Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for North Puyallup, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 410ft / 125mTotal length
  • $73,756,000Total costs
  • 568,872Total average daily traffic
  • 49,276Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for North Puyallup
  • No street view available for this location

New bridges in North Puyallup, WA - historical statistics
  • New bridges - historical statistics
  • 101970-1979
  • 71980-1989
Average Bridge Daily Traffic in North Puyallup, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Very good
  • 50.0%Good
  • 40.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 70.0%Good
  • 20.0%Satisfactory
  • 10.0%Fair
Find on map >>   Show street view

Structure Number: 8746A,  Location: 0.1 E JCT SR 167 (Lat: 47.201250,  Lng: -122.254389),  Route carried "on" structure: State highway 410,  Year Built: 1971,  Status: Open,  Structure Length: 13.47m (44.19ft),  Average Daily Traffic: 48,070 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 69,605 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: WHITE R (STUCK R)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.468,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 64.0m (210.0ft),  Curb-To-Curb Width: 31.7m (104.0ft),  Out-to-Out Width: 33.2m (108.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.47m (44.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $5,127,000,  Roadway Improvement Cost: $1,025,000,  Total Project Cost: $10,254,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 9075B,  Location: 1.5 N JCT SR 161 (Lat: 47.200917,  Lng: -122.261417),  Route carried "on" structure: State highway 167,  Year Built: 1973,  Status: Open,  Structure Length: 4.91m (16.11ft),  Average Daily Traffic: 56,993 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 82,525 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: S-E RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.960,  Lanes on structure: 3,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.91m (16.11ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,803,000,  Roadway Improvement Cost: $361,000,  Total Project Cost: $3,606,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9075C,  Location: 1.8 N JCT SR 161 (Lat: 47.202250,  Lng: -122.256750),  Route carried "on" structure: State highway 167,  Year Built: 1971,  Status: Open,  Structure Length: 7.13m (23.39ft),  Average Daily Traffic: 31,550 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 45,684 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: W-S RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.346,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.13m (23.39ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $2,106,000,  Roadway Improvement Cost: $421,000,  Total Project Cost: $4,212,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9075D,  Location: 0.4 N JCT SR 410 (Lat: 47.203111,  Lng: -122.253444),  Route carried "on" structure: State highway 167,  Year Built: 1973,  Status: Open,  Structure Length: 27.46m (90.09ft),  Average Daily Traffic: 31,550 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 45,684 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: CITY STREETS & RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.619,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 15.4m (50.5ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 27.46m (90.09ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $9,370,000,  Roadway Improvement Cost: $1,874,000,  Total Project Cost: $18,741,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9075E,  Location: 2.7 E JCT SR 161 (Lat: 47.196583,  Lng: -122.281722),  Route carried "on" structure: City street ,  Year Built: 1972,  Status: Open,  Structure Length: 7.86m (25.79ft),  Average Daily Traffic: 1,750 (year 2008),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,289 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: SR 512,  Facility Carried by Structure: BENSTON DRIVE E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.961,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 27.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.86m (25.79ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2018,  Bridge Improvement Cost: $1,651,000,  Roadway Improvement Cost: $330,000,  Total Project Cost: $3,302,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9831A,  Location: 3.2 E JCT SR 161 (Lat: 47.202111,  Lng: -122.279028),  Route carried "on" structure: State highway 512,  Year Built: 1975,  Status: Open,  Structure Length: 10.27m (33.69ft),  Average Daily Traffic: 22,948 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 33,228 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 167
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.296,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 37.8m (124.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 18.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 14.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.27m (33.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,696,000,  Roadway Improvement Cost: $539,000,  Total Project Cost: $5,392,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13042A,  Location: 1.5 N JCT SR 161 (Lat: 47.201222,  Lng: -122.261581),  Route carried "on" structure: State highway 167,  Year Built: 1987,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 56,993 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 82,525 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: S-E RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.960,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,260,000,  Roadway Improvement Cost: $252,000,  Total Project Cost: $2,520,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 13042B,  Location: 1.8 N JCT SR 161 (Lat: 47.202417,  Lng: -122.257333),  Route carried "on" structure: State highway 167,  Year Built: 1988,  Status: Open,  Structure Length: 8.23m (27.00ft),  Average Daily Traffic: 31,550 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 45,684 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: W-S RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.314,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 15.3m (50.2ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 87.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.23m (27.00ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $2,808,000,  Roadway Improvement Cost: $562,000,  Total Project Cost: $5,616,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 13042C,  Location: 0.4 N JCT SR 410 (Lat: 47.203250,  Lng: -122.254417),  Route carried "on" structure: State highway 167,  Year Built: 1987,  Status: Open,  Structure Length: 30.85m (101.21ft),  Average Daily Traffic: 31,550 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 45,684 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: CITY STREETS & RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.571,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 34.7m (113.8ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 23.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 30.85m (101.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $8,096,000,  Roadway Improvement Cost: $1,619,000,  Total Project Cost: $16,192,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 13183A,  Location: 3.2 E JCT SR 161 (Lat: 47.202083,  Lng: -122.278778),  Route carried "on" structure: State highway 512,  Year Built: 1987,  Status: Open,  Structure Length: 10.30m (33.79ft),  Average Daily Traffic: 22,948 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 33,228 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 167
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.296,  Lanes on structure: 1,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.30m (33.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,960,000,  Roadway Improvement Cost: $392,000,  Total Project Cost: $3,921,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9075B,  Location: 0.7 N JCT SR 512 (Lat: 47.200917,  Lng: -122.261417),  Route carried "under" structure: Ramp State highway 167,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 14,249 (year 2019),  Truck Traffic: 8%,  Features Intersected: S-E RAMP
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 0.547,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>   Show street view

