Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Niverville, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 30Number of bridges
  • 292ft / 88.7mTotal length
  • $66,309,000Total costs
  • 150,215Total average daily traffic
  • 25,893Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Niverville
  • No street view available for this location

New bridges in Niverville, NY - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 31920-1929
  • 41930-1939
  • 11940-1949
  • 181950-1959
  • 11980-1989
  • 12000-2009
  • 12010-2019
Reconstructed bridges in Niverville, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 11980-1989
  • 21990-1999
Average Bridge Daily Traffic in Niverville, NY
Average Bridge Truck Traffic in Niverville, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.0%Very good
  • 10.0%Good
  • 30.0%Satisfactory
  • 45.0%Fair
  • 10.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.0%Excellent
  • 5.0%Very good
  • 30.0%Good
  • 35.0%Satisfactory
  • 20.0%Fair
  • 5.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.0%Excellent
  • 10.0%Good
  • 40.0%Satisfactory
  • 40.0%Fair
  • 5.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.1%Very good
  • 18.2%Good
  • 45.5%Satisfactory
  • 27.3%Fair
Find on map >>   Show street view

Structure Number: 102904,  Location: 3.8 MI S JCT RTE66+I90 (Lat: 42.418356,  Lng: -73.614369),  Route carried "on" structure: State highway 66,  Year Built: 1927,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 1,881 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,962 (year 2040),  Design Load: HS 20,  Features Intersected: KINDERHOOK CREEK
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 27.015,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.5m (119.8ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.0m,  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.81m (12.50ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Bridge Improvement Cost: $3,672,000,  Roadway Improvement Cost: $2,150,000,  Total Project Cost: $5,823,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102905,  Location: JCT S.H.66 & I90 (Lat: 42.461917,  Lng: -73.591439),  Route carried "on" structure: State highway 66,  Year Built: 1958,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 365 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 380 (year 2040),  Design Load: HS 20,  Features Intersected: 90IX WB, RTE I90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.049,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 60.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 46.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.07m (26.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $3,186,000,  Roadway Improvement Cost: $1,866,000,  Total Project Cost: $5,052,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 104023,  Location: 1.9 MI S JCT RTS203+I90 (Lat: 42.461544,  Lng: -73.643153),  Route carried "on" structure: State highway 203,  Year Built: 1939,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 1,568 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,635 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: VALATIE KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.686,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.22m (7.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,258,000,  Roadway Improvement Cost: $736,000,  Total Project Cost: $1,994,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104024,  Location: 0.5MI.S JCT.RTS203+I90 (Lat: 42.475417,  Lng: -73.631764),  Route carried "on" structure: State highway 203,  Year Built: 1984,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 1,568 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,635 (year 2040),  Design Load: HS 20,  Features Intersected: VALATIE KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.778,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 41.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $522,000,  Roadway Improvement Cost: $306,000,  Total Project Cost: $827,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 222216,  Location: .6 MI S OF CHATHAM CENTER (Lat: 42.409631,  Lng: -73.616617),  Route carried "on" structure: Other road ,  Year Built: 2014,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 298 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 417 (year 2039),  Design Load: HL 93,  Features Intersected: CSX TRANS/ AMTRAK,  Facility Carried by Structure: WHITE MILLS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.869,  Lanes on structure: 2,  Owner: Railroad,  Maintenance Responsibility: Town or Township Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.5m (70.5ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 60.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.34m (7.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,080,000,  Roadway Improvement Cost: $632,000,  Total Project Cost: $1,712,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 222218,  Location: 2 MILES EAST OF VALATIE (Lat: 42.420528,  Lng: -73.633753),  Route carried "on" structure: Other road ,  Year Built: 1930,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 106 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 148 (year 2035),  Features Intersected: CSX TRANS/ AMTRAK,  Facility Carried by Structure: GOOLD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: Railroad,  Maintenance Responsibility: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 56.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Bridge Improvement Cost: $689,000,  Roadway Improvement Cost: $404,000,  Total Project Cost: $1,093,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 32221,  Location: 1.8 MI S OF MALDEN BRIDGE (Lat: 42.443947,  Lng: -73.584306),  Route carried "on" structure: Other road ,  Year Built: 1941,  Status: Posted for load,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 169 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 237 (year 2040),  Design Load: H 20,  Features Intersected: TRIBUTARY KINDERHOOK CRE,  Facility Carried by Structure: SHAKER MUSEUM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.432,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 17.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 13.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $586,000,  Roadway Improvement Cost: $343,000,  Total Project Cost: $929,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33422,  Location: 2.8 MI NW OF EAST CHATHAM (Lat: 42.439742,  Lng: -73.564467),  Route carried "on" structure: County highway ,  Year Built: 1932,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 711 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 995 (year 2040),  Features Intersected: SHAKER STREAM,  Facility Carried by Structure: COUNTY ROAD 13
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.358,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $807,000,  Roadway Improvement Cost: $472,000,  Total Project Cost: $1,279,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334222,  Location: 1.8 MI S OF N CHATHAM (Lat: 42.464372,  Lng: -73.632586),  Route carried "on" structure: County highway ,  Year Built: 1935,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 1,247 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,300 (year 2040),  Features Intersected: VALATIE KILL,  Facility Carried by Structure: COUNTY ROAD 17
