Bridge Statistics for North Wantagh, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 27Number of bridges
  • 105ft / 31.7mTotal length
  • $72,275,000Total costs
  • 1,783,744Total average daily traffic
  • 6,364Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for North Wantagh
  • No street view available for this location

New bridges in North Wantagh, NY - historical statistics
  • New bridges - historical statistics
  • 71930-1939
  • 51950-1959
  • 151960-1969
Average Bridge Daily Traffic in North Wantagh, NY
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 27.3%Very good
  • 45.5%Good
  • 18.2%Satisfactory
  • 9.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 45.5%Very good
  • 36.4%Good
  • 18.2%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Satisfactory
  • 50.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 75.0%Good
  • 25.0%Satisfactory
Find on map >>   Show street view

Structure Number: 103674,  Location: .4 MI S JCT RTS SSP+WSP (Lat: 40.692150,  Lng: -73.518264),  Route carried "on" structure: State highway 105,  Year Built: 1932,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 15,139 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 18,390 (year 2040),  Design Load: H 20,  Features Intersected: RTE 908T
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.011,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Superstructure: Good,  Substructure: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.52m (8.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $2,951,000,  Roadway Improvement Cost: $1,728,000,  Total Project Cost: $4,679,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1036759,  Location: JCT RTS 105+135 (Lat: 40.691050,  Lng: -73.494789),  Route carried "on" structure: State highway 135,  Year Built: 1965,  Status: Open,  Structure Length: 5.88m (19.29ft),  Average Daily Traffic: 57,712 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 68,648 (year 2040),  Design Load: H 20,  Features Intersected: RTE 105
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.864,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.5m (86.9ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.8m (61.7ft),  Curb-To-Curb Width: 26.5m (86.9ft),  Out-to-Out Width: 29.0m (95.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 19.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 15.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.88m (19.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $6,660,000,  Roadway Improvement Cost: $3,900,000,  Total Project Cost: $10,560,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1037089,  Location: .7 MI E JCT RTS SSP+WSP (Lat: 40.699697,  Lng: -73.506453),  Route carried "on" structure: Other road ,  Year Built: 1956,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 34,503 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 41,914 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 908M,  Facility Carried by Structure: WANTAGH AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.926,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.3m (79.7ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 21.0m (68.9ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 90.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $4,254,000,  Roadway Improvement Cost: $2,491,000,  Total Project Cost: $6,745,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1056579,  Location: JCT RTS SSP+WSP (Lat: 40.698594,  Lng: -73.521181),  Route carried "on" structure: State highway 908M,  Year Built: 1956,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 167,213 (year 2020),  Average Future Daily Traffic: 198,899 (year 2040),  Features Intersected: DRAIN-FOREST C PK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.890,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 49.4m (162.1ft),  Skew: 32 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 74.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,709,000,  Roadway Improvement Cost: $1,001,000,  Total Project Cost: $2,710,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1056689,  Location: JCT RTS SSP+WSP (Lat: 40.701911,  Lng: -73.521197),  Route carried "on" structure: State highway 908T,  Year Built: 1938,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 65,299 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 77,673 (year 2040),  Design Load: HS 20,  Features Intersected: DRAIN-FOREST C PK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.711,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.5m (86.9ft),  Skew: 22 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 74.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $772,000,  Roadway Improvement Cost: $452,000,  Total Project Cost: $1,224,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 105669,  Location: JCT RTS SSP+WSP (Lat: 40.701058,  Lng: -73.521067),  Route carried "on" structure: Ramp State highway ,  Year Built: 1965,  Status: Open,  Structure Length: 0.70m (2.30ft),  Truck Traffic: 2%,  Design Load: HS 20,  Features Intersected: DRAIN-FOREST C PK,  Facility Carried by Structure: WSP SB TO SSP WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 5 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $518,000,  Roadway Improvement Cost: $303,000,  Total Project Cost: $822,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1056709,  Location: JCT RTS SSP+WSP (Lat: 40.699789,  Lng: -73.521042),  Route carried "on" structure: Ramp Other road ,  Year Built: 1965,  Status: Open,  Structure Length: 0.73m (2.40ft),  Truck Traffic: 2%,  Design Load: H 20,  Features Intersected: DRAIN-FOREST C PK,  Facility Carried by Structure: SSP WB TO WSP SB &
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.467,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Inventory Rating: 65.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $378,000,  Roadway Improvement Cost: $221,000,  Total Project Cost: $599,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1057049,  Location: .7 MILE E JCT SSP & WSP (Lat: 40.700006,  Lng: -73.506369),  Route carried "on" structure: Other road ,  Year Built: 1931,  Status: Open,  Structure Length: 2.37m (7.78ft),  Average Daily Traffic: 34,503 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 41,914 (year 2040),  Features Intersected: RTE 908M,  Facility Carried by Structure: WANTAGH AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.990,  Lanes on structure: 4,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 21.0m (68.9ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.37m (7.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $3,567,000,  Roadway Improvement Cost: $2,089,000,  Total Project Cost: $5,655,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1057651,  Location: JCT RTS SSP+WSP (Lat: 40.698789,  Lng: -73.520131),  Route carried "on" structure: State highway 908T,  Year Built: 1965,  Status: Open,  Structure Length: 2.32m (7.61ft),  Truck Traffic: 2%,  Design Load: HS 20,  Features Intersected: RTE 908M
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 18.6m (61.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 18.6m (61.0ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Superstructure: Very good,  Substructure: Very good,  Operating Rating: 87.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.31m (7.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $3,929,000,  Roadway Improvement Cost: $2,301,000,  Total Project Cost: $6,230,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1057652,  Location: JCT RTS SSP+WSP (Lat: 40.698581,  Lng: -73.518592),  Route carried "on" structure: State highway 908T,  Year Built: 1956,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 32,650 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 38,836 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 908M
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.228,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.6m (61.0ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.2m (72.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 5.5m (18.0ft),  Curb-To-Curb Width: 17.4m (57.1ft),  Out-to-Out Width: 27.9m (91.5ft)

