Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for North Amityville, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 43ft / 13.2mTotal length
  • $26,602,000Total costs
  • 589,503Total average daily traffic
  • 5,129Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for North Amityville
  • No street view available for this location

New bridges in North Amityville, NY - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 11940-1949
  • 71950-1959
Average Bridge Daily Traffic in North Amityville, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Good
  • 66.7%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 60.0%Good
  • 40.0%Satisfactory
Find on map >>   Show street view

Structure Number: 1036949,  Location: JCT SH 110 & SSP (Lat: 40.706919,  Lng: -73.428128),  Route carried "on" structure: State highway 110,  Year Built: 1939,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 42,100 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 48,574 (year 2040),  Design Load: H 20,  Features Intersected: RTE 908M
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.167,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.5m (77.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.2m (59.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 23.3m (76.4ft),  Out-to-Out Width: 28.0m (91.9ft)

Condition: Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 81.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $3,972,000,  Roadway Improvement Cost: $2,326,000,  Total Project Cost: $6,298,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 105709,  Location: .2 MI E JCT SH 110 & SSP (Lat: 40.707589,  Lng: -73.423953),  Route carried "on" structure: County highway ,  Year Built: 1940,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 14,699 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 17,856 (year 2040),  Design Load: H 20,  Features Intersected: SSP CLOSED GAS STA, SPAN,  Facility Carried by Structure: GREAT NECK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.213,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 24 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.77m (9.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,597,000,  Roadway Improvement Cost: $1,521,000,  Total Project Cost: $4,118,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 105774,  Location: .2 MI E JCT SH 110 & SSP (Lat: 40.707864,  Lng: -73.424361),  Route carried "on" structure: County highway ,  Year Built: 1959,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 14,699 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 17,856 (year 2040),  Design Load: H 20,  Features Intersected: RTE 908M, CLOSED SERVICE,  Facility Carried by Structure: GREAT NECK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.245,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 24 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 24.3m (79.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.62m (11.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,894,000,  Roadway Improvement Cost: $1,695,000,  Total Project Cost: $4,588,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1057949,  Location: JCT SH 110 & SSP (Lat: 40.707167,  Lng: -73.428064),  Route carried "on" structure: State highway 110,  Year Built: 1957,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 42,100 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 48,574 (year 2040),  Features Intersected: RTE 908M
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.167,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.3m (76.4ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 23.3m (76.4ft),  Out-to-Out Width: 28.0m (91.9ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 66.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.25m (7.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $4,836,000,  Roadway Improvement Cost: $2,832,000,  Total Project Cost: $7,668,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 105974,  Location: .2 MI E JCT SH 110 & SSP (Lat: 40.707450,  Lng: -73.423706),  Route carried "on" structure: County highway ,  Year Built: 1959,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 14,699 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 17,856 (year 2040),  Design Load: H 20,  Features Intersected: RTE 908M,  Facility Carried by Structure: GREAT NECK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.181,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 24 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.3m (79.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 64.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,479,000,  Roadway Improvement Cost: $1,452,000,  Total Project Cost: $3,930,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1036949,  Location: JCT SH 110 & SSP (Lat: 40.706919,  Lng: -73.428128),  Route carried "under" structure: State highway 908M,  Year Built: 1939,  Structure Length: 0. m,  Average Daily Traffic: 143,402 (year 2002),  Features Intersected: RTE 908M,  Facility Carried by Structure: RTE 110
Minimum Vertical Clearance: 4.01m (13.16ft),  Kilometerpoint: 0.209,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 18.2m (59.7ft)

Find on map >>   Show street view

Structure Number: 105774,  Location: .2 MI E JCT SH 110 & SSP (Lat: 40.707864,  Lng: -73.424361),  Route carried "under" structure: State highway 908M,  Year Built: 1959,  Structure Length: 0. m,  Features Intersected: RTE 908M, CLOSED SERVICE,  Facility Carried by Structure: GREAT NECK ROAD
Minimum Vertical Clearance: 4.06m (13.32ft),  Kilometerpoint: 0.611,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 24.3m (79.7ft)

Find on map >>   Show street view

Structure Number: 1057949,  Location: JCT SH 110 & SSP (Lat: 40.707167,  Lng: -73.428064),  Route carried "under" structure: State highway 908M,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 143,402 (year 2002),  Features Intersected: RTE 908M,  Facility Carried by Structure: RTE 110
Minimum Vertical Clearance: 4.06m (13.32ft),  Kilometerpoint: 0.209,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 105974,  Location: .2 MI E JCT SH 110 & SSP (Lat: 40.707450,  Lng: -73.423706),  Route carried "under" structure: State highway 908M,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 143,402 (year 2002),  Features Intersected: RTE 908M,  Facility Carried by Structure: GREAT NECK ROAD
Minimum Vertical Clearance: 4.24m (13.91ft),  Kilometerpoint: 0.611,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 24.3m (79.7ft)

Find on map >>   Show street view

Structure Number: 705721,  Location: .9 MI E JCT RTS 110+109 (Lat: 40.717108,  Lng: -73.408006),  Route carried "under" structure: Ramp Other road ,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 31,000 (year 1977),  Features Intersected: SSP EB TO 109 SB,  Facility Carried by Structure: LIRR BABYLON
Minimum Vertical Clearance: 3.86m (12.66ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 16.7m (54.8ft)

Discuss North Amityville, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.