Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Newstead, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 24Number of bridges
  • 171ft / 52.1mTotal length
  • $37,236,000Total costs
  • 72,839Total average daily traffic
  • 1,360Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Newstead
  • No street view available for this location

New bridges in Newstead, NY - historical statistics
  • New bridges - historical statistics
  • 41930-1939
  • 21940-1949
  • 51950-1959
  • 21960-1969
  • 21980-1989
  • 21990-1999
  • 62010-2019
  • 12020-2022
Reconstructed bridges in Newstead, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 21990-1999
Average Bridge Daily Traffic in Newstead, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 13.3%Excellent
  • 20.0%Very good
  • 20.0%Good
  • 33.3%Satisfactory
  • 13.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.0%Excellent
  • 13.3%Very good
  • 26.7%Good
  • 33.3%Satisfactory
  • 6.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.7%Excellent
  • 13.3%Very good
  • 33.3%Good
  • 26.7%Satisfactory
  • 20.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.6%Excellent
  • 11.1%Very good
  • 22.2%Good
  • 50.0%Satisfactory
  • 11.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 16.7%Excellent
  • 16.7%Very good
  • 16.7%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 103476,  Location: 4.8 MI N JCT RTS 93 + 267 (Lat: 43.081119,  Lng: -78.517661),  Route carried "on" structure: State highway 93,  Year Built: 1932,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 3,083 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,113 (year 2040),  Design Load: HS 20,  Features Intersected: LEDGE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.949,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.8m (74.8ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 66.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.46m (8.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $775,000,  Roadway Improvement Cost: $454,000,  Total Project Cost: $1,229,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 103477,  Location: 2.4 MI N JCT RTS 93 + 267 (Lat: 43.046878,  Lng: -78.512714),  Route carried "on" structure: State highway 93,  Year Built: 1960,  Status: Open,  Structure Length: 4.60m (15.09ft),  Average Daily Traffic: 3,083 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,113 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: MURDER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.843,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.2m (72.8ft),  Curb or Sidewalk Widths: Left: 1.0m (3.3ft),  Right: 1.0m (3.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 27.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 11.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,430,000,  Roadway Improvement Cost: $838,000,  Total Project Cost: $2,268,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221337,  Location: 3.1 MI NW OF AKRON (Lat: 43.060119,  Lng: -78.529681),  Route carried "on" structure: County highway ,  Year Built: 1999,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 209 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 293 (year 2036),  Features Intersected: MURDER CREEK TRIB,  Facility Carried by Structure: GREENBUSH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 73.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $267,000,  Roadway Improvement Cost: $156,000,  Total Project Cost: $423,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 22681,  Location: 1.0 MI. E. OF CEDAR ST. (Lat: 43.062050,  Lng: -78.491375),  Route carried "on" structure: Spur Other road ,  Year Built: 1980,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 323 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 452 (year 2038),  Features Intersected: LEDGE CREEK,  Facility Carried by Structure: MARTIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.676,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.5m (14.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 75.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $205,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $325,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332626,  Location: 3 MILES NW OF AKRON (Lat: 43.052644,  Lng: -78.530300),  Route carried "on" structure: County highway ,  Year Built: 1986,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 858 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,201 (year 2040),  Design Load: HS 20,  Features Intersected: MURDER CREEK, MURDER CRE,  Facility Carried by Structure: RAPIDS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.969,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 75.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 58.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $214,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $340,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332651,  Location: 1.3 MI N OF N QUAD AKRON (Lat: 43.045731,  Lng: -78.475264),  Route carried "on" structure: County highway ,  Year Built: 1956,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 712 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 997 (year 2040),  Features Intersected: LEDGE CREEK,  Facility Carried by Structure: SCOTLAND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.556,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $510,000,  Roadway Improvement Cost: $299,000,  Total Project Cost: $809,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332652,  Location: 2.7 MILES NORTH OF AKRON (Lat: 43.060003,  Lng: -78.517703),  Route carried "on" structure: County highway ,  Year Built: 2016,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 172 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 241 (year 2038),  Design Load: HL 93,  Features Intersected: MURDER CREEK,  Facility Carried by Structure: SWIFT MILLS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.949,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 58.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $749,000,  Roadway Improvement Cost: $439,000,  Total Project Cost: $1,188,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 332653,  Location: 1 MI N OF NW QUAD AKRON (Lat: 43.041714,  Lng: -78.523294),  Route carried "on" structure: County highway ,  Year Built: 1941,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 404 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 566 (year 2036),  Features Intersected: BR MURDER CREEK,  Facility Carried by Structure: MEAHL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.832,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 39.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $291,000,  Roadway Improvement Cost: $170,000,  Total Project Cost: $461,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332654,  Location: 2.9 MI SW JCT SH93&TOW CK (Lat: 43.071831,  Lng: -78.570050),  Route carried "on" structure: County highway ,  Year Built: 2012,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 117 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 164 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: BR TONAWANDA CRK,  Facility Carried by Structure: BURDICK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.837,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $233,000,  Roadway Improvement Cost: $136,000,  Total Project Cost: $369,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 332655,  Location: 2.3 MI W JCT SH93 &TOW CK (Lat: 43.091539,  Lng: -78.563908),  Route carried "on" structure: County highway ,  Year Built: 1937,  Status: Posted for load-capacity,  Structure Length: 4.21m (13.81ft),  Truck Traffic: 3%,  Features Intersected: TONAWANDA CREEK,  Facility Carried by Structure: BURDICK ROAD
