Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for New Hope, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 31Number of bridges
  • 282ft / 85.8mTotal length
  • $32,440,000Total costs
  • 104,834Total average daily traffic
  • 6,305Total average daily truck traffic
  • 143,599Total future (year 2034) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for New Hope
  • No street view available for this location

New bridges in New Hope, AL - historical statistics
  • New bridges - historical statistics
  • 31920-1929
  • 121930-1939
  • 21940-1949
  • 61950-1959
  • 41980-1989
  • 31990-1999
  • 12000-2009
Average Bridge Daily Traffic in New Hope, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 41.7%Good
  • 16.7%Satisfactory
  • 33.3%Fair
  • 8.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Very good
  • 25.0%Good
  • 33.3%Satisfactory
  • 16.7%Fair
  • 8.3%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.3%Very good
  • 33.3%Good
  • 16.7%Satisfactory
  • 33.3%Fair
  • 8.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.7%Very good
  • 29.0%Good
  • 29.0%Satisfactory
  • 29.0%Fair
  • 3.2%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 5.3%Very good
  • 36.8%Good
  • 31.6%Satisfactory
  • 26.3%Fair
Find on map >>   Show street view

Structure Number: 450480035,  Location: 0.3 MI SOUTH US 431 (Lat: 34.471667,  Lng: -86.375000),  Route carried "on" structure: ServiceFederal lands road ,  Year Built: 1939,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 191 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 375 (year 2041),  Design Load: H 20,  Features Intersected: LITTLE PAINT ROCK CREEK,  Facility Carried by Structure: LOCK ACCESS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.633,  Lanes on structure: 2,  Owner: Tennessee Valley Authority,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 47.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 434,  Location: 1.4 MI S NEW HOPE (Lat: 34.517914,  Lng: -86.385594),  Route carried "on" structure: City street 169,  Year Built: 1927,  Status: Posted for load,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 672 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 875 (year 2041),  Design Load: H 10,  Features Intersected: PAINT ROCK RIVER,  Facility Carried by Structure: OLD 431 HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 6,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 6.52m (21.39ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: Febuary 2021,  Underwater Inspection Date: July 2020,  Other Special Inspection Date: March 2022,  Bridge Improvement Cost: $939,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,033,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 549,  Location: 1.2 MI S NEW HOPE (Lat: 34.523189,  Lng: -86.388575),  Route carried "on" structure: City street 169,  Year Built: 1928,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 675 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 962 (year 2041),  Design Load: H 10,  Features Intersected: PAINT ROCK RIVER RELIEF,  Facility Carried by Structure: OLD 431 HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 48.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 4.58m (15.03ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: Febuary 2021,  Bridge Improvement Cost: $723,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $795,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 576,  Location: 0.5 MI N AL 14 (Lat: 32.542217,  Lng: -85.895183),  Route carried "on" structure: City street ,  Year Built: 1929,  Status: Posted for load,  Structure Length: 14.15m (46.42ft),  Average Daily Traffic: 8,839 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,277 (year 2041),  Design Load: H 15,  Features Intersected: GRAVEYARD CREEK,  Facility Carried by Structure: N ANN AVE(CO 161)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 16.9m (55.4ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 25.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 14.95m (49.05ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Underwater Inspection Date: January 2019,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $2,460,000,  Roadway Improvement Cost: $246,000,  Total Project Cost: $2,706,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1651,  Location: 2.0 MI S JCT CO RD 364 (Lat: 34.546272,  Lng: -86.441847),  Route carried "on" structure: City street 192,  Year Built: 1937,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 319 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 441 (year 2035),  Design Load: H 15,  Features Intersected: YELLOW BANK CREEK,  Facility Carried by Structure: MAPLES RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $240,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $264,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1673,  Location: 0.25 MI NORTH CO RD1164 (Lat: 34.537478,  Lng: -86.447869),  Route carried "on" structure: City street 377,  Year Built: 1937,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 487 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 591 (year 2035),  Design Load: H 15,  Features Intersected: HESS SPRING BRANCH,  Facility Carried by Structure: OAK GROVE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $208,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $229,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1674,  Location: 0.15 MI EAST CO RD 1379 (Lat: 34.514675,  Lng: -86.436731),  Route carried "on" structure: County highway 381,  Year Built: 1937,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 300 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 395 (year 2040),  Design Load: H 15,  Features Intersected: SCOTT BRANCH,  Facility Carried by Structure: OAK GROVE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $160,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $176,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1832,  Location: 0.2 MI W OF CO RD 384 (Lat: 34.540500,  Lng: -86.373733),  Route carried "on" structure: County highway 155,  Year Built: 1938,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 650 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 810 (year 2034),  Design Load: H 15,  Features Intersected: POND CREEK,  Facility Carried by Structure: ALBERT MANN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2020,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $314,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $345,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1833,  Location: 3.0 MI E OF NEW HOPE (Lat: 34.544022,  Lng: -86.351317),  Route carried "on" structure: County highway 155,  Year Built: 1938,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 400 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 530 (year 2034),  Design Load: H 15,  Features Intersected: CEDAR CREEK,  Facility Carried by Structure: ALBERT MANN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $196,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $216,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1836,  Location: 904 FT N JCT 431 (Lat: 34.489781,  Lng: -86.382042),  Route carried "on" structure: County highway 169,  Year Built: 1938,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 200 (year 1994),  Truck Traffic: 1%,  Average Future Daily Traffic: 350 (year 2042),  Design Load: H 10,  Features Intersected: BRANCH,  Facility Carried by Structure: COUNTY HIGHWAY116
