Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for New Llano, Louisiana (LA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 233ft / 71.5mTotal length
  • $922,000Total costs
  • 87,890Total average daily traffic
  • 12,566Total average daily truck traffic
  • 66,822Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for New Llano
  • No street view available for this location

New bridges in New Llano, LA - historical statistics
  • New bridges - historical statistics
  • 21950-1959
  • 71970-1979
  • 51980-1989
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in New Llano, LA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 15.4%Very good
  • 61.5%Good
  • 23.1%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 15.4%Very good
  • 69.2%Good
  • 7.7%Satisfactory
  • 7.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.7%Very good
  • 61.5%Good
  • 23.1%Satisfactory
  • 7.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.5%Good
  • 37.5%Satisfactory
  • 37.5%Fair
  • 12.5%Poor
Find on map >>   Show street view

Structure Number: 85800000080592,  Location: 1.1 NORTH OF LA 10 (Lat: 31.043619,  Lng: -93.275400),  Route carried "on" structure: US 171,  Year Built: 2012,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 6,350 (year 2016),  Truck Traffic: 15%,  Average Future Daily Traffic: 4,140 (year 2036),  Design Load: HS 20,  Features Intersected: BAYOU ZOURIE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.396,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 24-06-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 85800240611552,  Location: 1.1 MI NORTH OF LA 10 (Lat: 31.043481,  Lng: -93.275819),  Route carried "on" structure: US 171,  Year Built: 1978,  Status: Open,  Structure Length: 6.92m (22.70ft),  Average Daily Traffic: 6,350 (year 2016),  Truck Traffic: 15%,  Average Future Daily Traffic: 4,140 (year 2036),  Design Load: HS 20,  Features Intersected: BAYOU ZOURIE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.193,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 24-06-2,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 85800240615501,  Location: 5.1 MI NORTH OF LA 10 (Lat: 31.103531,  Lng: -93.269700),  Route carried "on" structure: US 171,  Year Built: 1975,  Status: Open,  Structure Length: 6.13m (20.11ft),  Average Daily Traffic: 11,450 (year 2016),  Truck Traffic: 15%,  Average Future Daily Traffic: 9,108 (year 2036),  Design Load: HS 20,  Features Intersected: CASTOR CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.128,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 24-06-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: Febuary 2020,  Underwater Inspection Date: April 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 85800240615502,  Location: 5.1 MI NORTH OF LA 10 (Lat: 31.103350,  Lng: -93.269950),  Route carried "on" structure: US 171,  Year Built: 1975,  Status: Open,  Structure Length: 6.13m (20.11ft),  Average Daily Traffic: 11,450 (year 2016),  Truck Traffic: 15%,  Average Future Daily Traffic: 9,108 (year 2036),  Design Load: HS 20,  Features Intersected: CASTOR CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.474,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 24-06-2,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: Febuary 2020,  Underwater Inspection Date: April 2018,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 85800240615801,  Location: 5.4 MI NORTH OF LA 10 (Lat: 31.107419,  Lng: -93.270500),  Route carried "on" structure: US 171,  Year Built: 1975,  Status: Open,  Structure Length: 7.38m (24.21ft),  Average Daily Traffic: 11,450 (year 2016),  Truck Traffic: 15%,  Average Future Daily Traffic: 9,108 (year 2036),  Design Load: HS 20,  Features Intersected: CASTOR BAYOU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.568,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 24-06-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 85800240615802,  Location: 5.4 MI NORTH OF LA 10 (Lat: 31.107311,  Lng: -93.270811),  Route carried "on" structure: US 171,  Year Built: 1975,  Status: Open,  Structure Length: 7.38m (24.21ft),  Average Daily Traffic: 11,450 (year 2016),  Truck Traffic: 15%,  Average Future Daily Traffic: 9,108 (year 2036),  Design Load: HS 20,  Features Intersected: CASTOR BAYOU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.014,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 24-06-2,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 85800240616401,  Location: .25 MI NORTH OF LA 1211 (Lat: 31.116581,  Lng: -93.270700),  Route carried "on" structure: US 171,  Year Built: 1975,  Status: Open,  Structure Length: 5.52m (18.11ft),  Average Daily Traffic: 11,450 (year 2016),  Truck Traffic: 14%,  Average Future Daily Traffic: 9,108 (year 2036),  Design Load: HS 20,  Features Intersected: SALES BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.612,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 