Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for New Egypt, New Jersey (NJ)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 79ft / 24.5mTotal length
  • $10,237,000Total costs
  • 40,669Total average daily traffic
  • 1,261Total average daily truck traffic
  • 49,430Total future (year 2037) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for New Egypt
  • No street view available for this location

New bridges in New Egypt, NJ - historical statistics
  • New bridges - historical statistics
  • 41900-1909
  • 11930-1939
  • 21970-1979
  • 41980-1989
  • 21990-1999
  • 22000-2009
  • 12010-2019
  • 12020-2022
Reconstructed bridges in New Egypt, NJ - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 01990-1999
  • 22000-2009
  • 12010-2019
Average Bridge Daily Traffic in New Egypt, NJ
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.7%Excellent
  • 6.7%Very good
  • 46.7%Good
  • 33.3%Satisfactory
  • 6.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.7%Excellent
  • 20.0%Very good
  • 33.3%Good
  • 33.3%Satisfactory
  • 6.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.7%Excellent
  • 20.0%Very good
  • 20.0%Good
  • 40.0%Satisfactory
  • 6.7%Fair
  • 6.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.9%Good
  • 82.4%Satisfactory
  • 11.8%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 3G3017,  Location: 1.3 MI E CRS 616 & 667 (Lat: 40.045989,  Lng: -74.539700),  Route carried "on" structure: Other road ,  Year Built: 1988,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 1,520 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,824 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: JUMPING BROOK,  Facility Carried by Structure: BUNTING BRIDGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1300U21,  Location: 1.5 MI.S.OF IMLAYSTOWN (Lat: 40.141431,  Lng: -74.512781),  Route carried "on" structure: Other road ,  Year Built: 1900,  Year Reconstructed: 2005,  Status: Posted for load,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 793 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 950 (year 2041),  Features Intersected: SCHOOLHOUSE BROOK,  Facility Carried by Structure: MEIRS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.13m (3.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $340,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $600,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1300U22,  Location: 2 MILES NORTH RT 537 (Lat: 40.140939,  Lng: -74.512589),  Route carried "on" structure: Other road ,  Year Built: 1900,  Year Reconstructed: 2005,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 793 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 950 (year 2041),  Features Intersected: MIRY RUN,  Facility Carried by Structure: MEIRS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $897,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $1,544,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1300U23,  Location: 0.2 MI.NO. COUNTY RTE. 27 (Lat: 40.138019,  Lng: -74.516711),  Route carried "on" structure: Other road ,  Year Built: 1900,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 949 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,135 (year 2041),  Features Intersected: MIRY RUN,  Facility Carried by Structure: HARVEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Maintenance Responsibility: City or Municipal Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.0m (13.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Critical Feature Inspection Date: March 2021,  Bridge Improvement Cost: $1,090,000,  Roadway Improvement Cost: $164,000,  Total Project Cost: $1,871,000 ( Estimate for 2021),  Deck Structure Type: Open Grating
Find on map >>   Show street view