Structure Number: 9075C,  Location: JCT SR 167 (Lat: 47.202250,  Lng: -122.256750),  Route carried "under" structure: State highway 410,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 24,035 (year 2019),  Truck Traffic: 7%,  Features Intersected: W-S RAMP,  Facility Carried by Structure: SR 167
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 14.275,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 9075E,  Location: 2.7 E JCT SR 161 (Lat: 47.196583,  Lng: -122.281722),  Route carried "under" structure: State highway 512,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 98,026 (year 2019),  Truck Traffic: 8%,  Features Intersected: SR 512,  Facility Carried by Structure: BENSTON DRIVE E
Minimum Vertical Clearance: 6.07m (19.91ft),  Kilometerpoint: 18.636,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 9831A,  Location: 0.7 N JCT SR 161 (Lat: 47.202111,  Lng: -122.279028),  Route carried "under" structure: State highway 167,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 29,188 (year 2019),  Truck Traffic: 12%,  Features Intersected: SR 167,  Facility Carried by Structure: SR 512
Minimum Vertical Clearance: 6.07m (19.91ft),  Kilometerpoint: 9.624,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>   Show street view

Structure Number: 13042A,  Location: 0.7 N JCT SR 512 (Lat: 47.201222,  Lng: -122.261581),  Route carried "under" structure: State highway 167,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 14,249 (year 2019),  Truck Traffic: 8%,  Features Intersected: S-E RAMP
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 18.0m (59.1ft)

Find on map >>   Show street view

Structure Number: 13042B,  Location: JCT SR 167 (Lat: 47.202417,  Lng: -122.257333),  Route carried "under" structure: State highway 410,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 24,035 (year 2019),  Truck Traffic: 7%,  Features Intersected: W-S RAMP,  Facility Carried by Structure: SR 167
Minimum Vertical Clearance: 5.89m (19.32ft),  Kilometerpoint: 14.227,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 13183A,  Location: 0.7 N JCT SR 161 (Lat: 47.202083,  Lng: -122.278778),  Route carried "under" structure: State highway 167,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 29,188 (year 2019),  Truck Traffic: 12%,  Features Intersected: SR 167,  Facility Carried by Structure: SR 512
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 9.656,  Lanes on structure: 1,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Discuss North Puyallup, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.