Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for North Bend, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 223ft / 68.5mTotal length
  • $63,310,000Total costs
  • 126,593Total average daily traffic
  • 11,350Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for North Bend
  • No street view available for this location

New bridges in North Bend, WA - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11930-1939
  • 31940-1949
  • 51970-1979
  • 21980-1989
  • 12000-2009
Average Bridge Daily Traffic in North Bend, WA
Average Bridge Truck Traffic in North Bend, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.1%Very good
  • 18.2%Good
  • 45.5%Satisfactory
  • 27.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Very good
  • 36.4%Good
  • 27.3%Satisfactory
  • 27.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 9.1%Very good
  • 45.5%Good
  • 27.3%Satisfactory
  • 18.2%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 44.4%Very good
  • 22.2%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 857A,  Location: 7.5 E JCT SR 203 (Lat: 47.501056,  Lng: -121.791222),  Route carried "on" structure: State highway 202,  Year Built: 1925,  Status: Posted for load,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 11,579 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 16,349 (year 2039),  Design Load: H 20,  Features Intersected: OVERFLOW CHANNEL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.234,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 26.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $864,000,  Roadway Improvement Cost: $173,000,  Total Project Cost: $1,728,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 2251A,  Location: 7.7 E JCT SR 203 (Lat: 47.500000,  Lng: -121.788333),  Route carried "on" structure: State highway 202,  Year Built: 1936,  Status: Open,  Structure Length: 13.81m (45.31ft),  Average Daily Traffic: 11,579 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 16,349 (year 2039),  Design Load: H 15,  Features Intersected: S FK SNOQUALMIE R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.476,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 16,  Length of Maximum Span: 29.0m (95.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 13.81m (45.31ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Bridge Improvement Cost: $3,262,000,  Roadway Improvement Cost: $652,000,  Total Project Cost: $6,523,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 10124C,  Location: 4.9 E JCT SR 18 (Lat: 47.488442,  Lng: -121.796956),  Route carried "on" structure: Interstate 90,  Year Built: 1976,  Status: Open,  Structure Length: 5.70m (18.70ft),  Average Daily Traffic: 19,864 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 28,047 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 202
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.182,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 25.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 19.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.70m (18.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,020,000,  Roadway Improvement Cost: $404,000,  Total Project Cost: $4,039,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10124D,  Location: 4.9 E JCT SR 18 (Lat: 47.488656,  Lng: -121.796572),  Route carried "on" structure: Interstate 90,  Year Built: 1975,  Status: Open,  Structure Length: 5.70m (18.70ft),  Average Daily Traffic: 19,864 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 28,047 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 202
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.182,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 25.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 19.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.70m (18.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,020,000,  Roadway Improvement Cost: $404,000,  Total Project Cost: $4,039,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10270A,  Location: 8.3 E JCT SR 203 (Lat: 47.492778,  Lng: -121.789694),  Route carried "on" structure: State highway 202,  Year Built: 1976,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 15,751 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 22,240 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: S FK SNOQUALMIE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.522,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,012,000,  Roadway Improvement Cost: $202,000,  Total Project Cost: $2,024,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 84602,  Location: 2.1 MI E OF SR 202 (Lat: 47.515917,  Lng: -121.769817),  Route carried "on" structure: County highway 87150,  Year Built: 1984,  Status: Open,  Structure Length: 11.98m (39.30ft),  Average Daily Traffic: 1,226 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,650 (year 2040),  Design Load: H 20,  Features Intersected: MIDDLE FORK SNOQUALMIE R,  Facility Carried by Structure: 428TH AVE SE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 64.0m (210.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.28m (40.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $6,126,000,  Roadway Improvement Cost: $1,225,000,  Total Project Cost: $12,251,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 85729,  Location: 3.1 MI E OF I-90 (Lat: 47.498544,  Lng: -121.793364),  Route carried "on" structure: City street 875,  Year Built: 1941,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 6,500 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,000 (year 2040),  Design Load: H 15,  Features Intersected: RIBARY CREEK,  Facility Carried by Structure: W NORTH BEND WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.27m (17.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $3,460,000,  Roadway Improvement Cost: $692,000,  Total Project Cost: $6,920,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8573,  Location: 0.1 MI E OF SR-202 (Lat: 47.488083,  Lng: -121.793603),  Route carried "on" structure: City street 875,  Year Built: 1989,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,900 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,300 (year 2040),  Features Intersected: RIBARY CREEK,  Facility Carried by Structure: SW MT SI BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 2.9m (9.5ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 21.1m (69.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $211,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $422,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 85731,  Location: 3.2 MI E OF I-90 (Lat: 47.497750,  Lng: -121.791778),  Route carried "on" structure: City street 875,  Year Built: 1941,  Status: Posted for load,  Structure Length: 14.23m (46.69ft),  Average Daily Traffic: 6,500 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,000 (year 2040),  Features Intersected: S FORK SNOQUALMIE RIVER,  Facility Carried by Structure: W NORTH BEND WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 9 degrees,  Material/Design: Concrete,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 5,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 14.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 11.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 14.54m (47.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $9,540,000,  Roadway Improvement Cost: $1,908,000,  Total Project Cost: $19,080,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 85732,  Location: 0.9 MI W OF SR-202 (Lat: 47.503672,  Lng: -121.804294),  Route carried "on" structure: City street 875,  Year Built: 1941,  Status: Posted for load,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 6,500 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,000 (year 2040),  Design Load: HS 15,  Features Intersected: GARDINERS CREEK,  Facility Carried by Structure: W NORTH BEND WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 30.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,637,000,  Roadway Improvement Cost: $327,000,  Total Project Cost: $3,274,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 87566,  Location: 0.2 MI W OF SR-202 (Lat: 47.499667,  Lng: -121.793111),  Route carried "on" structure: City street 875,  Year Built: 2006,  Status: Open,  Structure Length: 2.71m (8.89ft),  Average Daily Traffic: 700 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2039),  Design Load: HL 93,  Features Intersected: RIBARY CREEK,  Facility Carried by Structure: NW 8TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.02m (9.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,505,000,  Roadway Improvement Cost: $301,000,  Total Project Cost: $3,010,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10124C,  Location: 8.8 E JCT SR 203 (Lat: 47.488442,  Lng: -121.796956),  Route carried "under" structure: State highway 202,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 12,315 (year 2019),  Truck Traffic: 3%,  Features Intersected: SR 202,  Facility Carried by Structure: I-90
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 49.246,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 28.3m (92.8ft)

Find on map >>   Show street view

Structure Number: 10124D,  Location: 8.8 E JCT SR 203 (Lat: 47.488656,  Lng: -121.796572),  Route carried "under" structure: State highway 202,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 12,315 (year 2019),  Truck Traffic: 3%,  Features Intersected: SR 202,  Facility Carried by Structure: I-90
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 49.214,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 28.3m (92.8ft)

Discuss North Bend, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.