24-06-1,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 85800240616402,  Location: .25 MI NORTH OF LA 1211 (Lat: 31.116650,  Lng: -93.270900),  Route carried "on" structure: US 171,  Year Built: 1975,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 11,450 (year 2016),  Truck Traffic: 14%,  Average Future Daily Traffic: 9,108 (year 2036),  Design Load: HS 20,  Features Intersected: SALES BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.969,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 24-06-2,  Subroute: 10),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 85808580504311,  Location: 4.31 MILES WEST OF US 171 (Lat: 31.072431,  Lng: -93.317600),  Route carried "on" structure: State highway 1211,  Year Built: 1958,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 2,100 (year 2016),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,260 (year 2036),  Design Load: H 15,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.914,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $392,000,  Total Project Cost: $588,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 85808580504731,  Location: 4.73 MILES WEST OF US 171 (Lat: 31.070661,  Lng: -93.323900),  Route carried "on" structure: State highway 1211,  Year Built: 1958,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 2,100 (year 2016),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,260 (year 2036),  Design Load: H 15,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.588,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 85831022931711,  Location: COOPER ROAD (Lat: 31.036531,  Lng: -93.285500),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 510 (year 1976),  Average Future Daily Traffic: 306 (year 2036),  Design Load: HS 20,  Features Intersected: PARISH RD #4,ZOURIE BAYO,  Facility Carried by Structure: COOPER CHURCH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.722,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 85831022931781,  Location: 1.48 M. W. OF US 171 (Lat: 31.036411,  Lng: -93.297300),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 800 (year 2001),  Average Future Daily Traffic: 480 (year 2036),  Design Load: HS 20,  Features Intersected: ZOURIE CREEK,  Facility Carried by Structure: COOPER CHURCH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.589,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 42.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 85831034932011,  Location: 1.02 M. S. OF END LA 1211 (Lat: 31.057511,  Lng: -93.335300),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 290 (year 1976),  Average Future Daily Traffic: 174 (year 2036),  Design Load: HS 20,  Features Intersected: BIG BRANCH,  Facility Carried by Structure: SAVAGE FORKS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.196,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 37 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 74.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 85831035932001,  Location: 1.0 M. S. OF END LA 1211 (Lat: 31.058289,  Lng: -93.334500),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 290 (year 1976),  Average Future Daily Traffic: 174 (year 2036),  Design Load: HS 20,  Features Intersected: BIG BRANCH,  Facility Carried by Structure: SAVAGE FORKS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.307,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 31 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 85831043931811,  Location: .77 M. E. OF LA 1211 (Lat: 31.072011,  Lng: -93.302000),  Route carried "on" structure: County highway ,  Year Built: 1986,  Status: Posted for load,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 150 (year 1976),  Average Future Daily Traffic: 90 (year 2036),  Design Load: H 10,  Features Intersected: CASTOR BAYOU,  Facility Carried by Structure: SECTION LINE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.752,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 30 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 14.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 10.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 3.75m (12.30ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2020,  Bridge Improvement Cost: $223,000,  Total Project Cost: $334,000 ( Estimate for 2016),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 85831050931901,  Location: 1.38 M. W. OF LA 1211 (Lat: 31.083131,  Lng: -93.316300),  Route carried "on" structure: County highway ,  Year Built: 1987,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 250 (year 1976),  Average Future Daily Traffic: 150 (year 2036),  Design Load: HS 20,  Features Intersected: CASTOR BAYOU TRIBUTARY,  Facility Carried by Structure: VFW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.595,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 74.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Discuss New Llano, Louisiana (LA) on our hugely popular Louisiana forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.