Structure Number: 1300U26,  Location: 0.2 MI. N.W. RTE 537 (Lat: 40.117481,  Lng: -74.493369),  Route carried "on" structure: City street ,  Year Built: 1900,  Year Reconstructed: 1991,  Status: Posted for load,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 343 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 410 (year 2041),  Features Intersected: LAHAWAY CREEK,  Facility Carried by Structure: MEIRS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Maintenance Responsibility: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Critical Feature Inspection Date: March 2021,  Bridge Improvement Cost: $1,145,000,  Roadway Improvement Cost: $172,000,  Total Project Cost: $1,966,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 1300U32,  Location: 0.15 MI S OF CR 539 (Lat: 40.108169,  Lng: -74.513089),  Route carried "on" structure: County highway 272,  Year Built: 1990,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 510 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 610 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: LAHAWAY CREEK,  Facility Carried by Structure: ARNYSTN-HRNRSTN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.205,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1300U38,  Location: 4 MI NW RT 539 AND RT 537 (Lat: 40.133731,  Lng: -74.542250),  Route carried "on" structure: Other road ,  Year Built: 2021,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,476 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,779 (year 2041),  Design Load: HL 93,  Features Intersected: MIRY RUN,  Facility Carried by Structure: HOLMES MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $778,000,  Roadway Improvement Cost: $117,000,  Total Project Cost: $1,337,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 1300U4,  Location: 1.37 MI N OF CR 537 (Lat: 40.107000,  Lng: -74.536381),  Route carried "on" structure: County highway 27,  Year Built: 2008,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 430 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 515 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: LAHAWAY CREEK,  Facility Carried by Structure: Holmes Mill Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.189,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 1300U45,  Location: 0.4 MILES WEST OF CR 27II (Lat: 40.102481,  Lng: -74.544111),  Route carried "on" structure: Other road ,  Year Built: 2018,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 390 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 467 (year 2041),  Design Load: HL 93,  Features Intersected: CROSSWICKS CREEK,  Facility Carried by Structure: ARNYTN-HORNRSTN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.99m (9.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,826,000,  Roadway Improvement Cost: $228,000,  Total Project Cost: $2,556,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 1300U93,  Location: 0.46 MI E. OF HOLMES MILL (Lat: 40.101081,  Lng: -74.527461),  Route carried "on" structure: County highway 27,  Year Built: 1979,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 993 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,190 (year 2041),  Features Intersected: LAHAWAY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.740,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.8m (19.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 130U114,  Location: 0.34 MI N RT 537 (Lat: 40.107931,  Lng: -74.510639),  Route carried "on" structure: County highway 539,  Year Built: 1939,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 12,804 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 15,623 (year 2041),  Features Intersected: LAHAWAY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 60.399,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.4m (50.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Total Project Cost: $318,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1523001,  Location: 1.4 MI E OF RT528 (Lat: 40.084231,  Lng: -74.540961),  Route carried "on" structure: County highway 537,  Year Built: 2006,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 7,505 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,160 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CROSSWICKS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 54.026,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 1523007,  Location: 3 MI. WEST OF RT 539 (Lat: 40.067639,  Lng: -74.532011),  Route carried "on" structure: County highway 528,  Year Built: 1985,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 10,925 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,330 (year 2040),  Design Load: HS 20,  Features Intersected: CROSSWICKS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.878,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 152301,  Location: 1 MILE SO OF NEW EGYPT (Lat: 40.047231,  Lng: -74.530781),  Route carried "on" structure: County highway ,  Year Built: 1976,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 979 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,175 (year 2040),  Design Load: HS 20,  Features Intersected: BRCH OF CROSSWICKS CREEK,  Facility Carried by Structure: BRINDLETOWN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.614,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1523027,  Location: 0.1 MI SO OF CO RT 528 (Lat: 40.074981,  Lng: -74.514800),  Route carried "on" structure: City street ,  Year Built: 1997,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 123 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 148 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: CROSSWICKS CREEK,  Facility Carried by Structure: FIELDCREST DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.2m (3.9ft)

Condition: Channel: Fair,  Culverts: Good,  Inventory Rating: 75.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020
Find on map >>   Show street view

Structure Number: 3360001,  Location: 1.0 MI EAST OF CO RT 539 (Lat: 40.067769,  Lng: -74.448039),  Route carried "on" structure: State lands road ,  Year Built: 1987,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 36 (year 2021),  Average Future Daily Traffic: 44 (year 2041),  Design Load: HS 20,  Features Intersected: TRIBUTARY OF RIDGEWAY BR,  Facility Carried by Structure: COLLIERS MILLS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Agenciy,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: AFNJHEKP09122,  Location: 0.4 MILES WEST OF BRINDLE (Lat: 40.036389,  Lng: -74.536111),  Route carried "on" structure: Other road ,  Year Built: 1980,  Status: Open,  Structure Length: 0.96m (3.15ft),  Average Daily Traffic: 100 (year 2017),  Average Future Daily Traffic: 120 (year 2037),  Design Load: HS 20,  Features Intersected: CROSSWICKS CREEK,  Facility Carried by Structure: BUCK SWAMP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Air Force,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.2m (30.2ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2021,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $30,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $45,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss New Egypt, New Jersey (NJ) on our hugely popular New Jersey forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.