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 40.5m (132.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Bridge Improvement Cost: $3,781,000,  Roadway Improvement Cost: $2,214,000,  Total Project Cost: $5,994,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 332656,  Location: 4.2 MILES NORTH OF AKRON (Lat: 43.080219,  Lng: -78.518969),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 217 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 304 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: MURDER CREEK,  Facility Carried by Structure: TONAWANDA CRK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.878,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 56.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.13m (10.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $909,000,  Roadway Improvement Cost: $533,000,  Total Project Cost: $1,442,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 332658,  Location: 2.8 MILES NORTH OF AKRON (Lat: 43.072958,  Lng: -78.499447),  Route carried "on" structure: County highway ,  Year Built: 2020,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,084 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,518 (year 2038),  Features Intersected: LEDGE CREEK,  Facility Carried by Structure: CEDAR STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.004,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Channel: Excellent,  Culverts: Excellent,  Operating Rating: 79.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $498,000,  Roadway Improvement Cost: $291,000,  Total Project Cost: $789,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 332659,  Location: 3.6 MILES NORTH OF AKRON (Lat: 43.062392,  Lng: -78.499719),  Route carried "on" structure: County highway ,  Year Built: 1937,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 1,084 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,518 (year 2038),  Features Intersected: BRANCH MURDER CRK,  Facility Carried by Structure: CEDAR STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.829,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: September 2017,  Bridge Improvement Cost: $357,000,  Roadway Improvement Cost: $209,000,  Total Project Cost: $566,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33266,  Location: 1.1 MI E JCT SH93 &TOW CK (Lat: 43.083133,  Lng: -78.499378),  Route carried "on" structure: Other road ,  Year Built: 2011,  Status: Open,  Structure Length: 4.88m (16.01ft),  Truck Traffic: 4%,  Design Load: HL 93,  Features Intersected: TONAWANDA CREEK,  Facility Carried by Structure: CEDAR ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.202,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 46.9m (153.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.87m (15.98ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Bridge Improvement Cost: $3,090,000,  Roadway Improvement Cost: $1,809,000,  Total Project Cost: $4,899,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 332661,  Location: 2 MILES NW OF CRITTENDEN (Lat: 42.961889,  Lng: -78.518383),  Route carried "on" structure: County highway ,  Year Built: 1941,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 309 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 433 (year 2037),  Features Intersected: BR ELLICOTT CREEK,  Facility Carried by Structure: BUCKWHEAT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.266,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $295,000,  Roadway Improvement Cost: $173,000,  Total Project Cost: $467,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332682,  Location: 2.1 MILES NE OF AKRON (Lat: 43.047336,  Lng: -78.481497),  Route carried "on" structure: County highway ,  Year Built: 1961,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 861 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,205 (year 2040),  Features Intersected: LEDGE CREEK,  Facility Carried by Structure: CARNEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.542,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $383,000,  Roadway Improvement Cost: $224,000,  Total Project Cost: $607,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332683,  Location: 4.7 MILES NW OF AKRON (Lat: 43.065775,  Lng: -78.569992),  Route carried "on" structure: County highway ,  Year Built: 2011,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 117 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 164 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: BR TONAWANDA CRK,  Facility Carried by Structure: BURDICK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 76.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $185,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $293,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 332881,  Location: 4.5 MI N JCT US20 & SH358 (Lat: 42.956203,  Lng: -78.533536),  Route carried "on" structure: Other road ,  Year Built: 1937,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 189 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 265 (year 2040),  Features Intersected: BR ELLICOTT CREEK,  Facility Carried by Structure: POHL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 80.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 61.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $522,000,  Roadway Improvement Cost: $306,000,  Total Project Cost: $828,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 551164,  Location: .7 MI W JCT I90 & ERIE CL (Lat: 42.982578,  Lng: -78.477864),  Route carried "on" structure: County highway ,  Year Built: 1953,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 7.22m (23.69ft),  Average Daily Traffic: 2,186 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,207 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: 90IX WB, RTE I90,  Facility Carried by Structure: CRITTENDEN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.213,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.1m (75.8ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 81.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.22m (23.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,637,000,  Roadway Improvement Cost: $1,544,000,  Total Project Cost: $4,182,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 551165,  Location: 2.5 MI W JCT I90(Lat: 42.974767,  Lng: -78.512789),  Route carried "on" structure: County highway ,  Year Built: 2015,  Status: Open,  Structure Length: 6.13m (20.11ft),  Average Daily Traffic: 1,728 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,419 (year 2036),  Design Load: HL 93,  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: S NEWSTEAD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.701,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.12m (20.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $3,650,000,  Roadway Improvement Cost: $2,137,000,  Total Project Cost: $5,787,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 551166,  Location: 4.8 MI W JCT I90(Lat: 42.964258,  Lng: -78.552733),  Route carried "on" structure: County highway ,  Year Built: 1953,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 2,103 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,944 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: N MILLGROVE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.395,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.85m (22.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,504,000,  Roadway Improvement Cost: $1,466,000,  Total Project Cost: $3,970,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 551164,  Location: .7 MI W JCT I90 & ERIE CL (Lat: 42.982578,  Lng: -78.477864),  Route carried "under" structure: Interstate 90,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 18,000 (year 1977),  Features Intersected: 90IX WB, RTE I90,  Facility Carried by Structure: CRITTENDEN RD
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 652.369,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.1m (75.8ft)

Find on map >>   Show street view

Structure Number: 551165,  Location: 2.5 MI W JCT I90(Lat: 42.974767,  Lng: -78.512789),  Route carried "under" structure: Interstate 90,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 18,000 (year 2021),  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: S NEWSTEAD RD
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 655.297,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 551166,  Location: 4.8 MI W JCT I90(Lat: 42.964258,  Lng: -78.552733),  Route carried "under" structure: Interstate 90,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 18,000 (year 2000),  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: N MILLGROVE RD
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 658.789,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Discuss Newstead, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.