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 63.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $255,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $281,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1837,  Location: 0.1 MI E FAS RT 01 (Lat: 34.554842,  Lng: -86.368322),  Route carried "on" structure: County highway 176,  Year Built: 1938,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 400 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 480 (year 2034),  Design Load: H 15,  Features Intersected: POND CREEK,  Facility Carried by Structure: NEBO RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $239,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $263,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1878,  Location: 2.5 MI NE JCT CO RD176 (Lat: 34.576836,  Lng: -86.344639),  Route carried "on" structure: County highway 537,  Year Built: 1938,  Status: Posted for load,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 785 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 980 (year 2034),  Design Load: H 15,  Features Intersected: TREMBLE CREEK,  Facility Carried by Structure: NEW HOPE CED PT R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 38.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.54m (8.33ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2020,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $506,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $557,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2615,  Location: 22 MI N NEW HOPE (Lat: 34.576653,  Lng: -86.396950),  Route carried "on" structure: County highway 188,  Year Built: 1941,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 325 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 360 (year 2034),  Design Load: H 15,  Features Intersected: HILL CREEK,  Facility Carried by Structure: OLD GURLEY PIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $215,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $237,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2622,  Location: 3.3 MI NW NEW HOPE (Lat: 34.548681,  Lng: -86.450692),  Route carried "on" structure: County highway 377,  Year Built: 1941,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 494 (year 2001),  Truck Traffic: 1%,  Average Future Daily Traffic: 592 (year 2040),  Design Load: H 15,  Features Intersected: YELLOW BANK CREEK,  Facility Carried by Structure: OAK GROVE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Poor,  Operating Rating: 50.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $396,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $436,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 576,  Location: 1.2 MI N PAINT ROCK RIVER (Lat: 34.513333,  Lng: -86.401667),  Route carried "on" structure: US 431,  Year Built: 1957,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 10,601 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 14,841 (year 2038),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 505.134,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $1,295,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $1,425,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5761,  Location: 4 MI N PAINT ROCK RIVER (Lat: 34.545000,  Lng: -86.430000),  Route carried "on" structure: US 431,  Year Built: 1957,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 10,601 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 14,841 (year 2038),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 509.689,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 63.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,799,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $1,979,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5771,  Location: 3 MI S PAINT ROCK RIVER (Lat: 34.470000,  Lng: -86.368333),  Route carried "on" structure: US 431,  Year Built: 1957,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 10,370 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 14,518 (year 2039),  Design Load: HS 20,  Features Intersected: LITTLE PAINT ROCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 499.436,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 61.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.95m (9.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $3,871,000,  Roadway Improvement Cost: $387,000,  Total Project Cost: $4,258,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5772,  Location: JCT PAINT ROCK RIVER (Lat: 34.499056,  Lng: -86.390825),  Route carried "on" structure: US 431,  Year Built: 1957,  Status: Open,  Structure Length: 11.06m (36.29ft),  Average Daily Traffic: 10,370 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 14,518 (year 2039),  Design Load: HS 20,  Features Intersected: PAINT ROCK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 503.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 48.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.95m (39.21ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $2,704,000,  Roadway Improvement Cost: $270,000,  Total Project Cost: $2,974,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6718,  Location: 0.3 MI E CO RD 387 (Lat: 34.529089,  Lng: -86.349675),  Route carried "on" structure: County highway 170,  Year Built: 1959,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 400 (year 2001),  Truck Traffic: 1%,  Average Future Daily Traffic: 688 (year 2042),  Design Load: H 15,  Features Intersected: CEDAR CREEK,  Facility Carried by Structure: PAINT ROCK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 17.9m (58.7ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 70.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $550,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12464,  Location: 2.0 MI SO FAS RT 01 (Lat: 34.504503,  Lng: -86.491928),  Route carried "on" structure: County highway 375,  Year Built: 1938,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 270 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 335 (year 2040),  Design Load: H 15,  Features Intersected: CLOUDS CREEK,  Facility Carried by Structure: CLOUDS COVE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $280,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $308,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1306,  Location: 2.0 MI SW JCT US HWY 431 (Lat: 34.504361,  Lng: -86.420578),  Route carried "on" structure: County highway 167,  Year Built: 1983,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 80 (year 1992),  Average Future Daily Traffic: 185 (year 2040),  Design Load: HS 20,  Features Intersected: SCOTT BRANCH,  Facility Carried by Structure: SCOTT BRANCH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.11m (6.