Bridge Statistics for New Castle, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 18Number of bridges
  • 135ft / 41.0mTotal length
  • $43,889,000Total costs
  • 190,245Total average daily traffic
  • 3,246Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for New Castle
  • No street view available for this location

New bridges in New Castle, NY - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 71930-1939
  • 71960-1969
  • 32010-2019
Reconstructed bridges in New Castle, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 11990-1999
Average Bridge Daily Traffic in New Castle, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 28.6%Good
  • 57.1%Satisfactory
  • 14.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Excellent
  • 20.0%Very good
  • 30.0%Satisfactory
  • 30.0%Fair
  • 10.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.0%Very good
  • 20.0%Good
  • 40.0%Satisfactory
  • 30.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.0%Very good
  • 60.0%Satisfactory
  • 20.0%Fair
Find on map >>   Show street view

Structure Number: 1036121,  Location: JCT TSP&RTE 100 (Lat: 41.184964,  Lng: -73.807378),  Route carried "on" structure: Other road 987G,  Year Built: 1968,  Status: Open,  Structure Length: 7.74m (25.39ft),  Truck Traffic: 2%,  Design Load: HS 20,  Features Intersected: RTE 100
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.401,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.3m (128.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.74m (25.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $4,426,000,  Roadway Improvement Cost: $2,592,000,  Total Project Cost: $7,018,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1036122,  Location: JCT TSP & RTE 100 (Lat: 41.185167,  Lng: -73.807103),  Route carried "on" structure: Other road 987G,  Year Built: 1968,  Status: Open,  Structure Length: 7.16m (23.49ft),  Truck Traffic: 2%,  Design Load: HS 20,  Features Intersected: RTE 100
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.401,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 37.5m (123.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 30.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.16m (23.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $4,118,000,  Roadway Improvement Cost: $2,412,000,  Total Project Cost: $6,530,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 103735,  Location: 3.8 MI N JCT SH120 & US 1 (Lat: 41.158825,  Lng: -73.774244),  Route carried "on" structure: State highway 120,  Year Built: 2010,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 8,234 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 10,002 (year 2040),  Features Intersected: RAILROAD STREET, MNRR HA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.588,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: Railroad,  Maintenance Responsibility: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.1m (79.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 18.2m (59.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.32m (14.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $4,417,000,  Roadway Improvement Cost: $2,587,000,  Total Project Cost: $7,003,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103736,  Location: JCT. RTE. 120 & SMRP (Lat: 41.159067,  Lng: -73.774639),  Route carried "on" structure: State highway 120,  Year Built: 1930,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 5,130 (year 2015),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,231 (year 2040),  Design Load: H 20,  Features Intersected: 987D 987D87012152 SB, RT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.668,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.3m (56.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 55.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,623,000,  Roadway Improvement Cost: $951,000,  Total Project Cost: $2,574,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 103774,  Location: 0.3 MI W JCT RTS 117+5MRP (Lat: 41.208286,  Lng: -73.740858),  Route carried "on" structure: State highway 133,  Year Built: 1931,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 6,792 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 8,250 (year 2040),  Design Load: H 20,  Features Intersected: KISCO RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.582,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $730,000,  Roadway Improvement Cost: $427,000,  Total Project Cost: $1,157,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 105336,  Location: .5 MI S JCT SH 100 & TSP (Lat: 41.177794,  Lng: -73.811878),  Route carried "on" structure: State highway 100,  Year Built: 1967,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 5,838 (year 2016),  Truck Traffic: 12%,  Average Future Daily Traffic: 7,092 (year 2040),  Design Load: H 20,  Features Intersected: POCANTICO RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.824,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.4m (66.9ft),  Skew: 26 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $509,000,  Roadway Improvement Cost: $298,000,  Total Project Cost: $806,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226522,  Location: 2 MILES NW OF MOUNT KISCO (Lat: 41.234619,  Lng: -73.748444),  Route carried "on" structure: County highway ,  Year Built: 1904,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 2,523 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,121 (year 2040),  Design Load: HS 20,  Features Intersected: KISCO RIVER,  Facility Carried by Structure: COUNTY ROAD 1323
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.416,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Inventory Rating: 75.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,988,000,  Roadway Improvement Cost: $1,164,000,  Total Project Cost: $3,153,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5500919,  Location: 4.4 MI N JCT RTS SMRP+TSP (Lat: 41.159861,  Lng: -73.774089),  Route carried "on" structure: Other road 987D,  Year Built: 1931,  Year Reconstructed: 1947,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 28,444 (year 2013),  Truck Traffic: 2%,  Average Future Daily Traffic: 40,125 (year 2040),  Features Intersected: HUNTS LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.952,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 14.7m (48.2ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 61.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 25.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,606,000,  Roadway Improvement Cost: $940,000,  Total Project Cost: $2,546,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 550092,  Location: 4.2 MI N JCT RTS SMRP&TSP (Lat: 41.172550,  Lng: -73.765033),  Route carried "on" structure: Other road 987D,  Year Built: 1931,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 28,444 (year 2013),  Truck Traffic: 2%,  Average Future Daily Traffic: 40,125 (year 2040),  Features Intersected: TRIB CHAPPAQUA BK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.607,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 70.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $957,000,  Roadway Improvement Cost: $560,000,  Total Project Cost: $1,517,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5500939,  Location: 3.5 MI W JCT SMRP & SH117 (Lat: 41.201381,  Lng: -73.740767),  Route carried "on" structure: Other road 987D,  Year Built: 2017,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 28,444 (year 2013),  Truck Traffic: 2%,  Average Future Daily Traffic: 40,125 (year 2040),  Design Load: HL 93,  Features Intersected: KISCO RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.407,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 23 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 24.2m (79.4ft)

