Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Noonday, Texas (TX)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 413ft / 126mTotal length
  • $28,000Total costs
  • 42,888Total average daily traffic
  • 3,242Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Noonday
  • No street view available for this location

New bridges in Noonday, TX - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 11960-1969
  • 42000-2009
  • 102010-2019
Average Bridge Daily Traffic in Noonday, TX
Average Bridge Truck Traffic in Noonday, TX
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Very good
  • 90.0%Good
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Very good
  • 80.0%Good
  • 10.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.0%Very good
  • 70.0%Good
  • 10.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 18.2%Very good
  • 18.2%Good
  • 63.6%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 102120016404026,  Location: AT HENDERSON CL (Lat: 32.315283,  Lng: -95.452822),  Route carried "on" structure: State highway 31,  Year Built: 1946,  Year Reconstructed: 1975,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 9,834 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 12,610 (year 2033),  Design Load: H 20,  Features Intersected: NECHES RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2021,  Underwater Inspection Date: November 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 102120088903013,  Location: 1.3 MI SE OF SH 155 (Lat: 32.211739,  Lng: -95.395806),  Route carried "on" structure: State highway 2868,  Year Built: 1966,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 3,834 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,400 (year 2033),  Design Load: HS 20,  Features Intersected: SALINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.099,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 102120AA0168001,  Location: 0.80 MI E OF SH 155 (Lat: 32.230083,  Lng: -95.394761),  Route carried "on" structure: County highway 168,  Year Built: 2000,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 2,360 (year 2018),  Average Future Daily Traffic: 1,500 (year 2035),  Design Load: HS 20,  Features Intersected: SALINE CREEK
Minimum Vertical Clearance: 6.30m (20.67ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $19,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $24,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 102120AA1113001,  Location: 3.20 MI SW OF SH 155 (Lat: 32.281994,  Lng: -95.383533),  Route carried "on" structure: County highway 1113,  Year Built: 2019,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 1,960 (year 2009),  Average Future Daily Traffic: 1,100 (year 2029),  Design Load: HL 93,  Features Intersected: Butler Cr
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.369,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 102120AA1141101,  Location: 0.50 MI N OF CR 1113 (Lat: 32.278961,  Lng: -95.411147),  Route carried "on" structure: County highway 1141,  Year Built: 2002,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 220 (year 2015),  Average Future Daily Traffic: 250 (year 2035),  Features Intersected: BUTLER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $3,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $4,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 102120TL0049035,  Location: 3.8 MI W OF US 69 (Lat: 32.242056,  Lng: -95.373514),  Route carried "on" structure: Other road 49,  Year Built: 2006,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 240 (year 2011),  Truck Traffic: 38%,  Average Future Daily Traffic: 400 (year 2031),  Design Load: HS 20,  Features Intersected: SALINE CR TR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.347,  Lanes on structure: 2,  Toll: On toll road,  Owner: Local Toll Authority,  Approaching Roadway Width: 15.9m (52.2ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.5m (4.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: 102120TL0049036,  Location: 4.3 MI W OF US 69 (Lat: 32.243436,  Lng: -95.380814),  Route carried "on" structure: Other road 49,  Year Built: 2006,  Status: Open,  Structure Length: 15.24m (50.00ft),  Average Daily Traffic: 240 (year 2011),  Truck Traffic: 38%,  Average Future Daily Traffic: 400 (year 2031),  Design Load: HS 25 or greater,  Features Intersected: SALINE CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.027,  Lanes on structure: 2,  Toll: On toll road,  Owner: Local Toll Authority,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 102120TL0049037,  Location: AT SH 155, SW OF TYLER (Lat: 32.249442,  Lng: -95.390650),  Route carried "on" structure: Other road 49,  Year Built: 2012,  Status: Open,  Structure Length: 18.59m (60.99ft),  Average Daily Traffic: 1,000 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,500 (year 2033),  Design Load: HL 93,  Features Intersected: SH 155/SALINE CR TR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.161,  Lanes on structure: 2,  Lanes under structure: 5,  Toll: On toll road,  Owner: Local Toll Authority,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 102120TL0049038,  Location: 0.95 MI NW OF SH 155 (Lat: 32.257078,  Lng: -95.404014),  Route carried "on" structure: County highway 196,  Year Built: 2011,  Status: Open,  Structure Length: 11.28m (37.01ft),  Average Daily Traffic: 100 (year 2011),  Truck Traffic: 5%,  Average Future Daily Traffic: 200 (year 2031),  Design Load: HL 93,  Features Intersected: TOLL 49
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 160.933,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: Local Toll Authority,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 102120TL0049039,  Location: 4.45 MI S OF SH 31 (Lat: 32.266186,  Lng: -95.408625),  Route carried "on" structure: Other road 49,  Year Built: 2012,  Status: Open,  Structure Length: 18.29m (60.01ft),  Average Daily Traffic: 1,000 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,500 (year 2033),  Design Load: HL 93,  Features Intersected: TAYLOR CR TR 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.759,  Lanes on structure: 2,  Toll: On toll road,  Owner: Local Toll Authority,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 102120TL004904,  Location: 4.1 MI S OF SH 31 (Lat: 32.270558,  Lng: -95.409956),  Route carried "on" structure: Other road 49,  Year Built: 2012,  Status: Open,  Structure Length: 20.12m (66.01ft),  Average Daily Traffic: 1,000 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,500 (year 2033),  Design Load: HL 93,  Features Intersected: CR 1113/TAYLOR CR TR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Owner: Local Toll Authority,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 102120TL0049041,  Location: 3.6 MI S OF SH 31 (Lat: 32.278528,  Lng: -95.410133),  Route carried "on" structure: Other road 49,  Year Built: 2012,  Status: Open,  Structure Length: 18.29m (60.01ft),  Average Daily Traffic: 1,000 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,500 (year 2033),  Design Load: HL 93,  Features Intersected: BUTLER CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.143,  Lanes on structure: 2,  Toll: On toll road,  Owner: Local Toll Authority,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 102120TL0049042,  Location: 2.95 MI N of SH 155 (Lat: 32.285547,  Lng: -95.410531),  Route carried "on" structure: County highway 1130,  Year Built: 2011,  Status: Open,  Structure Length: 10.97m (35.99ft),  Average Daily Traffic: 100 (year 2011),  Truck Traffic: 5%,  Average Future Daily Traffic: 200 (year 2031),  Design Load: HL 93,  Features Intersected: TOLL 49
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: Local Toll Authority,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place
Structure Number: 102120TL0049037,  Location: AT SH 155, SW OF TYLER,  Route carried "under" structure: State highway 155,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 17,000 (year 2013),  Truck Traffic: 5%,  Features Intersected: SH 155/SALINE CR TR,  Facility Carried by Structure: TOLL 49
Minimum Vertical Clearance: 5.89m (19.32ft),  Kilometerpoint: 28.530,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 102120TL0049038,  Location: 0.95 MI NW OF SH 155 (Lat: 32.257078,  Lng: -95.404014),  Route carried "under" structure: Other road 49,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 1,500 (year 2013),  Features Intersected: TOLL 49,  Facility Carried by Structure: CR 196
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 41.669,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 102120TL0049042,  Location: 2.95 MI N of SH 155 (Lat: 32.285547,  Lng: -95.410531),  Route carried "under" structure: Other road 49,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 1,500 (year 2013),  Features Intersected: TOLL 49,  Facility Carried by Structure: CR 1130
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 44.762,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Discuss Noonday, Texas (TX) on our hugely popular Texas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.