Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for North Atlanta, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 20Number of bridges
  • 154ft / 46.9mTotal length
  • $18,761,000Total costs
  • 634,414Total average daily traffic
  • 7,375Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for North Atlanta
  • No street view available for this location

New bridges in North Atlanta, GA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 31960-1969
  • 11970-1979
  • 41980-1989
  • 12000-2009
Average Bridge Daily Traffic in North Atlanta, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 77.8%Good
  • 22.2%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Very good
  • 88.9%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Very good
  • 77.8%Good
  • 11.1%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.3%Excellent
  • 28.6%Very good
  • 42.9%Good
  • 14.3%Poor
Find on map >>   Show street view

Structure Number: 89002,  Location: 5.1 MI NW OF DECATUR (Lat: 33.831408,  Lng: -84.342697),  Route carried "on" structure: State highway 13,  Year Built: 1974,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 34,590 (year 2011),  Truck Traffic: 4%,  Average Future Daily Traffic: 51,885 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: N FORK PEACHTREE CREEK,  Facility Carried by Structure: BUFORD HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 27.6m (90.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,524,000,  Roadway Improvement Cost: $152,000,  Total Project Cost: $2,286,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 890021,  Location: 5.6 MI N OF DECATUR (Lat: 33.849531,  Lng: -84.321403),  Route carried "on" structure: State highway 13,  Year Built: 1935,  Year Reconstructed: 1971,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 25,600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 38,400 (year 2031),  Design Load: H 15,  Features Intersected: N FORK P'TREE CREEK TRIB,  Facility Carried by Structure: BUFORD HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 9 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $212,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $319,000
Find on map >>   Show street view