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.714,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $784,000,  Roadway Improvement Cost: $459,000,  Total Project Cost: $1,244,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334224,  Location: 2.1 MI N OF VALATIE (Lat: 42.443208,  Lng: -73.664858),  Route carried "on" structure: County highway ,  Year Built: 2004,  Status: Open,  Structure Length: 2.11m (6.92ft),  Average Daily Traffic: 2,338 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,892 (year 2040),  Features Intersected: VALATIE KILL,  Facility Carried by Structure: COUNTY ROAD 28
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.977,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.0m (65.6ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.0m,  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.11m (6.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $782,000,  Roadway Improvement Cost: $458,000,  Total Project Cost: $1,240,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5040251,  Location: JCT RTS 203 & 90 (Lat: 42.480728,  Lng: -73.625033),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 12,236 (year 2014),  Truck Traffic: 26%,  Design Load: H 20,  Features Intersected: RTE 203
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.368,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 41.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,003,000,  Roadway Improvement Cost: $588,000,  Total Project Cost: $1,591,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5040252,  Location: JCT RTS 203 & 90 (Lat: 42.480256,  Lng: -73.625381),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 9,146 (year 2020),  Truck Traffic: 38%,  Average Future Daily Traffic: 10,893 (year 2040),  Design Load: H 20,  Features Intersected: RTE 203
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.677,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,003,000,  Roadway Improvement Cost: $588,000,  Total Project Cost: $1,591,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5513451,  Location: 0.4 MI NW INT RTS 90I<203 (Lat: 42.482114,  Lng: -73.630872),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 9,146 (year 2020),  Truck Traffic: 38%,  Average Future Daily Traffic: 10,893 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: VALATIE KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.178,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Fair,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 56.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.46m (8.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,105,000,  Roadway Improvement Cost: $647,000,  Total Project Cost: $1,752,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 5513452,  Location: 0.4 MI NW JCT RTS 90I<203 (Lat: 42.482603,  Lng: -73.630603),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 12,236 (year 2014),  Truck Traffic: 26%,  Design Load: HS 20+Mod,  Features Intersected: VALATIE KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.870,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 56.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.46m (8.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,105,000,  Roadway Improvement Cost: $647,000,  Total Project Cost: $1,752,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 5515211,  Location: 1.7 MI W OF MALDEN BRIDGE (Lat: 42.475192,  Lng: -73.615686),  Route carried "on" structure: Interstate 90,  Year Built: 1958,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 12,236 (year 2014),  Truck Traffic: 20%,  Design Load: HS 20+Mod,  Features Intersected: COUNTY ROAD 32
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.302,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.18m (20.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,994,000,  Roadway Improvement Cost: $2,339,000,  Total Project Cost: $6,333,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5515212,  Location: 1.7 MI W OF MALDEN BRIDGE (Lat: 42.475258,  Lng: -73.616500),  Route carried "on" structure: Interstate 90,  Year Built: 1958,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 9,162 (year 2020),  Truck Traffic: 38%,  Average Future Daily Traffic: 16,061 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: COUNTY ROAD 32
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.869,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.33m (20.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,950,000,  Roadway Improvement Cost: $2,313,000,  Total Project Cost: $6,262,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5515221,  Location: 0.7 MI S OF MALDEN BRIDGE (Lat: 42.461775,  Lng: -73.588914),  Route carried "on" structure: Interstate 90,  Year Built: 1958,  Status: Open,  Structure Length: 7.65m (25.10ft),  Average Daily Traffic: 12,236 (year 2014),  Truck Traffic: 20%,  Design Load: HS 20+Mod,  Features Intersected: KINDERHOOK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1305.462,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.7m (81.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.65m (25.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,817,000,  Roadway Improvement Cost: $2,235,000,  Total Project Cost: $6,052,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5515222,  Location: 0.7 MI S OF MALDEN BRIDGE (Lat: 42.461400,  Lng: -73.588925),  Route carried "on" structure: Interstate 90,  Year Built: 1958,  Status: Open,  Structure Length: 7.65m (25.10ft),  Average Daily Traffic: 9,162 (year 2020),  Truck Traffic: 38%,  Average Future Daily Traffic: 16,061 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: KINDERHOOK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.813,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.7m (81.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.65m (25.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,817,000,  Roadway Improvement Cost: $2,235,000,  Total Project Cost: $6,052,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 551523,  Location: 0.8 MI S OF MALDEN BRIDGE (Lat: 42.458647,  Lng: -73.582681),  Route carried "on" structure: Other road ,  Year Built: 1958,  Status: Open,  Structure Length: 8.02m (26.31ft),  Average Daily Traffic: 169 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 237 (year 2040),  Design Load: H 20,  Features Intersected: 90IX WB, RTE I90,  Facility Carried by Structure: SHAKER MUSEUM RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.105,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.01m (26.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,837,000,  Roadway Improvement Cost: $1,661,000,  Total Project Cost: $4,498,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 551524,  Location: 1.8 MI SE OF MALDEN BRIDG (Lat: 42.446433,  Lng: -73.567092),  Route carried "on" structure: Other road ,  Year Built: 1958,  Status: Open,  Structure Length: 14.87m (48.79ft),  Average Daily Traffic: 531 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 743 (year 2040),  Design Load: H 20,  Features Intersected: RTE I90, 90IX WB,  Facility Carried by Structure: ALBANY TURNPIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.712,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 36.9m (121.1ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.87m (48.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $5,823,000,  Roadway Improvement Cost: $3,410,000,  Total Project Cost: $9,233,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 102905,  Location: JCT S.H.66 & I90 (Lat: 42.461917,  Lng: -73.591439),  Route carried "under" structure: Interstate 90,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 11,700 (year 1979),  Features Intersected: 90IX WB, RTE I90,  Facility Carried by Structure: RTE 66
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 18.037,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.0m (59.1ft)

