Bridge Statistics for North Babylon, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 115ft / 34.5mTotal length
  • $44,146,000Total costs
  • 685,009Total average daily traffic
  • 11,126Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for North Babylon
  • No street view available for this location

New bridges in North Babylon, NY - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 21950-1959
  • 51960-1969
  • 61970-1979
Reconstructed bridges in North Babylon, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 01980-1989
  • 11990-1999
Average Bridge Daily Traffic in North Babylon, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 66.7%Good
  • 33.3%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 37.5%Good
  • 37.5%Satisfactory
  • 25.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Very good
  • 25.0%Good
  • 62.5%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Very good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 1018329,  Location: 2.0 MI E JCT RTS 27+109 (Lat: 40.714475,  Lng: -73.331314),  Route carried "on" structure: State highway 27,  Year Built: 1932,  Year Reconstructed: 1966,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 73,172 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 87,038 (year 2040),  Design Load: HS 20,  Features Intersected: CARLLS RIVER, PARK PED.&
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.994,  Lanes on structure: 12,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 47.5m (155.8ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 47.5m (155.8ft),  Out-to-Out Width: 69.5m (228.0ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 76.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $3,054,000,  Roadway Improvement Cost: $1,788,000,  Total Project Cost: $4,842,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1018341,  Location: JCT SH 231 & SH 27 (Lat: 40.717797,  Lng: -73.314350),  Route carried "on" structure: State highway 231,  Year Built: 1971,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 13,075 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 15,552 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: 27 27 07051065, 27 27
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.365,  Lanes on structure: 3,  Lanes under structure: 12,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.6m (80.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.53m (27.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $4,167,000,  Roadway Improvement Cost: $2,440,000,  Total Project Cost: $6,607,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1018342,  Location: JCT SH 231 & SH 27 (Lat: 40.717981,  Lng: -73.314106),  Route carried "on" structure: State highway 231,  Year Built: 1971,  Status: Open,  Structure Length: 8.66m (28.41ft),  Average Daily Traffic: 13,075 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 15,552 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: 27 27 0705 1065 W/B Serv
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.365,  Lanes on structure: 3,  Lanes under structure: 12,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.6m (80.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.65m (28.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $4,250,000,  Roadway Improvement Cost: $2,489,000,  Total Project Cost: $6,739,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104218,  Location: JCT SH 231 & SSP (Lat: 40.732108,  Lng: -73.320669),  Route carried "on" structure: State highway 231,  Year Built: 1950,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 40,732 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 48,450 (year 2040),  Features Intersected: 908M908M07021063 WB, RTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.135,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 3.5m (11.5ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.29m (10.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,378,000,  Roadway Improvement Cost: $1,978,000,  Total Project Cost: $5,357,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 105625,  Location: JCT SH 231 & SSP (Lat: 40.731953,  Lng: -73.320858),  Route carried "on" structure: State highway 231,  Year Built: 1968,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 26,150 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 31,105 (year 2040),  Design Load: HS 20,  Features Intersected: 908M908M07021063 WB, RTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.135,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 2.8m (9.2ft),  Right: 0.0m,  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.11m (13.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,696,000,  Roadway Improvement Cost: $2,164,000,  Total Project Cost: $5,860,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 105981,  Location: BETWEEN EXITS 37 & 38 - S (Lat: 40.732097,  Lng: -73.341514),  Route carried "on" structure: Ramp Other road ,  Year Built: 1960,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 3,708 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,191 (year 2038),  Design Load: HS 20,  Features Intersected: CARLLS RIVER, PEDESTRIAN,  Facility Carried by Structure: SYLVAN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $520,000,  Roadway Improvement Cost: $305,000,  Total Project Cost: $825,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1059829,  Location: .9 MI W JCT RTS 231+SSP (Lat: 40.733147,  Lng: -73.338389),  Route carried "on" structure: State highway 908M,  Year Built: 1962,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 130,667 (year 2020),  Average Future Daily Traffic: 155,428 (year 2040),  Features Intersected: BELMONT PK ENTR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.624,  Lanes on structure: 7,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 35.7m (117.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 35.7m (117.1ft),  Out-to-Out Width: 37.4m (122.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 79.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,693,000,  Roadway Improvement Cost: $1,577,000,  Total Project Cost: $4,271,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 106401,  Location: 2.3 MI E JCT SH 27 & SH10 (Lat: 40.716289,  Lng: -73.322111),  Route carried "on" structure: County highway ,  Year Built: 1972,  Status: Open,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 13,806 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 16,771 (year 2040),  Design Load: HS 20,  Features Intersected: 27 27 07051061 Service,,  Facility Carried by Structure: DEER PARK AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.611,  Lanes on structure: 3,  Lanes under structure: 10,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.3m (56.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 59.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.01m (23.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $6,083,000,  Roadway Improvement Cost: $3,562,000,  Total Project Cost: $9,645,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1018341,  Location: JCT SH 231 & SH 27 (Lat: 40.717797,  Lng: -73.314350),  Route carried "under" structure: State highway 27,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 40,200 (year 1973),  Features Intersected: 27 27 07051065, 27 27,  Facility Carried by Structure: RTE 231
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 10.491,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.6m (80.7ft)

Find on map >>   Show street view

Structure Number: 1018342,  Location: JCT SH 231 & SH 27 (Lat: 40.717981,  Lng: -73.314106),  Route carried "under" structure: State highway 27,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 40,200 (year 1973),  Features Intersected: 27 27 0705 1065 W/B Serv,  Facility Carried by Structure: RTE 231
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 9.799,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.6m (80.7ft)

Find on map >>   Show street view

Structure Number: 104218,  Location: JCT SH 231 & SSP (Lat: 40.732108,  Lng: -73.320669),  Route carried "under" structure: State highway 908M,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 119,012 (year 2002),  Features Intersected: 908M908M07021063 WB, RTE,  Facility Carried by Structure: RTE 231
Minimum Vertical Clearance: 4.06m (13.32ft),  Kilometerpoint: 10.459,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Length of Maximum Span: 15.5m (50.9ft)

Find on map >>   Show street view

Structure Number: 105625,  Location: JCT SH 231 & SSP (Lat: 40.731953,  Lng: -73.320858),  Route carried "under" structure: State highway 908M,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 119,012 (year 2002),  Features Intersected: 908M908M07021063 WB, RTE,  Facility Carried by Structure: RTE 231
Minimum Vertical Clearance: 4.17m (13.68ft),  Kilometerpoint: 10.459,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 1059829,  Location: .9 MI W JCT RTS 231+SSP (Lat: 40.733147,  Lng: -73.338389),  Route carried "under" structure: Other road ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 1,200 (year 2021),  Features Intersected: BELMONT PK ENTR,  Facility Carried by Structure: RTE 908M
Minimum Vertical Clearance: 3.86m (12.66ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 9.1m (29.9ft)

Find on map >>   Show street view

Structure Number: 106401,  Location: 2.3 MI E JCT SH 27 & SH10 (Lat: 40.716289,  Lng: -73.322111),  Route carried "under" structure: State highway 27,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 51,000 (year 1979),  Features Intersected: 27 27 07051061 Service,,  Facility Carried by Structure: DEER PARK AVE
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 9.799,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.3m (56.8ft)