Structure Number: 89003,  Location: 4.8 MI N OF DECATUR (Lat: 33.832097,  Lng: -84.335319),  Route carried "on" structure: State highway 42,  Year Built: 1981,  Status: Open,  Structure Length: 10.97m (35.99ft),  Average Daily Traffic: 50,570 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 75,855 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-85- I-85 RAMP,  Facility Carried by Structure: N. DRUID HILLS RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 8,  Lanes under structure: 13,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 31.7m (104.0ft),  Skew: 23 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 33.8m (110.9ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 31.7m (104.0ft),  Out-to-Out Width: 36.7m (120.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $3,708,000,  Roadway Improvement Cost: $371,000,  Total Project Cost: $5,562,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 890031,  Location: 5 MI NW OF DECATUR (Lat: 33.833219,  Lng: -84.338839),  Route carried "on" structure: State highway 42,  Year Built: 1962,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 50,570 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 75,855 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: N FORK PEACHTREE CREEK,  Facility Carried by Structure: N. DRUID HILLS RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 21 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 25.8m (84.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 34.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,552,000,  Roadway Improvement Cost: $155,000,  Total Project Cost: $2,328,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 890063,  Location: 4.2 MI SW OF CHAMBLEE (Lat: 33.835756,  Lng: -84.327336),  Route carried "on" structure: Interstate 85,  Year Built: 1981,  Status: Open,  Structure Length: 5.88m (19.29ft),  Average Daily Traffic: 200,230 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 300,345 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: M-9217 ACCESS RD TURN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 144.841,  Lanes on structure: 12,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 50.6m (166.0ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.6m (97.1ft),  Curb-To-Curb Width: 51.2m (168.0ft),  Out-to-Out Width: 52.1m (170.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,811,000,  Roadway Improvement Cost: $281,000,  Total Project Cost: $4,216,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 895053,  Location: IN BROOKHAVEN (Lat: 33.856178,  Lng: -84.343108),  Route carried "on" structure: County highway 1673,  Year Built: 1980,  Status: Open,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: MARTA-NS RAILROAD,  Facility Carried by Structure: COLONIAL DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 44.99m (147.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $610,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $914,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 895054,  Location: 0.5 MI S OF BROOKHAVEN (Lat: 33.852719,  Lng: -84.344208),  Route carried "on" structure: County highway 1675,  Year Built: 1984,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Design Load: HS 15,  Features Intersected: N FORK P'TREE CREEK TRIB,  Facility Carried by Structure: PINE GROVE AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 89506,  Location: 3.3 MI W OF CHAMBLEE (Lat: 33.893281,  Lng: -84.347231),  Route carried "on" structure: County highway 1887,  Year Built: 1965,  Status: Open,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Design Load: H 15,  Features Intersected: NANCY CREEK,  Facility Carried by Structure: MILL CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $516,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $774,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 89507,  Location: 5 MI NW OF CLARKSTON (Lat: 33.835644,  Lng: -84.335911),  Route carried "on" structure: County highway 3105,  Year Built: 1967,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Features Intersected: N FORK PEACHTREE CREEK,  Facility Carried by Structure: CORPORATE BLVD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $918,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $1,377,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 895147,  Location: 5 MI S OF CHAMBLEE (Lat: 33.841794,  Lng: -84.321950),  Route carried "on" structure: County highway 1644,  Year Built: 2005,  Status: Open,  Structure Length: 4.24m (13.91ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: N FORK PEACHTREE CREEK,  Facility Carried by Structure: BRIARWOOD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.4m (139.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $543,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $815,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 89003,  Location: 4.8 MI N OF DECATUR (Lat: 33.832097,  Lng: -84.335319),  Route carried "under" structure: Interstate 85,  Structure Length: 0. m,  Average Daily Traffic: 197,000 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 42 N. DRUID HILLS RD.,  Facility Carried by Structure: N. DRUID HILLS RD.
Minimum Vertical Clearance: 6.78m (22.24ft),  Kilometerpoint: 143.232,  Lanes on structure: 8,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 89003,  Location: 4.8 MI N OF DECATUR (Lat: 33.832097,  Lng: -84.335319),  Route carried "under" structure: Ramp Interstate 85,  Structure Length: 0. m,  Average Daily Traffic: 2,750 (year 1996),  Truck Traffic: 1%,  Features Intersected: SR 42 N. DRUID HILLS RD.,  Facility Carried by Structure: N. DRUID HILLS RD.
Minimum Vertical Clearance: 6.07m (19.91ft),  Kilometerpoint: 143.232,  Lanes on structure: 8,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 890063,  Location: 4.2 MI SW OF CHAMBLEE (Lat: 33.835756,  Lng: -84.327336),  Route carried "under" structure: City street 9217,  Structure Length: 0. m,  Average Daily Traffic: 3,200 (year 2009),  Truck Traffic: 1%,  Features Intersected: I-85,  Facility Carried by Structure: I-85
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 1.609,  Lanes on structure: 12,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 890245,  Location: 3.2 MI SW OF CHAMBLEE (Lat: 33.857681,  Lng: -84.340397),  Route carried "under" structure: City street 9240,  Structure Length: 0. m,  Average Daily Traffic: 12,370 (year 2011),  Truck Traffic: 1%,  Features Intersected: M-9240 N. DRUID HILLS RD,  Facility Carried by Structure: NORFOLK SOUTHERN R
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 1.609,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 890246,  Location: 3.3 MI SW OF CHAMBLEE (Lat: 33.860686,  Lng: -84.338581),  Route carried "under" structure: City street 9266,  Structure Length: 0. m,  Average Daily Traffic: 8,690 (year 2011),  Truck Traffic: 1%,  Features Intersected: M-9266 DRESDEN DRIVE,  Facility Carried by Structure: NORFOLK SOUTHERN R
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.000,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 890263,  Location: 3.2 MI SW OF CHAMBLEE (Lat: 33.857889,  Lng: -84.340508),  Route carried "under" structure: City street 9240,  Structure Length: 0. m,  Average Daily Traffic: 12,370 (year 2011),  Truck Traffic: 1%,  Features Intersected: M-9240 N. DRUID HILLS RD,  Facility Carried by Structure: MARTA TRAINS
Minimum Vertical Clearance: 6.35m (20.83ft),  Kilometerpoint: 1.609,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 890264,  Location: 3.2 MI SW OF CHAMBLEE (Lat: 33.858033,  Lng: -84.340517),  Route carried "under" structure: City street 9240,  Structure Length: 0. m,  Average Daily Traffic: 12,370 (year 2011),  Truck Traffic: 1%,  Features Intersected: M-9240 N. DRUID HILLS RD,  Facility Carried by Structure: MARTA TRAINS
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 1.609,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 890265,  Location: 3 MI SW OF CHAMBLEE (Lat: 33.860706,  Lng: -84.339050),  Route carried "under" structure: City street 9266,  Structure Length: 0. m,  Average Daily Traffic: 8,690 (year 2011),  Truck Traffic: 1%,  Features Intersected: M-9266 DRESDEN DRIVE,  Facility Carried by Structure: MARTA BRIDGE
Minimum Vertical Clearance: 5.30m (17.39ft),  Kilometerpoint: 0.000,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 895103,  Location: 0.5 MI SW OF CHAMBLEE (Lat: 33.876378,  Lng: -84.325417),  Route carried "under" structure: County highway 1940,  Structure Length: 0. m,  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Features Intersected: CR 1940 REDDING ROAD,  Facility Carried by Structure: NORFOLK SOUTHERN R
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 1.609,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 895104,  Location: 0.5 MI SWT OF CHAMBLEE (Lat: 33.876539,  Lng: -84.325503),  Route carried "under" structure: County highway 1940,  Structure Length: 0. m,  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Features Intersected: CR 1940 REDDING ROAD,  Facility Carried by Structure: MARTA BRIDGE
Minimum Vertical Clearance: 6.47m (21.23ft),  Kilometerpoint: 1.609,  Length of Maximum Span: 0.0m

Discuss North Atlanta, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.