Condition: Deck: Satisfactory,  Superstructure: Excellent,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $3,139,000,  Roadway Improvement Cost: $1,838,000,  Total Project Cost: $4,977,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 550214,  Location: .4 MI S JCT TSP & SH 134 (Lat: 41.199272,  Lng: -73.807489),  Route carried "on" structure: County highway ,  Year Built: 1968,  Status: Open,  Structure Length: 10.18m (33.40ft),  Average Daily Traffic: 1,116 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,380 (year 2040),  Design Load: HS 20,  Features Intersected: 987 G 987G87011066 NB,,  Facility Carried by Structure: PINES BRIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.878,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.18m (33.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $4,168,000,  Roadway Improvement Cost: $2,441,000,  Total Project Cost: $6,608,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1036121,  Location: JCT TSP&RTE 100 (Lat: 41.184964,  Lng: -73.807378),  Route carried "under" structure: State highway 100,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 16,124 (year 1996),  Features Intersected: RTE 100,  Facility Carried by Structure: RTE 987G
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 19.903,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: 1036122,  Location: JCT TSP & RTE 100 (Lat: 41.185167,  Lng: -73.807103),  Route carried "under" structure: State highway 100,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 17,544 (year 2002),  Features Intersected: RTE 100,  Facility Carried by Structure: RTE 987G
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 19.903,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.5m (123.0ft)

Find on map >>   Show street view

Structure Number: 103735,  Location: 3.8 MI N JCT SH120 & US 1 (Lat: 41.158825,  Lng: -73.774244),  Route carried "under" structure: Other road ,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2021),  Features Intersected: RAILROAD STREET, MNRR HA,  Facility Carried by Structure: RTE 120
Minimum Vertical Clearance: 5.72m (18.77ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.1m (79.1ft)

Find on map >>   Show street view

Structure Number: 103736,  Location: JCT. RTE. 120 & SMRP (Lat: 41.159067,  Lng: -73.774639),  Route carried "under" structure: Other road 987D,  Year Built: 1930,  Structure Length: 0. m,  Average Daily Traffic: 32,299 (year 2002),  Features Intersected: 987D 987D87012152 SB, RT,  Facility Carried by Structure: RTE 120
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 17.3m (56.8ft)

Find on map >>   Show street view

Structure Number: 5500919,  Location: 4.4 MI N JCT RTS SMRP+TSP (Lat: 41.159861,  Lng: -73.774089),  Route carried "under" structure: Other road ,  Year Built: 1931,  Structure Length: 0. m,  Features Intersected: HUNTS LANE,  Facility Carried by Structure: RTE 987D
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 11.5m (37.7ft)

Find on map >>   Show street view

Structure Number: 550214,  Location: .4 MI S JCT TSP & SH 134 (Lat: 41.199272,  Lng: -73.807489),  Route carried "under" structure: Other road 987G,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2021),  Features Intersected: 987 G 987G87011066 NB,,  Facility Carried by Structure: PINES BRIDGE ROAD
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 17.152,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 703613,  Location: .6 MI S JCT SH100 & SH134 (Lat: 41.207800,  Lng: -73.786147),  Route carried "under" structure: State highway 100,  Year Built: 1931,  Structure Length: 0. m,  Average Daily Traffic: 8,213 (year 2002),  Features Intersected: RTE 100,  Facility Carried by Structure: EX-NYCRR PUTNAM B
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 23.684,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 21.0m (68.9ft)