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $389,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $428,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13096,  Location: 0.1 MI N NEW HOPE (Lat: 34.562753,  Lng: -86.398161),  Route carried "on" structure: County highway 188,  Year Built: 1937,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 525 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 725 (year 2040),  Design Load: H 15,  Features Intersected: DRAKE COVE BRANCH,  Facility Carried by Structure: OLD GURLEY PIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $341,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $375,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13423,  Location: 1.0 MILE NO FAS RT 01 (Lat: 34.583478,  Lng: -86.365003),  Route carried "on" structure: County highway 395,  Year Built: 1984,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 400 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 500 (year 2035),  Design Load: HS 20,  Features Intersected: OWL CREEK,  Facility Carried by Structure: POPLAR RIDGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $401,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $441,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14036,  Location: 1300 FT W JCT 431 (Lat: 34.484581,  Lng: -86.386194),  Route carried "on" structure: County highway 456,  Year Built: 1986,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 420 (year 1994),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2042),  Design Load: HS 20,  Features Intersected: LITTLE PAINT ROCK CREEK,  Facility Carried by Structure: COUNTY HIGHWAY145
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 72.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.23m (7.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $516,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $568,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 14948,  Location: 2 MI W JCT HWY 431-S (Lat: 34.549031,  Lng: -86.452008),  Route carried "on" structure: County highway 155,  Year Built: 1989,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 3,500 (year 1990),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,905 (year 2040),  Design Load: HS 20,  Features Intersected: YELLOW BANK CREEK,  Facility Carried by Structure: HOBBS ISLAND RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 65.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $521,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $573,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16235,  Location: INT PAINT ROCK RIVER (Lat: 34.499111,  Lng: -86.390567),  Route carried "on" structure: US 431,  Year Built: 1997,  Status: Open,  Structure Length: 12.80m (41.99ft),  Average Daily Traffic: 10,116 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 14,163 (year 2038),  Design Load: HS 20,  Features Intersected: PAINT ROCK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 503.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 78.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.63m (44.72ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $4,018,000,  Roadway Improvement Cost: $402,000,  Total Project Cost: $4,420,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16236,  Location: 0.2 MI N PAINT ROCK RIVER (Lat: 34.501881,  Lng: -86.392622),  Route carried "on" structure: US 431,  Year Built: 1996,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 10,116 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 14,163 (year 2038),  Design Load: HS 20,  Features Intersected: PAINT ROCK RIVER RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 503.633,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 86.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 68.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,091,000,  Roadway Improvement Cost: $209,000,  Total Project Cost: $2,300,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16237,  Location: 0.4 MI N PAINT ROCK RIVER (Lat: 34.504658,  Lng: -86.394711),  Route carried "on" structure: US 431,  Year Built: 1996,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 10,601 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 14,842 (year 2038),  Design Load: HS 20,  Features Intersected: PAINT ROCK RIVER RELIEF
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 504.053,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 57.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,829,000,  Roadway Improvement Cost: $183,000,  Total Project Cost: $2,012,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18831,  Location: 1.3 MILES EAST OF HWY.431 (Lat: 34.535853,  Lng: -86.393581),  Route carried "on" structure: City street ,  Year Built: 1937,  Status: Posted for load,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 726 (year 2006),  Average Future Daily Traffic: 1,016 (year 2035),  Design Load: H 15,  Features Intersected: SPRING BRANCH,  Facility Carried by Structure: COUNTY RD. 10
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 33.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $322,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $354,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19054,  Location: 1/4 MI.W.OF OLD GURLEY PK (Lat: 34.574467,  Lng: -86.401125),  Route carried "on" structure: County highway 356,  Year Built: 2005,  Status: Open,  Structure Length: 1.51m (4.95ft),  Average Daily Traffic: 400 (year 2005),  Truck Traffic: 7%,  Average Future Daily Traffic: 600 (year 2040),  Design Load: HS 20,  Features Intersected: HILL CREEK,  Facility Carried by Structure: LOW GAP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 61.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $480,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $528,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19846,  Location: 2.5 MI N PAINT ROCK RIVER (Lat: 34.531278,  Lng: -86.415583),  Route carried "on" structure: US 431,  Year Built: 1957,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 10,601 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 14,841 (year 2038),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 507.265,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.2m (7.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 73.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,281,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $1,409,000 ( Estimate for 2022)
Discuss New Hope, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.