Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for New Columbus, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 21Number of bridges
  • 135ft / 41.2mTotal length
  • $3,087,000Total costs
  • 23,796Total average daily traffic
  • 1,925Total average daily truck traffic
  • 25,876Total future (year 2032) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for New Columbus
  • No street view available for this location

New bridges in New Columbus, PA - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 21910-1919
  • 11920-1929
  • 21940-1949
  • 21950-1959
  • 31960-1969
  • 21970-1979
  • 21980-1989
  • 11990-1999
  • 22000-2009
  • 32010-2019
Reconstructed bridges in New Columbus, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 21990-1999
  • 12000-2009
Average Bridge Daily Traffic in New Columbus, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.8%Very good
  • 29.4%Good
  • 11.8%Satisfactory
  • 11.8%Fair
  • 35.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.9%Excellent
  • 17.6%Very good
  • 17.6%Good
  • 17.6%Satisfactory
  • 5.9%Fair
  • 23.5%Poor
  • 5.9%Serious
  • 5.9%Failed
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.9%Very good
  • 11.8%Good
  • 17.6%Satisfactory
  • 35.3%Fair
  • 17.6%Poor
  • 5.9%Serious
  • 5.9%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.8%Very good
  • 23.8%Good
  • 19.0%Satisfactory
  • 9.5%Fair
  • 38.1%Poor
  • 4.8%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Very good
  • 25.0%Good
  • 25.0%Satisfactory
Find on map >>   Show street view

Structure Number: 3502,  Location: @ INTER.W/E.PALESTINE RD. (Lat: 40.824833,  Lng: -80.473469),  Route carried "on" structure: State highway 51,  Year Built: 1952,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 11,119 (year 2022),  Truck Traffic: 9%,  Average Future Daily Traffic: 11,051 (year 2032),  Design Load: HS 20,  Features Intersected: DILWORTH RUN,  Facility Carried by Structure: CONSTITUTION BL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.714,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 24 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 26.2m (86.0ft),  Out-to-Out Width: 27.4m (89.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 23839,  Location: HUNTINGTON 300' E SR 4006 (Lat: 41.190458,  Lng: -76.231958),  Route carried "on" structure: State highway 239,  Year Built: 1989,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,247 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,829 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: MILL RACE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.025,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021
Find on map >>   Show street view

