Cost: $1,473,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 336752,  Location: 0.6 MI W CR18 (Lat: 41.486589,  Lng: -74.489258),  Route carried "on" structure: Other road ,  Year Built: 1982,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 708 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 991 (year 2040),  Design Load: HS 20,  Features Intersected: SHAWANGUNK KILL,  Facility Carried by Structure: SHODDY HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.103,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 47.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $853,000,  Roadway Improvement Cost: $499,000,  Total Project Cost: $1,352,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 337122,  Location: 0.8MI SE Jct Ledge Rd+NV (Lat: 41.482253,  Lng: -74.470139),  Route carried "on" structure: County highway ,  Year Built: 2015,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,365 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,688 (year 2040),  Design Load: HL 93,  Features Intersected: Little Shawangunk Kill,  Facility Carried by Structure: New Vernon Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.014,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $206,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $326,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 704092,  Location: .6 MILE EAST OF OTISVILLE (Lat: 41.471586,  Lng: -74.528086),  Route carried "under" structure: State highway 211,  Year Built: 1900,  Structure Length: 0. m,  Average Daily Traffic: 5,558 (year 2002),  Features Intersected: RTE 211,  Facility Carried by Structure: MNRR PJ LINE
Minimum Vertical Clearance: 3.86m (12.66ft),  Kilometerpoint: 6.854,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 8.2m (26.9ft)