Condition: Superstructure: Very good,  Substructure: Very good,  Operating Rating: 88.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.37m (7.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $5,418,000,  Roadway Improvement Cost: $3,173,000,  Total Project Cost: $8,591,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 10577,  Location: JCT RTS 105 & WSP (Lat: 40.692125,  Lng: -73.518736),  Route carried "on" structure: State highway 105,  Year Built: 1967,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 15,139 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 18,390 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 908T
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.011,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.1m (75.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Superstructure: Good,  Substructure: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.52m (8.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $3,437,000,  Roadway Improvement Cost: $2,013,000,  Total Project Cost: $5,450,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 105855,  Location: JCT RTS SSP+WSP (Lat: 40.696939,  Lng: -73.519006),  Route carried "on" structure: Ramp State highway ,  Year Built: 1965,  Status: Open,  Structure Length: 1.89m (6.20ft),  Truck Traffic: 2%,  Design Load: HS 20,  Features Intersected: RTE 908T,  Facility Carried by Structure: WSP SB TO SSP EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 1,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.3m (56.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Superstructure: Good,  Substructure: Very good,  Operating Rating: 84.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,574,000,  Roadway Improvement Cost: $922,000,  Total Project Cost: $2,496,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 105856,  Location: JCT RTS SSP+WSP (Lat: 40.700142,  Lng: -73.520356),  Route carried "on" structure: Ramp State highway ,  Year Built: 1965,  Status: Open,  Structure Length: 2.04m (6.69ft),  Truck Traffic: 2%,  Design Load: HS 20,  Features Intersected: RTE 908T,  Facility Carried by Structure: WSP NB TO SSP WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.8m (61.7ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Superstructure: Very good,  Substructure: Very good,  Operating Rating: 86.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,792,000,  Roadway Improvement Cost: $1,049,000,  Total Project Cost: $2,841,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1059651,  Location: JCT RTS SSP+WSP (Lat: 40.698428,  Lng: -73.520133),  Route carried "on" structure: State highway 908T,  Year Built: 1965,  Status: Open,  Structure Length: 2.32m (7.61ft),  Truck Traffic: 2%,  Design Load: HS 20,  Features Intersected: RTE 908M
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 4,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 18.6m (61.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 18.6m (61.0ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Superstructure: Good,  Substructure: Very good,  Operating Rating: 87.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.31m (7.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $3,929,000,  Roadway Improvement Cost: $2,301,000,  Total Project Cost: $6,230,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1059652,  Location: JCT RTS SSP+WSP (Lat: 40.698269,  Lng: -73.518558),  Route carried "on" structure: State highway 908T,  Year Built: 1931,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 32,650 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 38,836 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 908M
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.277,  Lanes on structure: 4,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.6m (61.0ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.6m (57.7ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 5.5m (18.0ft),  Curb-To-Curb Width: 18.0m (59.1ft),  Out-to-Out Width: 27.9m (91.5ft)