Find on map >>   Show street view

Structure Number: 5040251,  Location: JCT RTS 203 & 90 (Lat: 42.480728,  Lng: -73.625033),  Route carried "under" structure: State highway 203,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 1,753 (year 2014),  Features Intersected: RTE 203,  Facility Carried by Structure: RTE I90
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 2.880,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>   Show street view

Structure Number: 5040252,  Location: JCT RTS 203 & 90 (Lat: 42.480256,  Lng: -73.625381),  Route carried "under" structure: State highway 203,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 1,753 (year 2014),  Features Intersected: RTE 203,  Facility Carried by Structure: RTE I90
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 2.880,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>   Show street view

Structure Number: 5515211,  Location: 1.7 MI W OF MALDEN BRIDGE (Lat: 42.475192,  Lng: -73.615686),  Route carried "under" structure: County highway ,  Year Built: 1958,  Structure Length: 0. m,  Features Intersected: COUNTY ROAD 32,  Facility Carried by Structure: RTE I90
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 1.094,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 5515212,  Location: 1.7 MI W OF MALDEN BRIDGE (Lat: 42.475258,  Lng: -73.616500),  Route carried "under" structure: County highway ,  Year Built: 1958,  Structure Length: 0. m,  Features Intersected: COUNTY ROAD 32,  Facility Carried by Structure: RTE I90
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 551523,  Location: 0.8 MI S OF MALDEN BRIDGE (Lat: 42.458647,  Lng: -73.582681),  Route carried "under" structure: Interstate 90,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 11,451 (year 1977),  Features Intersected: 90IX WB, RTE I90,  Facility Carried by Structure: SHAKER MUSEUM RD
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 18.857,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 551524,  Location: 1.8 MI SE OF MALDEN BRIDG (Lat: 42.446433,  Lng: -73.567092),  Route carried "under" structure: Interstate 90,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 11,451 (year 1977),  Features Intersected: RTE I90, 90IX WB,  Facility Carried by Structure: ALBANY TURNPIKE
Minimum Vertical Clearance: 7.01m (23.00ft),  Kilometerpoint: 1307.940,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.9m (121.1ft)

Find on map >>   Show street view

Structure Number: 700546,  Location: 0.7MI S JCT RTS 9 & 90I (Lat: 42.471617,  Lng: -73.687781),  Route carried "under" structure: US 9,  Year Built: 1924,  Structure Length: 0. m,  Average Daily Traffic: 14,098 (year 2000),  Features Intersected: RTE 9,  Facility Carried by Structure: CSX TRANSPRTATION
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 28.447,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 9.7m (31.8ft)

Find on map >>   Show street view

Structure Number: 704022,  Location: IN NIVERVILLE (Lat: 42.436517,  Lng: -73.653567),  Route carried "under" structure: State highway 203,  Year Built: 1928,  Structure Length: 0. m,  Average Daily Traffic: 1,498 (year 2002),  Features Intersected: RTE 203, EX-ALB & HDSON,  Facility Carried by Structure: CSX TRANSPRTATION
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 26.790,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 16.4m (53.8ft)

Find on map >>   Show street view

Structure Number: 771333,  Location: 2.0 MI N OF VALATIE (Lat: 42.440242,  Lng: -73.658647),  Route carried "under" structure: County highway ,  Year Built: 1903,  Structure Length: 0. m,  Features Intersected: PARKER HL RD-CR25,  Facility Carried by Structure: CSX TRANSPRTATION
Minimum Vertical Clearance: 3.99m (13.09ft),  Kilometerpoint: 0.000,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 10.0m (32.8ft)

Discuss Niverville, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.