Structure Number: 23841,  Location: HUNTINGTON TP .2MW SR4035 (Lat: 41.192319,  Lng: -76.271589),  Route carried "on" structure: State highway 239,  Year Built: 1928,  Status: Posted for load,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 1,238 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,719 (year 2033),  Design Load: HS 20,  Features Intersected: PINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.138,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Fair,  Channel: Poor,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $40,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $545,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 24289,  Location: HUNT TWP .2M E COLUM CNTY (Lat: 41.152203,  Lng: -76.284281),  Route carried "on" structure: State highway ,  Year Built: 1961,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 126 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 157 (year 2033),  Design Load: HS 20,  Features Intersected: PINE CREEK,  Facility Carried by Structure: SR 4008
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Poor,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $20,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $267,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 24304,  Location: NEW COLMB BO .4M W SR4011 (Lat: 41.172525,  Lng: -76.300044),  Route carried "on" structure: State highway ,  Year Built: 1940,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 507 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 632 (year 2032),  Features Intersected: TRIB TO PINE CREEK,  Facility Carried by Structure: SR 4014
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Poor,  Channel: Poor,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.60m (1.97ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $13,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $177,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 24306,  Location: NEW COLMBS BO 1M E SR4011 (Lat: 41.177492,  Lng: -76.274508),  Route carried "on" structure: State highway ,  Year Built: 1961,  Status: Posted for load,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 612 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 695 (year 2033),  Design Load: HS 20,  Features Intersected: PINE CREEK,  Facility Carried by Structure: SR 4014 ACADEMY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.897,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Poor,  Operating Rating: 23.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 0.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.60m (8.53ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $203,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 24309,  Location: FARMNT TWP 300' S SR 4013 (Lat: 41.233931,  Lng: -76.242508),  Route carried "on" structure: State highway ,  Year Built: 1972,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 525 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 698 (year 2032),  Design Load: HS 20,  Features Intersected: KITCHEN CREEK,  Facility Carried by Structure: SR4015 BETHEL HILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.746,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $6,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $79,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 24312,  Location: HUNTNGTN TP 125'E SR 4015 (Lat: 41.214039,  Lng: -76.245753),  Route carried "on" structure: State highway ,  Year Built: 1985,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 488 (year 2022),  Truck Traffic: 11%,  Average Future Daily Traffic: 632 (year 2033),  Design Load: HS 20,  Features Intersected: HUNTINGTON CREEK,  Facility Carried by Structure: SR 4016
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.131,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 24322,  Location: HUNTINGTON TP 400'N TR239 (Lat: 41.194264,  Lng: -76.238450),  Route carried "on" structure: State highway ,  Year Built: 1970,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 101 (year 2022),  Truck Traffic: 13%,  Average Future Daily Traffic: 142 (year 2033),  Design Load: HS 20,  Features Intersected: HUNTINGTON CREEK,  Facility Carried by Structure: SR 4017
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Poor,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Underwater Inspection Date: July 2020,  Bridge Improvement Cost: $13,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $179,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 24326,  Location: HUNTINGTN TP .1M E SR4035 (Lat: 41.204614,  Lng: -76.274889),  Route carried "on" structure: State highway ,  Year Built: 1952,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 128 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 245 (year 2032),  Design Load: HS 20,  Features Intersected: PINE CREEK,  Facility Carried by Structure: SR 4018
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.589,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Poor,  Channel: Poor,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: November 2020,  Underwater Inspection Date: April 2021,  Other Special Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 24361,  Location: HUNTNGTN TP .4 M N TR 239 (Lat: 41.197642,  Lng: -76.272081),  Route carried "on" structure: Spur State highway ,  Year Built: 1968,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 660 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 339 (year 2032),  Design Load: HS 20,  Features Intersected: PINE CREEK,  Facility Carried by Structure: SR 4035
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.566,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Poor,  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 24409,  Location: 100 FT EAST OF SR 4006 (Lat: 41.173956,  Lng: -76.222722),  Route carried "on" structure: City street ,  Year Built: 1891,  Year Reconstructed: 1950,  Status: Closed,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 55 (year 2012),  Average Future Daily Traffic: 75 (year 2032),  Design Load: HS 20,  Features Intersected: HUNTINGTON CREEK,  Facility Carried by Structure: HUBBARDS FLATS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Aluminum, Iron,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Critical,  Channel: Serious,  Operating Rating: 15.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Underwater Inspection Date: June 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $35,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $473,000,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 24411,  Location: 1200' NORTH SR 4016 (Lat: 41.217986,  Lng: -76.244175),  Route carried "on" structure: City street ,  Year Built: 1910,  Status: Posted for load,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 55 (year 2012),  Average Future Daily Traffic: 70 (year 2032),  Features Intersected: HUNTINGTON CREEK,  Facility Carried by Structure: FTORKOWSKI ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Aluminum, Iron,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.6m (18.4ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 20.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Other Special Inspection Date: September 2020,  Bridge Improvement Cost: $43,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $578,000,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 24412,  Location: 150' EAST OF SR 4016 (Lat: 41.206542,  Lng: -76.246197),  Route carried "on" structure: City street ,  Year Built: 1910,  Status: Closed,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 55 (year 2012),  Average Future Daily Traffic: 70 (year 2032),  Features Intersected: HUNTINGTON CREEK,  Facility Carried by Structure: DARO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.4m (11.2ft),  Material/Design: Aluminum, Iron,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Poor,  Superstructure: Failed,  Substructure: Serious,  Channel: Fair,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $40,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $543,000,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 2969,  Location: 1 MI W OF WILA (Lat: 40.483694,  Lng: -77.188967),  Route carried "on" structure: State highway ,  Year Built: 1948,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 224 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 432 (year 2032),  Design Load: H 20,  Features Intersected: TRIB BUFFALO CREEK,  Facility Carried by Structure: STONE ARCH RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $3,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $43,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 40078,  Location: 1.25 MI E OF BENDERTOWN (Lat: 41.152081,  Lng: -76.295097),  Route carried "on" structure: State highway ,  Year Built: 1998,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 148 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 194 (year 2032),  Design Load: HS 20,  Features Intersected: OVER LITTLE PINE CREEK,  Facility Carried by Structure: S.R. 1026
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Poor,  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 41067,  Location: HUNTINGTON TWP JCT SR4006 (Lat: 41.190647,  Lng: -76.233714),  Route carried "on" structure: State highway 239,  Year Built: 2000,  Status: Open,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 2,608 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,464 (year 2032),  Design Load: HS 20,  Features Intersected: HUNTINGTON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.025,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 6.50m (21.33ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 43397,  Location: 2.5 MI. EAST OF BENTON (Lat: 41.193700,  Lng: -76.327958),  Route carried "on" structure: State highway 239,  Year Built: 2006,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,874 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,059 (year 2032),  Design Load: HL 93,  Features Intersected: EAST BRANCH RAVEN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.555,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2020
Find on map >>   Show street view

Structure Number: 47075,  Location: HNTIGTON TWP 100'E SR4006 (Lat: 41.163781,  Lng: -76.229456),  Route carried "on" structure: Spur State highway ,  Year Built: 2012,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 427 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 690 (year 2032),  Design Load: HL 93,  Features Intersected: HUNTINGTON,  Facility Carried by Structure: SR 4010
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Very good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 52435,  Location: 1.3 MI E OF BENDERTOWN (Lat: 41.149172,  Lng: -76.293628),  Route carried "on" structure: State highway ,  Year Built: 2015,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 255 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 383 (year 2037),  Design Load: HL 93,  Features Intersected: LITTLE PINE CREEK,  Facility Carried by Structure: S.R. 1033
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 55.7 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2020
Find on map >>   Show street view

Structure Number: 56108,  Location: FAIRMONT TP .5M E SR 4033 (Lat: 41.220939,  Lng: -76.277694),  Route carried "on" structure: State highway ,  Year Built: 2018,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 344 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 300 (year 2039),  Design Load: HL 93,  Features Intersected: PINE CREEK,  Facility Carried by Structure: SR 4020
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.622,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 60.6 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2020