Condition: Superstructure: Fair,  Substructure: Good,  Operating Rating: 85.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $4,694,000,  Roadway Improvement Cost: $2,749,000,  Total Project Cost: $7,443,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 103674,  Location: .4 MI S JCT RTS SSP+WSP (Lat: 40.692150,  Lng: -73.518264),  Route carried "under" structure: State highway 908T,  Year Built: 1932,  Structure Length: 0. m,  Average Daily Traffic: 31,155 (year 2002),  Features Intersected: RTE 908T,  Facility Carried by Structure: RTE 105
Minimum Vertical Clearance: 4.45m (14.60ft),  Kilometerpoint: 11.279,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 1036759,  Location: JCT RTS 105+135 (Lat: 40.691050,  Lng: -73.494789),  Route carried "under" structure: State highway 105,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 16,342 (year 2002),  Features Intersected: RTE 105,  Facility Carried by Structure: RTE 135
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 4.167,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.8m (61.7ft)

Find on map >>   Show street view

Structure Number: 1037089,  Location: .7 MI E JCT RTS SSP+WSP (Lat: 40.699697,  Lng: -73.506453),  Route carried "under" structure: State highway 908M,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 209,621 (year 2002),  Features Intersected: RTE 908M,  Facility Carried by Structure: WANTAGH AVENUE
Minimum Vertical Clearance: 4.14m (13.58ft),  Kilometerpoint: 4.023,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 24.3m (79.7ft)

Find on map >>   Show street view

Structure Number: 10378,  Location: .3 MI S JCT RTS 135 & SSP (Lat: 40.696803,  Lng: -73.492414),  Route carried "under" structure: State highway ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2021),  Features Intersected: 135 135 03011033, RTE 13,  Facility Carried by Structure: PED BR S OF SSP
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 3.878,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 1057049,  Location: .7 MILE E JCT SSP & WSP (Lat: 40.700006,  Lng: -73.506369),  Route carried "under" structure: State highway 908M,  Year Built: 1931,  Structure Length: 0. m,  Average Daily Traffic: 209,621 (year 2002),  Features Intersected: RTE 908M,  Facility Carried by Structure: WANTAGH AVENUE
Minimum Vertical Clearance: 4.01m (13.16ft),  Kilometerpoint: 4.023,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 1057651,  Location: JCT RTS SSP+WSP (Lat: 40.698789,  Lng: -73.520131),  Route carried "under" structure: State highway 908M,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 191,933 (year 2002),  Features Intersected: RTE 908M,  Facility Carried by Structure: RTE 908T
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 19.147,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 1057652,  Location: JCT RTS SSP+WSP (Lat: 40.698581,  Lng: -73.518592),  Route carried "under" structure: State highway 908M,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 191,933 (year 2002),  Features Intersected: RTE 908M,  Facility Carried by Structure: RTE 908T
Minimum Vertical Clearance: 4.06m (13.32ft),  Kilometerpoint: 19.147,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 22.2m (72.8ft)

Find on map >>   Show street view

Structure Number: 10577,  Location: JCT RTS 105 & WSP (Lat: 40.692125,  Lng: -73.518736),  Route carried "under" structure: State highway 908T,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 31,155 (year 2002),  Features Intersected: RTE 908T,  Facility Carried by Structure: RTE 105
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 11.279,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 23.1m (75.8ft)

Find on map >>   Show street view

Structure Number: 105855,  Location: JCT RTS SSP+WSP (Lat: 40.696939,  Lng: -73.519006),  Route carried "under" structure: State highway 908T,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 31,155 (year 2002),  Features Intersected: RTE 908T,  Facility Carried by Structure: WSP SB TO SSP EB
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 11.874,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 17.3m (56.8ft)

Find on map >>   Show street view

Structure Number: 105856,  Location: JCT RTS SSP+WSP (Lat: 40.700142,  Lng: -73.520356),  Route carried "under" structure: State highway 908T,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 31,155 (year 2002),  Features Intersected: RTE 908T,  Facility Carried by Structure: WSP NB TO SSP WB
Minimum Vertical Clearance: 4.26m (13.98ft),  Kilometerpoint: 12.196,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 18.8m (61.7ft)

Find on map >>   Show street view

Structure Number: 1059651,  Location: JCT RTS SSP+WSP (Lat: 40.698428,  Lng: -73.520133),  Route carried "under" structure: State highway 908M,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 191,933 (year 2002),  Features Intersected: RTE 908M,  Facility Carried by Structure: RTE 908T
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 19.147,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 1059652,  Location: JCT RTS SSP+WSP (Lat: 40.698269,  Lng: -73.518558),  Route carried "under" structure: State highway 908M,  Year Built: 1931,  Structure Length: 0. m,  Average Daily Traffic: 191,933 (year 2002),  Features Intersected: RTE 908M,  Facility Carried by Structure: RTE 908T
Minimum Vertical Clearance: 3.84m (12.60ft),  Kilometerpoint: 19.147,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 17.6m (57.7ft)