Bridge Statistics for Naselle, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 161ft / 49.1mTotal length
  • $25,541,000Total costs
  • 22,653Total average daily traffic
  • 2,233Total average daily truck traffic
  • 28,265Total future (year 2039) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Naselle
  • No street view available for this location

New bridges in Naselle, WA - historical statistics
  • New bridges - historical statistics
  • 31950-1959
  • 41960-1969
  • 11970-1979
  • 41980-1989
  • 11990-1999
  • 12010-2019
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.7%Very good
  • 61.5%Good
  • 23.1%Satisfactory
  • 7.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 15.4%Very good
  • 46.2%Good
  • 30.8%Satisfactory
  • 7.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.7%Very good
  • 76.9%Good
  • 7.7%Satisfactory
  • 7.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 28.6%Very good
  • 35.7%Good
  • 35.7%Satisfactory
Find on map >>   Show street view

Structure Number: 4271A,  Location: 11.4 N JCT US 101 (Lat: 46.366667,  Lng: -123.810639),  Route carried "on" structure: State highway 401,  Year Built: 1953,  Status: Open,  Structure Length: 6.77m (22.21ft),  Average Daily Traffic: 3,012 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,662 (year 2039),  Design Load: HS 15,  Features Intersected: NASELLE R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.298,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 22.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.77m (22.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,954,000,  Roadway Improvement Cost: $391,000,  Total Project Cost: $3,907,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5871A,  Location: 6.9 N JCT US 101 (Lat: 46.308528,  Lng: -123.800917),  Route carried "on" structure: State highway 401,  Year Built: 1958,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 2,940 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,575 (year 2039),  Design Load: HS 20,  Features Intersected: BEAN CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.056,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.14m (10.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $865,000,  Roadway Improvement Cost: $173,000,  Total Project Cost: $1,730,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5871B,  Location: 9.6 N JCT US 101 (Lat: 46.342278,  Lng: -123.813750),  Route carried "on" structure: State highway 401,  Year Built: 1958,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 2,588 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,147 (year 2039),  Design Load: HS 20,  Features Intersected: DAVIS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.450,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 35.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.35m (7.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $616,000,  Roadway Improvement Cost: $123,000,  Total Project Cost: $1,232,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7360A,  Location: 11.6 N JCT US 101 (Lat: 46.369419,  Lng: -123.808022),  Route carried "on" structure: State highway 401,  Year Built: 1964,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 3,012 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,662 (year 2039),  Design Load: HS 20,  Features Intersected: NASELLE RIVER OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.652,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,600,000,  Roadway Improvement Cost: $320,000,  Total Project Cost: $3,200,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7360B,  Location: 12.0 N JCT US 101 (Lat: 46.373611,  Lng: -123.803611),  Route carried "on" structure: State highway 401,  Year Built: 1964,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 3,012 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,662 (year 2039),  Design Load: HS 20,  Features Intersected: NASELLE R OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.232,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.08m (10.10ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2018,  Bridge Improvement Cost: $808,000,  Roadway Improvement Cost: $162,000,  Total Project Cost: $1,616,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 13040A,  Location: 1.3 E JCT SR 401 (Lat: 46.368125,  Lng: -123.780583),  Route carried "on" structure: State highway 4,  Year Built: 1987,  Status: Open,  Structure Length: 6.13m (20.11ft),  Average Daily Traffic: 2,272 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,762 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: NASELLE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.753,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.13m (20.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,528,000,  Roadway Improvement Cost: $306,000,  Total Project Cost: $3,055,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 13040B,  Location: 2.4 E JCT SR 401 (Lat: 46.359319,  Lng: -123.763028),  Route carried "on" structure: State highway 4,  Year Built: 1986,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 2,272 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,762 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SALMON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.442,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $836,000,  Roadway Improvement Cost: $167,000,  Total Project Cost: $1,672,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 200503,  Location: 3.1 E JCT US 101 (Lat: 46.390903,  Lng: -123.827361),  Route carried "on" structure: State highway 4,  Year Built: 2015,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 2,462 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,993 (year 2039),  Design Load: HS 20,  Features Intersected: PETES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.005,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $486,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $973,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 80718,  Location: 1.0 S JCT 4 & 401 (Lat: 46.364611,  Lng: -123.809778),  Route carried "on" structure: County highway 91280,  Year Built: 1965,  Status: Posted for load,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 352 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 550 (year 2039),  Design Load: HS 15,  Features Intersected: SO FORK NASELLE RIVER,  Facility Carried by Structure: SO VALLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 26.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $720,000,  Roadway Improvement Cost: $144,000,  Total Project Cost: $1,440,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 80834,  Location: 1.3 SW JCT 4 & 401 (Lat: 46.367833,  Lng: -123.821361),  Route carried "on" structure: County highway 91190,  Year Built: 1972,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 145 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 300 (year 2039),  Design Load: HS 20,  Features Intersected: DELL CREEK,  Facility Carried by Structure: PARPALA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $360,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $720,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 81115,  Location: 1.7 SW JCT 4 & 401 (Lat: 46.364639,  Lng: -123.781111),  Route carried "on" structure: County highway 91280,  Year Built: 1986,  Status: Open,  Structure Length: 4.82m (15.81ft),  Average Daily Traffic: 213 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 400 (year 2039),  Design Load: HS 20,  Features Intersected: SALMON CREEK,  Facility Carried by Structure: SOUTH VALLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.82m (15.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $948,000,  Roadway Improvement Cost: $190,000,  Total Project Cost: $1,896,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 81446,  Location: 2.9 E JCT 4 & 401 (Lat: 46.373389,  Lng: -123.747583),  Route carried "on" structure: County highway 91280,  Year Built: 1984,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 140 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 300 (year 2039),  Design Load: HS 20,  Features Intersected: DOG CREEK,  Facility Carried by Structure: NORTH VALLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $403,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $806,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8269,  Location: 0.37 N JCT SR 401 (Lat: 46.342583,  Lng: -123.812583),  Route carried "on" structure: County highway 17690,  Year Built: 1963,  Status: Posted for load,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 185 (year 2020),  Average Future Daily Traffic: 400 (year 2039),  Design Load: H 15,  Features Intersected: DAVIS CREEK,  Facility Carried by Structure: KNAPPTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Poor,  Channel: Good,  Operating Rating: 16.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $897,000,  Roadway Improvement Cost: $179,000,  Total Project Cost: $1,794,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 86215,  Location: 0.74 E JCT 401 (Lat: 46.346861,  Lng: -123.811250),  Route carried "on" structure: County highway 17520,  Year Built: 1996,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 48 (year 2021),  Average Future Daily Traffic: 90 (year 2039),  Design Load: HS 20,  Features Intersected: SO FORK NASELLE RIVER,  Facility Carried by Structure: NYBERG ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 7 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.81m (12.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $750,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $1,500,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing