Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Niagara, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 20Number of bridges
  • 144ft / 44.2mTotal length
  • $39,401,000Total costs
  • 210,953Total average daily traffic
  • 10,925Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Niagara
  • No street view available for this location

New bridges in Niagara, NY - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 171960-1969
  • 11990-1999
  • 12000-2009
Reconstructed bridges in Niagara, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31990-1999
  • 12000-2009
Average Bridge Daily Traffic in Niagara, NY
Average Bridge Truck Traffic in Niagara, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Very good
  • 12.5%Good
  • 50.0%Satisfactory
  • 12.5%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Excellent
  • 25.0%Very good
  • 25.0%Good
  • 25.0%Satisfactory
  • 12.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Very good
  • 37.5%Good
  • 37.5%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Very good
  • 50.0%Good
Find on map >>   Show street view

Structure Number: 1021469,  Location: JCT RT 31 + I-190 (Lat: 43.130156,  Lng: -79.018678),  Route carried "on" structure: Interstate 190,  Year Built: 1961,  Status: Open,  Structure Length: 2.92m (9.58ft),  Average Daily Traffic: 14,193 (year 2020),  Truck Traffic: 24%,  Average Future Daily Traffic: 15,906 (year 2040),  Features Intersected: RTE 31, 31 31 54012011
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.399,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 21 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 32.3m (106.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 82.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.92m (9.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $6,354,000,  Roadway Improvement Cost: $3,721,000,  Total Project Cost: $10,075,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 102147,  Location: 0.1 MI W JCT RTS 31 & 265 (Lat: 43.129975,  Lng: -79.009753),  Route carried "on" structure: State highway 31,  Year Built: 2003,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 7,305 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,339 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: GILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.151,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $307,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $486,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1039571,  Location: JCT RTS 190I & 182 (Lat: 43.107961,  Lng: -78.992219),  Route carried "on" structure: Interstate 190,  Year Built: 1964,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 17,624 (year 2014),  Truck Traffic: 11%,  Features Intersected: RTE 182
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.956,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.0m (101.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 51.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 6.46m (21.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,588,000,  Roadway Improvement Cost: $1,515,000,  Total Project Cost: $4,103,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1039572,  Location: JCT RTS 190I & 182 (Lat: 43.108019,  Lng: -78.991756),  Route carried "on" structure: Interstate 190,  Year Built: 1964,  Status: Open,  Structure Length: 6.43m (21.10ft),  Average Daily Traffic: 11,674 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 13,082 (year 2040),  Features Intersected: RTE 182
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.956,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.6m (107.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 62.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 6.43m (21.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,567,000,  Roadway Improvement Cost: $1,503,000,  Total Project Cost: $4,070,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 103958,  Location: 0.8 MI W JCT RTS 182 & 62 (Lat: 43.100858,  Lng: -78.957486),  Route carried "on" structure: State highway 182,  Year Built: 1995,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 6,539 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,569 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CAYUGA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.769,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.8m (61.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $694,000,  Roadway Improvement Cost: $406,000,  Total Project Cost: $1,100,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1039681,  Location: 0.2 MI S JCT RT 190I& 182 (Lat: 43.106911,  Lng: -78.989414),  Route carried "on" structure: Interstate 190,  Year Built: 1964,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 4.79m (15.72ft),  Average Daily Traffic: 17,624 (year 2014),  Truck Traffic: 11%,  Design Load: HS 20,  Features Intersected: PACKARD RD CR82
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.730,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.1m (75.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.78m (15.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,783,000,  Roadway Improvement Cost: $1,044,000,  Total Project Cost: $2,826,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1039682,  Location: 0.2 MI S JCT RT 190I& 182 (Lat: 43.107061,  Lng: -78.989128),  Route carried "on" structure: Interstate 190,  Year Built: 1964,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 11,674 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 13,082 (year 2040),  Design Load: HS 20,  Features Intersected: PACKARD RD CR82
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.730,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.4m (76.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 48.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.75m (15.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,777,000,  Roadway Improvement Cost: $1,041,000,  Total Project Cost: $2,818,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 221355,  Location: 1.8 MI NE OFNIAGARA FALLS (Lat: 43.126047,  Lng: -78.950922),  Route carried "on" structure: Other road ,  Year Built: 1963,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 5.97m (19.59ft),  Average Daily Traffic: 2,488 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,483 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: CSXT/AMTRAK,  Facility Carried by Structure: TUSCARORA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.7m (77.8ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Good,  Operating Rating: 38.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 5.97m (19.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,485,000,  Roadway Improvement Cost: $1,455,000,  Total Project Cost: $3,940,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 332927,  Location: 2.5 MI NE OF NIAGARA FLLS (Lat: 43.122453,  Lng: -78.972958),  Route carried "on" structure: County highway ,  Year Built: 1959,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 10.06m (33.01ft),  Average Daily Traffic: 3,478 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,672 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CSX TRANS/ AMTRAK,  Facility Carried by Structure: LOCKPORT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.204,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.05m (32.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $6,296,000,  Roadway Improvement Cost: $3,687,000,  Total Project Cost: $9,983,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1021469,  Location: JCT RT 31 + I-190 (Lat: 43.130156,  Lng: -79.018678),  Route carried "under" structure: State highway 31,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 12,159 (year 2000),  Features Intersected: RTE 31, 31 31 54012011,  Facility Carried by Structure: RTE I190
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 1.818,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>   Show street view

Structure Number: 1021469,  Location: JCT RT 31 + I-190 (Lat: 43.130156,  Lng: -79.018678),  Route carried "under" structure: State highway ,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 9,355 (year 1992),  Features Intersected: RTE 31, 31 31 54012011,  Facility Carried by Structure: RTE I190
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 1.818,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>   Show street view

Structure Number: 1039571,  Location: JCT RTS 190I & 182 (Lat: 43.107961,  Lng: -78.992219),  Route carried "under" structure: State highway 182,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 11,670 (year 2002),  Features Intersected: RTE 182,  Facility Carried by Structure: RTE I190
Minimum Vertical Clearance: 4.87m (15.98ft),  Kilometerpoint: 0.547,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.0m (101.7ft)

Find on map >>   Show street view

Structure Number: 1039572,  Location: JCT RTS 190I & 182 (Lat: 43.108019,  Lng: -78.991756),  Route carried "under" structure: State highway 182,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 11,670 (year 2002),  Features Intersected: RTE 182,  Facility Carried by Structure: RTE I190
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.547,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 1039681,  Location: 0.2 MI S JCT RT 190I& 182 (Lat: 43.106911,  Lng: -78.989414),  Route carried "under" structure: County highway ,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 11,930 (year 1977),  Features Intersected: PACKARD RD CR82,  Facility Carried by Structure: RTE I190
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.1m (75.8ft)

Find on map >>   Show street view

Structure Number: 1039682,  Location: 0.2 MI S JCT RT 190I& 182 (Lat: 43.107061,  Lng: -78.989128),  Route carried "under" structure: County highway ,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 11,930 (year 1977),  Features Intersected: PACKARD RD CR82,  Facility Carried by Structure: RTE I190
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.4m (76.8ft)

Find on map >>   Show street view

Structure Number: 7043881,  Location: 2.5 MI N JCT RTS 265 + 62 (Lat: 43.118797,  Lng: -78.996044),  Route carried "under" structure: State highway 265,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 16,480 (year 2002),  Features Intersected: RTE 265, MILITARY RD,  Facility Carried by Structure: CSX TRANS/AMTRAK
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 3.105,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 7043881,  Location: 2.5 MI N JCT RTS 265 + 62 (Lat: 43.118797,  Lng: -78.996044),  Route carried "under" structure: State highway ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2021),  Features Intersected: RTE 265, MILITARY RD,  Facility Carried by Structure: CSX TRANS/AMTRAK
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 7043882,  Location: 2.5 MI N JCT RTS 265 + 62 (Lat: 43.118706,  Lng: -78.995956),  Route carried "under" structure: State highway 265,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 16,480 (year 2002),  Features Intersected: RTE 265,  Facility Carried by Structure: CSX TRANS/AMTRAK
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 3.105,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 7043883,  Location: 2.5 MI N JCT RTS 265 & 62 (Lat: 43.118628,  Lng: -78.995881),  Route carried "under" structure: State highway 265,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 16,480 (year 2002),  Features Intersected: RTE 265, MILITARY RD,  Facility Carried by Structure: CSX TRANS/AMTRAK
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 3.105,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 7043883,  Location: 2.5 MI N JCT RTS 265 & 62 (Lat: 43.118628,  Lng: -78.995881),  Route carried "under" structure: State highway ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2021),  Features Intersected: RTE 265, MILITARY RD,  Facility Carried by Structure: CSX TRANS/AMTRAK
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 20.1m (65.9ft)

Discuss Niagara, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.