Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Oakman, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 151ft / 46.0mTotal length
  • $13,270,000Total costs
  • 13,394Total average daily traffic
  • 1,775Total average daily truck traffic
  • 17,567Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Oakman
  • No street view available for this location

New bridges in Oakman, AL - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 41940-1949
  • 61960-1969
  • 11970-1979
  • 11980-1989
  • 22000-2009
Average Bridge Daily Traffic in Oakman, AL
Average Bridge Truck Traffic in Oakman, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.7%Very good
  • 30.8%Good
  • 15.4%Satisfactory
  • 46.2%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 38.5%Good
  • 38.5%Satisfactory
  • 23.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.7%Very good
  • 38.5%Good
  • 30.8%Satisfactory
  • 7.7%Fair
  • 15.4%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.3%Very good
  • 6.3%Good
  • 43.8%Satisfactory
  • 37.5%Fair
  • 6.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 75.0%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 827,  Location: 0.6 MILE WEST OF CORD 13 (Lat: 34.194889,  Lng: -88.158667),  Route carried "on" structure: County highway 94,  Year Built: 1930,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 105 (year 2001),  Truck Traffic: 10%,  Average Future Daily Traffic: 202 (year 2036),  Features Intersected: DRY CREEK
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 83.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $311,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $342,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 973,  Location: 2 MI WEST JCT AL 69 (Lat: 33.700900,  Lng: -87.453100),  Route carried "on" structure: State highway 18,  Year Built: 1932,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 1,130 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,379 (year 2041),  Features Intersected: Whiterock Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 92.537,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.5m (24.6ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 84.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $388,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $427,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1612,  Location: AL 69 * WOLF CK (Lat: 33.672761,  Lng: -87.387706),  Route carried "on" structure: State highway 69,  Year Built: 1937,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 1,694 (year 2013),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,963 (year 2041),  Design Load: H 15,  Features Intersected: Wolf Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 299.821,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 52.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.89m (22.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,181,000,  Roadway Improvement Cost: $118,000,  Total Project Cost: $1,299,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 221,  Location: COAL VALLEY (Lat: 33.750000,  Lng: -87.433333),  Route carried "on" structure: County highway ,  Year Built: 1940,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 325 (year 1991),  Truck Traffic: 10%,  Average Future Daily Traffic: 550 (year 2031),  Features Intersected: CANE CREEK,  Facility Carried by Structure: COAL VALLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $255,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $281,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2211,  Location: COAL VALLEY (Lat: 33.716667,  Lng: -87.433333),  Route carried "on" structure: County highway ,  Year Built: 1940,  Status: Open,  Structure Length: 2.71m (8.89ft),  Average Daily Traffic: 325 (year 1991),  Truck Traffic: 20%,  Average Future Daily Traffic: 550 (year 2031),  Features Intersected: CANE CREEK,  Facility Carried by Structure: COAL VALLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.63m (11.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $523,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $575,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2212,  Location: 3 MILE E OAKMAN (Lat: 33.716667,  Lng: -87.350000),  Route carried "on" structure: County highway ,  Year Built: 1940,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 425 (year 1991),  Truck Traffic: 10%,  Average Future Daily Traffic: 595 (year 2032),  Features Intersected: UNNAMED BRANCH,  Facility Carried by Structure: PROVIDENCE LOOP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $255,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $281,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2213,  Location: 1 1/2 MILE W PARRISH (Lat: 33.716667,  Lng: -87.333333),  Route carried "on" structure: County highway 20,  Year Built: 1940,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 1,000 (year 1991),  Truck Traffic: 40%,  Average Future Daily Traffic: 1,100 (year 2031),  Design Load: H 15,  Features Intersected: SOUTHERN RR,  Facility Carried by Structure: OLD PARRISH OAKMAN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 48.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.04m (9.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $521,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $573,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6888,  Location: 1 MILE W HWY 69 (Lat: 33.766667,  Lng: -87.383333),  Route carried "on" structure: County highway ,  Year Built: 1960,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 250 (year 1991),  Truck Traffic: 10%,  Average Future Daily Traffic: 220 (year 2032),  Design Load: HS 20,  Features Intersected: PUMPKIN CREEK,  Facility Carried by Structure: PLEASANT GROVE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 80.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $167,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $184,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6889,  Location: 1/2 MILE S OAKMAN (Lat: 33.706389,  Lng: -87.379111),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Posted for load,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 30 (year 1991),  Average Future Daily Traffic: 75 (year 2031),  Design Load: H 15,  Features Intersected: CANE CREEK,  Facility Carried by Structure: DAY HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 7.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 5.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.54m (8.33ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Critical Feature Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $209,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $230,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 7812,  Location: 150 FT E OF I59 (Lat: 34.415278,  Lng: -85.771156),  Route carried "on" structure: County highway 280,  Year Built: 1962,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 98 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 146 (year 2041),  Design Load: H 15,  Features Intersected: TRIB. TO BIG WILLS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 65.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $424,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $466,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8115,  Location: .2 MI E US 43 CO B67 JCT (Lat: 34.565392,  Lng: -87.681586),  Route carried "on" structure: County highway B67,  Year Built: 1964,  Status: Posted for load,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 495 (year 1986),  Truck Traffic: 4%,  Average Future Daily Traffic: 738 (year 2036),  Features Intersected: STINKING BEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.5m (24.6ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Fair,  Operating Rating: 18.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Underwater Inspection Date: October 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $212,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $233,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8271,  Location: 2.6 MI. E. OF PRARIEVILLE (Lat: 32.510000,  Lng: -87.645000),  Route carried "on" structure: County highway 12,  Year Built: 1964,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 200 (year 1991),  Truck Traffic: 1%,  Average Future Daily Traffic: 400 (year 2031),  Design Load: H 15,  Features Intersected: TRIB. TO COTTONWOOD CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 48.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.15m (10.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $606,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $667,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 8272,  Location: 3.0 MI. E. OF PRARIEVILLE (Lat: 32.510000,  Lng: -87.641667),  Route carried "on" structure: County highway 12,  Year Built: 1964,  Status: Open,  Structure Length: 5.82m (19.09ft),  Average Daily Traffic: 300 (year 1991),  Truck Traffic: 1%,  Average Future Daily Traffic: 400 (year 2031),  Design Load: H 15,  Features Intersected: COTTONWOOD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Poor,  Operating Rating: 48.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.86m (22.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,316,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $1,448,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1384,  Location: 2 MILES S OAKMAN (Lat: 33.700000,  Lng: -87.350000),  Route carried "on" structure: County highway ,  Year Built: 1974,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 425 (year 1991),  Truck Traffic: 70%,  Average Future Daily Traffic: 595 (year 2032),  Design Load: HS 20,  Features Intersected: CANE CREEK,  Facility Carried by Structure: DIXIE SPRINGS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $329,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $362,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 14924,  Location: .1 MI South Oakman (Lat: 33.709275,  Lng: -87.390625),  Route carried "on" structure: State highway 69,  Year Built: 1989,  Status: Open,  Structure Length: 1.97m (6.46ft),  Average Daily Traffic: 2,912 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,874 (year 2041),  Design Load: HS 20,  Features Intersected: Cane Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 304.382,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.71m (8.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,316,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $1,448,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1696,  Location: AL-69 at Lost Creek (Lat: 33.763333,  Lng: -87.358333),  Route carried "on" structure: State highway 69,  Year Built: 2004,  Status: Open,  Structure Length: 10.70m (35.10ft),  Average Daily Traffic: 3,600 (year 2013),  Truck Traffic: 13%,  Average Future Daily Traffic: 4,680 (year 2041),  Design Load: HS 20,  Features Intersected: Lost Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 311.328,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.60m (38.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $3,342,000,  Roadway Improvement Cost: $334,000,  Total Project Cost: $3,676,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17955,  Location: 1 MILE WEST AL HWY 69 (Lat: 33.683333,  Lng: -87.416667),  Route carried "on" structure: County highway ,  Year Built: 2000,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 80 (year 2000),  Average Future Daily Traffic: 100 (year 2032),  Design Load: HS 20,  Features Intersected: WOLF CREEK,  Facility Carried by Structure: BLUEWATER ROAD
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Toll: Toll bridge is a segment,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel continuous,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 4.91m (16.11ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Critical Feature Inspection Date: January 2022,  Bridge Improvement Cost: $707,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $778,000 ( Estimate for 2022),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Oakman, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.